Today
Many plants have run for 25 or 30 years on control programs that were never fully documented: comments are missing, the symbol table is half empty, and the wiring diagram in the cabinet carries handwritten changes that the program implements differently. Spare parts for the old controller are running out and a retrofit is due. Before anyone writes the new software, someone spends weeks working out what the old one actually does, and often only one colleague close to retirement still knows.
An example
Conveyra Fördertechnik is to retrofit a 1994 belt conveyor line with 14 conveyors at a gravel quarry with a new controller; the last spare CPU for the old S5 sits in a cabinet on site. The agent reads the program backup with 186 blocks, the half-empty symbol table and the scanned 230-sheet wiring diagram. It builds an I/O list of 412 signals, describes the start-up and stopping sequence of the belts in plain language and shows eleven outputs missing from the diagram. Comparing it with a backup from 2009, it finds a later change in which a flag bridges the belt misalignment switch of conveyor 7. The controls engineer checks this on site and puts the monitoring back into the new controller.
Your data, wherever it lives
Knowledge of old plants sits today in program backups on floppy disks, old programming devices and network drives, in printed program listings and in scanned wiring diagrams with handwritten changes. demi reads, understands and links program and diagram signal by signal, with your rights. The AI builds the I/O list and plain-text description in days instead of weeks, and your controls engineers decide what goes into the new controller.
Where the data lives today
- Machines & sensors
- Legacy systems
- Scans & paper
- Folders & drives
- PDFs
- CAD & drawings
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: program backups from the controller and from old programming devices, symbol tables and cross-reference lists, printed program listings and scanned wiring diagrams from binders, newer diagrams from the electrical CAD. demi replaces nothing and reads every block with its calls, addresses, timers, counters and comments. Every input and output is linked to its terminal, device tag, sheet and column in the wiring diagram.
- 2 · PermitPermission Layer
Programs and diagrams of a plant are visible only to the controls engineers and project managers working on it; programs of customer plants stay with that customer's team. demi only reads backups and writes nothing into a controller. Which function is carried over into the new controller is approved by controls engineering, and that is logged.
- 3 · ActIntelligence Layer
The agent follows the call structure from the organization block down to the last function block, describes every block in plain language and derives sequences, interlocks and timers, each statement with block and network. Where program and diagram disagree, it shows both places instead of preferring one. If the meaning of a signal cannot be backed up, it marks the signal as unclear instead of guessing.
How it runs
- 1
Program backups, symbol tables, old printouts and wiring diagrams are connected; if there is no current backup, your technician pulls one from the controller once.
- 2
demi reads every block and links every input and output to its terminal and device in the wiring diagram.
- 3
The agent builds the I/O list and describes blocks, sequences and interlocks in plain language.
- 4
It flags conflicts: signals without a counterpart in the diagram, bridged monitoring functions and blocks that are never called.
- 5
Your controls engineers settle the points at the plant and use the I/O list and functional description as the basis for the new controller.
What changes
I/O list and functional description in days instead of weeks
Bridged monitoring and dead program parts surface before the retrofit
Knowledge of the plant no longer depends on one person
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+144 hfreed per year
Assumptions and calculation
demi reads program and wiring diagram and writes the I/O list and plain text; you check at the plant.
40 h → 28 h per case
How we calculate
1 PLC programs × 40 h × 30% × 1.0 (manual) × 12 months = 144 h
Value per year, before demi costs
Freed per year+144 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$9,360
gained per year
144 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Which controllers and formats does demi read?
Program backups from S5 and S7, exported sources in STL, LAD or FBD, symbol tables and cross-reference lists, plus printed program listings as scans. For controllers from other makers, an export of the program as text is enough. Whatever the agent cannot read with certainty, it shows you with its location.
Does demi access the running controller?
No. demi reads backups and exports and writes nothing into a controller. Your technician pulls a current backup with the programming device, as in any maintenance job. The running plant stays untouched.
Does demi write the new PLC program?
demi prepares the retrofit: I/O list, plain text per block, sequences, interlocks, a mapping of old to new addresses and a checklist for commissioning. Your controls engineers write and test the new program. Safety functions are assessed and validated by a person, for example to EN ISO 13849.
What if comments and symbols are missing?
Then the agent derives the meaning from the wiring diagram: address, terminal, device and its label, such as “hoist upper limit switch”. Where nothing can be backed up, the signal is listed as unclear, and your technician settles it with a signal test at the plant.