Skip to content
Service & spare partsWater & EnvironmentMachinery & Plant EngineeringConveying & IntralogisticsMining & Raw Materials+3

Make paper wiring diagrams searchable

demi reads scanned wiring diagrams and finds every device, terminal and cross-reference in seconds, also on a phone at the machine.

Today

In many control cabinets the wiring diagram sits on paper in the door, yellowed and marked up by hand; the archive holds binders with diagrams for hundreds of installations, often only as scans without text. During a breakdown at night the electrician hunts for a contactor or a terminal across 400 pages and follows cross-references from sheet to sheet. Whether the diagram still matches the installation only shows when someone measures.

An example

At 2:40 am a service technician from Conveyra Fördertechnik is at a steel stockholder's site, in front of a BK 10 t bridge crane with an 18 m span built in 1998: the hoist no longer lifts. On his phone he asks where the upper hoist limit switch is wired. In the scanned 68-sheet diagram the agent finds limit switch -S21 on sheet 37, its contact on terminal X2:14 and the cross-reference to contactor -K12 on sheet 41, column 6. It also shows a handwritten change from 2009 that moved the wire to X2:16. That is where the technician finds the loose wire twenty minutes later.
Fictional company, typical workflow.

Your data, wherever it lives

Wiring diagrams sit on paper in the cabinet door today, in binders in the archive, as scans and PDFs on the drive or in the DMS, and only for newer installations as a project in the electrical CAD. demi reads, understands and links them with installation and serial number, with your rights. The AI finds every device, terminal and cross-reference in seconds, and the electrician decides at the installation what to measure and replace.

Where the data lives today

  • Scans & paper
  • PDFs
  • Folders & drives
  • DMS & archive
  • CAD & drawings
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    Data sources in this case: scanned diagrams and PDFs from folders and the DMS, newer projects from the electrical CAD and the installed base from maintenance. demi replaces nothing and reads every sheet: device tags, terminals, wire numbers, cross-references with sheet and column, contact images and the title block with drawing number and revision. Each diagram is linked to its installation and serial number; handwritten changes are marked as such.

  2. 2 · PermitPermission Layer

    Technicians see the diagrams of the installations they look after, service partners only the installation of their job and only for its duration. Customer-owned diagrams stay with that customer's team. Whether a diagram counts as outdated or a change is adopted is decided by electrical design, and that is logged.

  3. 3 · ActIntelligence Layer

    The agent finds every occurrence of a tag, follows cross-references and contact images across all sheets and shows the cut-out from the scan. It answers questions such as “Which fuse feeds the hoist?” with sheet and column. It reproduces what the diagram says; if a spot is illegible or a handwritten correction contradicts the print, it says so instead of guessing.

How it runs

  1. 1

    Scans and PDFs of the diagrams are connected; diagrams that exist only on paper in the cabinet are scanned once.

  2. 2

    demi reads every sheet, recognizes tags, terminals and cross-references and attaches the diagram to installation and serial number.

  3. 3

    During a breakdown the electrician searches for -K12 or X1:23 on the phone or asks in plain words.

  4. 4

    The agent shows every occurrence with sheet and column, follows the cross-references and displays the cut-out from the scan.

  5. 5

    If the diagram does not match the installation, the electrician reports it in one sentence and electrical design updates the documentation.

What changes

  • Faults narrowed down faster, even at night and without a diagram expert

  • Every diagram attached to the right installation and serial number

  • Handwritten changes become visible and get carried over

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+90 hfreed per year

Assumptions and calculation

demi finds devices, terminals and cross-references in the diagram; you look for the fault at the machine.

30 min → 21 min per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

50 wiring diagram searches × 30 min × 30% × 1.0 (manual) × 12 months = 5,400 min = 90 h

Value per year, before demi costs

Freed per year+90 h

Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.

= Value per year, before demi costs

+$5,850

gained per year

90 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Can demi read yellowed or hand-corrected diagrams?

Yes, from a scan with enough resolution, about 300 dpi. demi recognizes printed tags, terminals and cross-references even on yellowed paper, and the agent marks handwritten corrections as such. If a spot is illegible, it says so and shows you the cut-out.

Which designations does demi recognize in a wiring diagram?

Device tags to IEC 81346 with plant, location and device, older diagrams to DIN 40719, terminal strips and terminals, wire numbers, cross-references with sheet and column, contact images under contactors and relays and the title block with drawing number and revision.

Do technicians need a separate app for this?

No. The technician searches in the browser on a phone or tablet or asks in the chat. Tapping a cross-reference jumps to the right sheet, and you can zoom into the cut-out from the scan.

Does a hit in demi replace measuring at the installation?

No. demi shows what the diagram says, including handwritten corrections and the revision. Before any work the five safety rules apply, and the electrician measures. If the diagram does not match the installation, the electrician reports it and the deviation goes to electrical design as a task.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases