Today
Spare-parts catalogues are made by hand from the engineering BOM, often months after delivery. By then they do not match the machine that was actually built. Customers order by description and sales has to guess.
An example
For the MZ assembly cell with serial number 24-118 at Ebert & Lorenz Maschinenbau, the agent builds a catalogue of 312 service parts from 4,800 BOM lines. It marks 27 of them as wear parts with a recommended stock quantity.
Your data, wherever it lives
The as-built BOM sits today in the PLM and ERP, drawings in the CAD system, old catalogues as PDFs in folders, and which parts wear out is recorded in service cases. demi reads, understands and links it to the serial number of every machine, with your rights. The AI drafts the catalogue in minutes instead of a full working day by hand, and service decides what the customer sees.
Where the data lives today
- PLM
- ERP
- CAD & drawings
- PDFs
- Folders & drives
- Tickets
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from the PLM, ERP and CAD. demi replaces nothing and links the as-built BOM, drawings, part master data and wear-part flags to the serial number of every machine. demi provides the approved catalogue as a PDF.
- 2 · PermitPermission Layer
Customers and dealers see only the catalogues of their own machines; internal costs and supplier data stay hidden. Service reviews and approves the catalogue, and this is recorded.
- 3 · ActIntelligence Layer
The agent filters the service-relevant parts, assigns item numbers to drawing views and marks wear parts from service history. Every line is a real part number from that serial number's BOM, nothing is invented, and when the machine changes, the catalogue follows.
How it runs
- 1
Pick a serial number, or demi starts at delivery
- 2
Filter the service-relevant parts from the BOM
- 3
Assign item numbers to the drawing views
- 4
Mark wear parts and recommended stock
- 5
Service reviews; the catalogue ships as a PDF or in the portal
What changes
Catalogue ready at delivery
The right part ordered first time
More spare-parts business
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+307 hfreed per year
Assumptions and calculation
demi turns the bill of materials into a catalogue with wear parts and stock advice; you approve.
8 h → 4.8 h per case
How we calculate
8 spare-parts catalogues × 8 h × 40% × 1.0 (manual) × 12 months = 307 h
Value per year, before demi costs
Freed per year+307 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€19,955
gained per year
307 h ÷ 1,760 h per role = 0.2 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Does it use the as-built or the engineering BOM?
The as-built BOM of the serial number, meaning what was actually built. Deviations from the design, such as swapped purchased parts, are already in it. The engineering BOM is only used for comparison.
Can customers order straight from the catalogue?
Yes, through a connected portal or by e-mail. The order then carries the exact part number and becomes a checked draft. The case needs prices and lead times from the ERP.
How are changes after delivery handled?
When service swaps a part for another, the service report records it and demi updates that machine's catalogue. The earlier version stays visible in the history.
How does demi know which parts are wear parts?
From the flag in the article master and from service history: demi suggests parts that were often replaced on similar machines. Engineering confirms the selection before it appears in the catalogue.
