Today
Rules on packaging, electrical equipment and batteries ask for volumes per material and category, often for each country separately. The weights sit in spreadsheets or nowhere at all. The reports are pieced together by hand just before the deadline.
An example
For the annual report, the agent at Wallner+Hardt Sensortechnik totals 41 tonnes of cardboard and 6 tonnes of plastic film across 1,900 articles. It reports the WS pressure sensors as electrical equipment, split by country. It also lists 73 articles that still have no packaging weight.
Your data, wherever it lives
Item master data, BOMs and sales per country sit today in the ERP, packaging weights in the PIM, in spreadsheets or nowhere, packaging specifications and supplier declarations as PDFs in folders and e-mails. demi reads, understands and links them per article into one packaging and material profile, with your rights. The AI adds up volumes per material, category and country in hours instead of someone filling spreadsheets for days before the deadline, and the responsible person approves the report.
Where the data lives today
- ERP
- Databases
- Office files
- PDFs
- E-mails
- Folders & drives
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from the ERP, PIM and spreadsheets. demi replaces nothing and links the article master, packaging specifications, BOMs, sales per country and supplier declarations into one packaging and material profile per article. demi only writes back after approval.
- 2 · PermitPermission Layer
Compliance and sales administration see the volumes. The responsible person approves every report, and every figure stays traceable down to the article.
- 3 · ActIntelligence Layer
The agent fills in missing packaging weights from specifications and supplier data, each with its source, and totals the volumes per material, category and country by fixed rules. It compares with the previous period and lists articles without data instead of guessing.
How it runs
- 1
demi analyzes the article master, bills of materials and sales per country.
- 2
The agent fills in missing weights from specifications and supplier data.
- 3
Articles without reliable data go on a list for clarification.
- 4
It totals the volumes per material, category and country and compares them with the previous period.
- 5
The responsible person reviews the prepared report and approves it.
What changes
Reports based on real sales data
Gaps in packaging data made visible
Less risk of late or wrong reports
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+77 hfreed per year
Assumptions and calculation
demi works out packaging, device and battery volumes from master data and sales; you file.
16 h → 9.6 h per case
How we calculate
1 volume reports × 16 h × 40% × 1.0 (manual) × 12 months = 77 h
Value per year, before demi costs
Freed per year+77 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€5,005
gained per year
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Which regulations and countries does this cover?
That depends on where you place goods on the market. You decide which countries and categories you report for, and demi calculates the volumes in exactly that breakdown. Your team maintains the rules for each country.
Where do the packaging weights come from?
From packaging specifications, bills of materials and your suppliers' declarations. Every value filled in shows its source. If a value is missing, the article goes on the clarification list and is not estimated.
Can demi prepare packaging conformity documents too?
Yes, as a draft. The agent collects material data and supplier declarations per packaging item and puts them together. The responsible person still has to check and sign them.
Who is responsible for the report?
Your company. demi works out the volumes, shows the gaps and prepares the report. The legal assessment of which obligations apply to you stays with your experts.
