Today
Customers ask for pumps, valves and compressors for hydrogen, and the quote hinges on a question hardly anyone in the company can answer with confidence. High-strength steels, springs and bolts can embrittle in hydrogen, standard elastomers let it through or crack on rapid decompression, and an over-hard weld becomes a risk. These parts hide in bills of materials with hundreds of lines, and the test data is scattered across lab reports, standards and supplier declarations.
An example
An electrolyser maker asks Hartwig & Brunn Pumpenwerk for 12 KP DN 100 centrifugal pumps for the lye circuit and 40 DN 100 PN 16 butterfly valves for the hydrogen line. The agent checks both BOMs, 214 lines in total: casings and impellers in 1.4408 are non-critical. It marks the valve shafts in 1.4057 and the property class 10.9 bolts as “replace”, because both can embrittle in hydrogen, and proposes shafts in 1.4429 and A4-70 bolts from the parts master. For the NBR O-rings there is no in-house permeation test, so: “check”. The head of engineering approves a lab test for the modified valve, and sales replies to the customer with the material list and a date.
Your data, wherever it lives
Whether a product can handle hydrogen is written down nowhere in one place today: BOMs and drawings in the PLM, materials and suppliers in the ERP, lab reports in the lab database, standards, data sheets and supplier declarations as PDFs in the DMS and in mailboxes. demi reads, understands and links them per BOM line, with your rights. The AI checks a BOM with hundreds of lines in minutes instead of days, and your engineering team decides what gets replaced and what gets tested.
Where the data lives today
- PLM
- ERP
- PDFs
- DMS & archive
- Databases
- E-mails
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: bills of materials and drawings in the PLM, materials and suppliers in the ERP, lab reports and test values in the lab database, standards, material data sheets, welding procedure specifications and supplier declarations as PDFs. demi replaces nothing and links every BOM line with its material, strength, hardness, welding procedure and seal material, and with all the test data that exists for it. For each line you see what is known about its behavior in hydrogen and where that knowledge comes from.
- 2 · PermitPermission Layer
Bills of materials and drawings are visible to engineering, lab reports to materials engineering, supplier declarations to purchasing; sales sees only the released result per product. Whether a product counts as fit for hydrogen is decided by the responsible person in engineering or materials engineering, and every release is recorded.
- 3 · ActIntelligence Layer
The agent works through the BOM line by line and checks material, property class, hardness and seal material by fixed rules against standards, material data and your own test results on embrittlement, permeation and decompression. Each line gets the status “non-critical”, “check” or “replace”, with its source and, where possible, a replacement from your parts master. Limits and comparisons are computed from the data; the language model only explains the reasoning.
How it runs
- 1
The inquiry states medium, pressure, temperature and hydrogen content.
- 2
The agent opens BOM and drawings and lists every wetted and load-bearing line with material, strength and hardness.
- 3
It checks each line against standards, material data and your lab results on embrittlement, permeation and decompression.
- 4
Each line gets the status “non-critical”, “check” or “replace”, with its source and, where needed, a replacement from your parts master.
- 5
Engineering reviews the list, decides on replacements and tests and releases the reply to the customer.
What changes
Fast, evidence-based answers to every hydrogen inquiry
Critical materials show up before the order, not in operation
Lab know-how usable for every product
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+115 hfreed per year
Assumptions and calculation
demi checks every BOM line against hydrogen test data; you decide on replacement and testing.
4 h → 2.8 h per case
How we calculate
8 BOM checks × 4 h × 30% × 1.0 (manual) × 12 months = 115 h
Value per year, before demi costs
Freed per year+115 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$7,475
gained per year
115 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
What data does the hydrogen assessment rest on?
On standards and recognized material rules for hydrogen, on material data sheets and your suppliers' declarations, and above all on your own test results, from your own lab or from institutes you commission, such as tensile tests in hydrogen or permeation measurements on seals. Every assessment names its source. Where only a general rule applies, it says so.
Does demi also check welds and heat treatment?
Yes. The agent reads welding procedure, filler metal, heat treatment and hardness test from the welding procedure specification, inspection certificate and test report and compares the hardness with the limits for hydrogen. If a hardness value is missing, it marks the weld as “check” instead of releasing it.
Does demi also assess blends of natural gas and hydrogen?
Yes. Hydrogen content, pressure and temperature come from the inquiry, and the rules differ accordingly. A valve that is non-critical at a low blend can be marked “replace” for pure hydrogen at high pressure.
Does the check replace a lab test?
No. demi shows which lines are non-critical on the evidence and where a test is needed. Whether a component test is run and whether the product counts as fit for hydrogen is decided by your engineering or materials engineering team.
