Today
At grid operators, water utilities and plants with their own utility networks, a large part of the network exists only on paper: as-built plans, survey sketches and cable joint sketches from five decades, with handwritten notes, in old coordinate systems or with no coordinates at all. The GIS knows the line but not its material and year, or does not know it at all. Before every construction job someone gathers plans, and the excavator still digs with uncertainty.
An example
Wattaris wants to build a charging park for its own electric trucks at gate 2 of its plant in Senftenberg. The agent reads 64 scanned site plans from 1971 to 2008 with handwritten notes, georeferences them via hall corners, roads and manholes and proposes 9.8 km of line sections with medium, material, cross-section and year for the GIS. At the access road it shows a 20 kV cable missing from the GIS and a grey cast iron water main that, according to the asset database, was replaced with PE in 1994, but according to a handwritten note only up to manhole 7. Maintenance has both spots located before the excavator arrives.
Your data, wherever it lives
The position, material and year of old lines sit today on paper plans in the plan cabinet, in survey and joint sketches, in PDF and CAD files on network drives and in an asset database that does not match the GIS. demi reads, understands and links them section by section with the GIS, with your rights. The AI georeferences plans and proposes lines with attributes in hours instead of weeks, and your GIS specialist decides what is adopted.
Where the data lives today
- Scans & paper
- CAD & drawings
- PDFs
- Folders & drives
- DMS & archive
- Databases
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: scanned as-built plans, survey and joint sketches from plan cabinets and the DMS, PDF and CAD files, the asset database and the GIS. demi replaces nothing and georeferences every plan using building corners, roads, manholes and chains of dimensions. Every line section gets its medium, material, nominal size or cable type, year laid and the plan it comes from.
- 2 · PermitPermission Layer
Network data is critical infrastructure and visible only to network operations, maintenance and the GIS team. A construction firm gets read-only access to the plan section of its site, for the duration of the job, and every access is logged. Only what the GIS specialist approves goes into the GIS.
- 3 · ActIntelligence Layer
The agent reads legend, labels and handwritten notes, converts chains of dimensions into coordinates and proposes line sections with attributes for the GIS, each with source and positional accuracy. If plan, asset database and GIS contradict each other, it shows all three versions. If a route on the plan is ambiguous, it marks it as uncertain instead of drawing it.
How it runs
- 1
Plan cabinets are scanned; the DMS, drives with PDF and CAD plans, the asset database and the GIS are connected.
- 2
demi georeferences every plan in today's coordinate system using building corners, roads, manholes and chains of dimensions.
- 3
The agent reads lines with medium, material, nominal size and year and proposes them as sections for the GIS.
- 4
It compares every section with the asset database and the GIS and flags missing lines and contradictions.
- 5
The GIS specialist reviews the proposals and adopts them; uncertain sections go out for location on site.
What changes
Material, position and year of old lines in the GIS instead of the plan cabinet
Contradictions surface at the desk, not at the excavator
Renewal and network planning with data whose source you know
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+216 hfreed per year
Assumptions and calculation
demi places the plan and proposes lines with attributes for the GIS; you check and adopt them.
90 min → 63 min per case
How we calculate
40 plan sheets × 90 min × 30% × 1.0 (manual) × 12 months = 12,960 min = 216 h
Value per year, before demi costs
Freed per year+216 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€14,040
gained per year
216 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
How does demi place plans that have no coordinates?
Via control points that appear both on the plan and in your GIS or the official cadastral map: building corners, kerbs, manholes, hydrants. The agent converts chains of dimensions such as “3.20 m from building corner” into coordinates, and old national grid coordinates into today's ETRS89. Every position carries an accuracy note.
Does demi write directly into the GIS?
Only after approval. The agent delivers proposals with geometry, attributes and source; the GIS specialist checks, edits and adopts them, in your GIS and your data model.
What happens when plan and asset database disagree?
The agent shows both versions side by side, with source and date, such as grey cast iron according to a 1978 plan and PE according to a 1994 renewal. Your network operations decide which applies; unclear spots go as a task for location or a trial hole.
Does this replace the utility inquiry before digging?
No. demi makes the data more complete and faster to reach, but before every construction job the utility inquiry and on-site location apply according to your rules. Uncertain positions are marked as such in the GIS.