Today
When a mould is built, roughing and finishing electrodes in graphite or copper are milled for every cavity, and many still sit on racks today. When the mould comes back for repair years later, nobody finds them: the electrode number is in the CAM program, the location in a list, the wear nowhere. So electrodes are programmed, milled and measured again, often ones that already exist.
An example
At Norvelta, the 8-cavity mould SW-2216 comes in for repair with a damaged rib in cavity 5. The agent finds three graphite electrodes in the store that were milled for revision C of this rib: two roughing electrodes with 0.25 mm undersize and one finishing electrode with 0.08 mm. According to its measurement report, the finishing electrode shows 0.02 mm of edge wear, more than the ± 0.005 mm tolerance allows, so the agent proposes milling it again; the CAM program for it still exists. The insert is now at revision D, but the rib did not change. The EDM operator takes the two roughing electrodes from rack E3, slot 14, and only one electrode goes to the milling shop.
Your data, wherever it lives
What is known about your electrodes sits in many places today: numbers and undersizes in CAD and CAM, measurement reports in folders and spreadsheets, EDM runs in the MES, repair orders in the ERP, storage locations in the electrode database, on lists or only on the holder. demi reads, understands and links them per tool and contour, with your rights. AI finds the matching electrodes in seconds and checks wear and revision; what is eroded, re-milled or milled new is decided by your EDM operator.
Where the data lives today
- CAD & drawings
- MES
- ERP
- Databases
- Office files
- Folders & drives
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from CAD and CAM, the MES, the ERP and electrode lists. demi replaces nothing and links every electrode to its tool, insert, cavity and contour area, and to its material, undersize, measurement report, EDM runs and storage location. It also keeps the revision of the insert the electrode was milled for.
- 2 · PermitPermission Layer
Customers' design data is visible only to the people working on that tool. Whether an electrode is reused, re-milled or milled new is decided by the EDM operator or the shop manager, and new milling jobs reach planning only after that release. Scrapping electrodes is released by the shop manager.
- 3 · ActIntelligence Layer
Through tool, insert and contour area the agent finds every electrode for the repair spot and checks whether the insert has changed since the electrode was milled. It reads undersize and wear from measurement reports and EDM data, never from estimates; if a measurement is missing, it asks for one before use. The language model only explains why an electrode fits or not.
How it runs
- 1
A mould comes in for repair or change, with the order, photos and the damaged spot.
- 2
demi finds every electrode milled for this insert and this contour area, with its storage location.
- 3
For each electrode the agent shows material, undersize, wear, past EDM runs and the revision it was milled for.
- 4
It proposes which electrodes are reused, re-milled or milled new, each with its reason.
- 5
The EDM operator checks and decides; new milling jobs reach planning only after that release.
What changes
Electrodes found in minutes, not searched for on the racks
Less programming, milling and measuring for electrodes that already exist
Repaired moulds back with the customer sooner
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+162 hfreed per year
Assumptions and calculation
demi finds electrodes with undersize, wear and location; you decide what is reused or re-milled.
90 min → 63 min per case
How we calculate
30 mould repairs × 90 min × 30% × 1.0 (manual) × 12 months = 9,720 min = 162 h
Value per year, before demi costs
Freed per year+162 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€10,530
gained per year
162 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
How does demi know which electrode belongs to which contour?
From the CAM data: each electrode was derived from a surface area of the insert, and its number is in the program, the electrode list and on the holder. demi links this to tool, insert, cavity and contour area. For old electrodes with only a handwritten label, the agent matches by tool number and photo and flags uncertain matches.
How does demi tell whether an electrode is still within size?
From the measurement reports after milling and after each EDM run, and from the number of runs in the EDM machine's data. If there is no current measurement, the agent proposes measuring the electrode before use. It never estimates wear.
What if the insert has changed since the mould was built?
Then the agent compares the revision the electrode was milled for with the insert's current revision in CAD. If the contour area has changed, it does not propose the old electrode but a new one to the current revision. So nobody erodes an old contour into a changed mould.
Does this also help tidy up the electrode store?
Yes. The agent lists electrodes whose tools were scrapped or returned to the customer, and those worn so far that they will not be used again. The shop manager decides what is scrapped, and the racks have room again for the electrodes that are needed.
