Today
Every day assembly is missing something: a connector, a populated circuit board, a housing on its way back from coating. So every morning someone walks the hall with the shortage list and phones purchasing, goods receipt, quality and the warehouse to find out where each part is. By the time it is clear, workstations have been replanned, half-built units are pushed aside and delivery dates wobble.
An example
At Wallner+Hardt Sensortechnik, 38 assembly orders for pressure sensors and encoders are due on Tuesday. At 5:30 the agent reports 31 complete and seven waiting for parts. The M12 connectors for 1,200 pressure sensors have been in goods receipt since Friday but are not yet posted; the circuit boards for the encoders are in incoming inspection, and the supplier has moved the stainless-steel housing for two IO-Link variants to Thursday by e-mail. Warehouse, quality and purchasing have their lists at 6:00, and assembly management brings three complete orders forward.
Your data, wherever it lives
The trail of a missing part is scattered today: reservations, purchase orders and stock in the ERP, assembly orders in the MES, storage locations in warehouse management, inspection lots with quality, new dates in supplier e-mails, follow-ups in chat and the shortage list in a spreadsheet. demi reads, understands and links it per assembly order, with your rights. By six o'clock it is clear what is missing, where it is and who is getting it, and assembly management decides how the day runs.
Where the data lives today
- ERP
- MES
- Databases
- Office files
- E-mails
- Chats
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: the ERP, MES, warehouse management, spreadsheets, e-mail and chat. demi replaces nothing and links, for each assembly order, the BOM, reservations, stock, open purchase orders, shipping notices, goods receipts, inspection lots, blocked stock and production orders for in-house parts. So for every missing part it is clear where it is right now.
- 2 · PermitPermission Layer
Assembly management sees all orders and missing parts; purchasing, quality and the warehouse each see their own cases. Prices and supplier terms stay with purchasing. Queries to suppliers go out only after purchasing releases them, the warehouse posts bookings as before, and every status change is logged.
- 3 · ActIntelligence Layer
Every morning the agent checks all assembly orders of the coming days against stock and reservations and traces each missing part through the documents: ordered, confirmed, delivered, posted, inspected, blocked or in in-house production. It reads new dates from supplier e-mails, gives every missing part an owner and shows which orders are complete. Quantities and dates come from the documents, not from estimates.
How it runs
- 1
At 5:30 demi reads all assembly orders for the next five days with their BOMs, reservations and stock.
- 2
For each missing part the agent finds where it is: with the supplier, in goods receipt, in inspection, in blocked stock, in in-house production or at another storage location.
- 3
New dates and shipping notices from supplier e-mails flow in, each with its source.
- 4
Everyone gets their list: purchasing the supplier cases, quality the open inspection lots, the warehouse the deliveries not yet posted.
- 5
Assembly management sees which orders are complete and sets the sequence for the day.
What changes
A shortage list every morning with location and owner for each part
Assembly starts only orders it can finish
No more phoning around to find a part
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+135 hfreed per year
Assumptions and calculation
demi finds the location and owner of every missing part; assembly management decides the sequence.
15 min → 10.5 min per case
How we calculate
150 missing parts × 15 min × 30% × 1.0 (manual) × 12 months = 8,100 min = 135 h
Value per year, before demi costs
Freed per year+135 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$8,775
gained per year
135 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
How does demi know where a missing part is?
From the documents that already exist: purchase orders and order confirmations in the ERP, goods receipt postings, quality's inspection lots, blocked stock, storage locations and production orders for in-house parts. Shipping notices and new dates from supplier e-mails are added. Every statement shows the document it comes from.
What about parts the system says are there but nobody can find?
The agent flags them as a stock discrepancy: book stock present, storage location empty or unknown. It names the part's last movement, such as a transfer or a withdrawal for another order, and passes the case to the warehouse to search. Nothing is posted without the warehouse.
Does demi chase suppliers on its own?
demi drafts the query with the purchase order, the confirmed date and the assembly order that is waiting. It goes out only when purchasing releases it, in the supplier's language if you like. The agent reads the reply and enters the new date in the list.
Does demi change the assembly sequence?
demi proposes which complete orders can be brought forward and shows what that means for delivery dates. Assembly management or production control decides. Only then does the sequence change in the MES.