Today
Design fixes most of a product's cost. Yet designers only learn what a part costs when purchasing gets a quote or the first job costing comes in. By then the drawing is released, and every change is expensive.
An example
At Ebert & Lorenz Maschinenbau, engineers are designing a new S355 welded frame for a 250 kN press. The agent finds five similar frames with actual costs, estimates the manufacturing cost with a range and points out that the tighter flatness tolerance on the clamping surface adds a milling step.
Your data, wherever it lives
Geometry and part data sit today in CAD and the PLM, routings and actual costs from job costing in the ERP, machine-hour rates in the controlling team's spreadsheets and supplier prices in the ERP and in quotes as PDFs. demi reads, understands and links them per part and product family, with your rights. The AI estimates the manufacturing cost of a new part at the draft stage in minutes, not after purchasing gets a quote, and the designer decides what to change.
Where the data lives today
- CAD & drawings
- PLM
- ERP
- Office files
- PDFs
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from CAD, PLM, ERP and spreadsheets. demi replaces nothing and links part data with routings, machine-hour rates, actual job costs and supplier prices, per part and product family. The estimate is available per part, visible to design and purchasing; demi only writes back after approval.
- 2 · PermitPermission Layer
Designers see the cost estimate but not individual supplier prices. Only finance maintains the rates, and every estimate is recorded with its version.
- 3 · ActIntelligence Layer
The agent finds parts that are similar in geometry and function, derives the cost drivers and estimates material, manufacturing and bought-in cost with a range. Every estimate names its reference parts; the rates come from finance, never from the model.
How it runs
- 1
The new part comes from CAD or PLM, even as an early draft.
- 2
The agent looks for similar parts with routings and actual costs.
- 3
It estimates material, machining and bought-in parts separately, each with a range.
- 4
It shows which feature drives the cost most.
- 5
The estimate stays with the part, visible to design and purchasing.
What changes
Design decisions made with cost in view
Fewer surprises at the first quote
Clearer target prices for purchasing
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+216 hfreed per year
Assumptions and calculation
demi estimates material, production and bought-in costs from similar parts; you weigh up the design.
60 min → 42 min per case
How we calculate
60 cost estimates × 60 min × 30% × 1.0 (manual) × 12 months = 12,960 min = 216 h
Value per year, before demi costs
Freed per year+216 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€14,040
gained per year
216 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
How accurate is an estimate when there is no finished drawing yet?
The less is fixed, the wider the range, and the estimate says so openly. Material, dimensions and rough features are already enough to find similar parts. With every design step the range gets narrower.
What data about our machines does it need?
Routings and machine-hour rates from the ERP, plus actual costs from job costing. Where rates live in spreadsheets today, demi connects those spreadsheets. The rates stay under the control of finance.
Does purchasing see the same estimate?
Yes. The estimate sits with the part, and purchasing uses it, with the same reference parts, as a target for its requests. Designers, in turn, never see individual supplier prices, only the result.
Does this replace our costing?
No. The estimate supports decisions during design. The binding calculation for quotes and orders stays with finance or production planning, based on the same data.
