Today
Sewage sludge leaves the plant in tonnes, but it is balanced and reported in dry matter. Weighbridge tickets come from the scale or the haulier, dry solids from the lab, recipients and prices from the ERP, and only at year end does someone add it all up in one big spreadsheet. If loads are missing or lab values do not fit, the balance is off, and planning for phosphorus recovery rests on shaky numbers.
An example
Aldevo Wassertechnik runs a wastewater treatment plant for 80,000 population equivalents on behalf of a municipal wastewater association. For the annual balance the agent links 412 weighbridge tickets with the dry solids from 52 lab reports and arrives at 1,986 t of dry matter, 64 t less than calculated from digestion. It explains the gap: eleven loads from June exist only as a photo in a haulier's e-mail, and two lab values from March were assigned twice. Phosphorus averages 31 g/kg dry matter, so under German rules the plant must recover phosphorus from 2032; the agent hands quantities, contents and disposal routes to the planning. The plant manager checks the balance and releases the report.
Your data, wherever it lives
Your sewage sludge data is scattered today: weighbridge tickets in the scale's database and as scans or e-mail attachments from the haulier, dry solids and pollutant values in the lab's PDF reports, recipients and invoices in the ERP, the balance in spreadsheets. demi reads, understands and links them per load and batch, with your rights. AI keeps the balance running, explains every gap and pre-fills the annual report; what goes to the authority is released by your plant management.
Where the data lives today
- Databases
- Office files
- PDFs
- ERP
- E-mails
- Scans & paper
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from the weighbridge, the lab, the ERP, spreadsheets and the authority's reporting portal. demi replaces nothing and links per load the weighbridge ticket, delivery note, dry solids, phosphorus and pollutant values and the recipient with its disposal route. The quantities from digestion and dewatering come in too, so produced and removed dry matter stand side by side.
- 2 · PermitPermission Layer
Plant management and the lab see quantities and lab values; prices and contracts with hauliers and recipients only plant management and finance. The annual report and the records go to the authority only after plant management releases them, and the release is logged.
- 3 · ActIntelligence Layer
The agent computes each load's dry matter exactly from weight and dry solids, matches the total against the quantity produced and explains every gap with its documents, such as missing tickets or lab values assigned twice. It checks lab values against the limits of the ordinance and the acceptance terms of each recipient and shows from when the phosphorus recovery obligation applies. The numbers come from the data; the language model only explains.
How it runs
- 1
Weighbridge tickets and delivery notes come in from the scale, from the haulier by e-mail or as scans.
- 2
demi assigns each load to its batch, the matching lab value and the recipient and computes the dry matter.
- 3
The agent matches removed against produced dry matter and explains every gap with documents.
- 4
It checks limits and acceptance terms and pre-fills records and the annual report, phosphorus contents included.
- 5
Plant management checks the balance and releases the records and the report.
What changes
A mass balance that is right all year, not only in January
Every tonne backed by ticket, lab value and recipient
Solid figures for planning phosphorus recovery
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+56 hfreed per year
Assumptions and calculation
demi links weight, dry solids and lab values per load and keeps the balance; you release the report.
20 min → 12 min per case
How we calculate
35 sludge loads × 20 min × 40% × 1.0 (manual) × 12 months = 3,360 min = 56 h
Value per year, before demi costs
Freed per year+56 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$3,640
gained per year
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
How does demi know the dry matter of each load?
From the weight on the weighbridge ticket and the dry solids of the batch in the lab report or your own measurement. Each load shows which lab value from which day was used. If there is no matching value, the agent flags the load instead of assuming an average.
Does demi also prepare phosphorus recovery?
Yes. The agent tracks phosphorus contents per batch and year and shows whether the plant is above the threshold of the sewage sludge ordinance and from when the obligation applies. It compiles quantities, contents, disposal routes and costs as a basis for a tender or a partnership. Which route the plant takes is decided by plant management with the association.
Does demi send the annual report to the authority itself?
No. The agent pre-fills the report and the records from the linked data, every figure with its documents. It is sent only after plant management releases it, and release and dispatch are logged.
Does this help disposal firms and incineration plants too?
Yes. Anyone who takes in sewage sludge from many plants keeps the same balance from the other side: quantities received per producer, dry solids, pollutant values and the ash stored for phosphorus recovery. demi links weighbridge tickets, analyses and contracts per producer in the same way.