Permits for hazardous work

demi prepares permits for hot work, confined space entry and hazardous areas, checks inductions and tracks open permits.

Today

Welding in a hazardous area, entering a vessel, opening a line that carried a hazardous substance: each needs a permit. Today that is often a paper form, filled in under time pressure at the gate or in the control room. Whether the contractor has been inducted, whether a second job is running at the same spot and which permits are still open at shift end, nobody sees at a glance. Gaps like these are among the known causes of serious accidents.

An example

At Orvelon, a contractor is to weld a nozzle onto agitated vessel R-204. From the maintenance work order the agent drafts a permit for hot work and vessel entry: the vessel stands in a zone 1 area and last held isopropanol, so drain, flush, fit blinds on all inlets, isolate and lock out the agitator, gas test, and post a fire watch and a standby person. It finds that the safety induction of one of the two welders expired a week ago and that line cleaning is planned in the same area on Thursday morning. The plant manager moves the cleaning, the welder is inducted at 7 am, and after the gas test the plant manager signs the permit. At 5:40 pm the agent reminds the control room that the permit is still open and the fire watch runs until 7 pm.
Fictional company, typical workflow.

Your data, wherever it lives

Your permits are written today on paper forms in the control room, work orders live in the maintenance software, risk assessments and the explosion protection document in the DMS or as PDFs, inductions in the HR system and in contractor spreadsheets, planned work in calendars. demi reads, understands and links them per work order and plant, with your rights. A complete draft is ready in minutes instead of after a long search, and the person responsible for the plant decides and signs.

Where the data lives today

  • Tickets
  • DMS & archive
  • PDFs
  • HR system
  • Office files
  • Calendars
  • Scans & paper
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    Data sources in this case: work orders from the maintenance software, equipment and hazardous zones from the explosion protection document, risk assessments and operating instructions from the DMS, safety data sheets of the substances in the vessel, inductions and qualifications from the HR system and contractor lists, plus the calendar of all work on site. demi replaces nothing and links, per work order, equipment, substance, zone, hazard and the people who will work there.

  2. 2 · PermitPermission Layer

    Only the named persons responsible for the plant may issue and sign permits; demi only prepares. From the HR system the agent sees only whether induction and qualification are valid, no other personal data. Every signature, every gas test and every hand-back is recorded.

  3. 3 · ActIntelligence Layer

    From work order, equipment and risk assessment, the agent compiles the measures the permit needs: draining, flushing, fitting blinds, isolating, gas testing, fire watch, standby person and rescue plan. It checks whether every listed person has a valid induction and qualification and flags jobs that endanger each other at the same place and time. It follows open permits and running fire watches until hand-back; the rules come from your specifications, and the language model only writes them up.

How it runs

  1. 1

    Maintenance creates a work order, and demi recognises equipment, location and type of work.

  2. 2

    The agent draws on hazardous zone, substances, risk assessment and operating instruction and drafts the permit with all measures.

  3. 3

    It checks the induction and qualification of every listed person, contractors included.

  4. 4

    It flags jobs that overlap in time at the same location.

  5. 5

    The person responsible checks on site and signs after the gas test, and demi follows the permit until hand-back.

What changes

  • Every permit with the measures equipment and substance require

  • Permits issued only with a valid induction

  • Open permits and fire watches in view at shift end

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+225 hfreed per year

Assumptions and calculation

demi drafts the permit with all measures and checks inductions; you sign.

30 min → 22.5 min per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

150 permits × 30 min × 25% × 1.0 (manual) × 12 months = 13,500 min = 225 h

Value per year, before demi costs

Freed per year+225 h

Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.

= Value per year, before demi costs

+€14,625

gained per year

225 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Does demi issue permits itself?

No. demi drafts the permit with all measures and their sources. Issuing, checking on site and signing are done by the named persons responsible for the plant, as your procedures set out.

How does the agent know which measures a job needs?

From your own specifications: the plant's risk assessment, the explosion protection document, safety data sheets, operating instructions and your rules for hot work and vessel entry. It shows the source of every measure. If a rule is missing, it says so instead of inventing one.

How does demi check contractor inductions?

Through the list of inductions and qualifications your site keeps anyway, whether in the HR system, the contractor portal or a spreadsheet. If an induction has expired or a certificate is missing, for welding or vessel entry for example, it is flagged next to the name on the permit.

What happens to open permits at shift end?

The agent shows the control room every permit not yet handed back and every running fire watch with its end time. If a permit is not handed back in time, it reminds the person responsible. Only an authorised person can close the permit.

See this case with your data

In the demo we show you the workflow on your own systems.