Montanis Hartsteinwerke GmbH, Brand-Erbisdorf (Germany), since 1872, 600 people, 13 sites, around 6.5 million tonnes a year

Getting started with AI · Mining & Raw Materials

How a quarry operator gets started with AI

Montanis doesn’t exist. Everything else on this page will feel familiar.

demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.

What five use cases free up

+890 h per yearEstimate, not a promise≈ €57,850 per year, calculated cautiously
Drill and blast plan SP-3-26-064, plan view: 42 blastholes in three rows behind the face crest, each with its own delay from 0 to 1,025 milliseconds, initiation in the middle of the front row, throw direction out of the face into the quarry. The nearest house, with monitoring point MP 1, is 640 metres away: 2.1 millimetres per second at 18 hertz, with 5 millimetres per second allowed.7756254753251757502510020035050065080097587572557542527512550150300450600750900100092582567552537522525040055070085095010253.8 m3.2 mFACE CRESTToe · face height 14 m · holes inclined at 10°Bench 3 · East working areaGneiss · 42 blastholes · delays in msINITIATION 0 msTHROW DIRECTION≈ 640 mMP 1 · HOUSE2.1 mm/sat 18 Hz · 5 allowedN01020 m

Blast data

Blastholes
42 in 3 rows
Hole
Ø 89 mm, 15.5 m
Burden × spacing
3.2 × 3.8 m
Face height
14 m, gneiss
Charge per hole
95 kgEmulsion, 2.8 m stemming
Total
3,990 kg
Charge per delay
95 kg, 120 kg allowed42 delays, 25 ms apart, condition 4.12
Vibration MP 1, house
2.1 mm/s at 18 Hz, 5 mm/s allowedCondition 4.15
Rock broken
≈ 7,150 m³ in situ, ≈ 19,300 t0.56 kg of explosive per m³
Montanis
TitleDrill and blast plan
LocationSite 3, Bench 3 East
TimeTue 3 Nov 2026, 12:15
ApprovalHBP-3-2025
The drill and blast plan for blast SP-3-26-064 at Site 3: 42 blastholes, each with its own delay, the nearest house 640 m away. Every value leads to its source.

The problem

Tuesday, 7:05 am: the blast goes off at 12:15 pm, and the mining authority is coming on Thursday

The mining authority announces its inspection of Site 3. On Thursday at 9:00 am, its inspectors walk the quarry with the site manager. By then, the environmental officer needs the evidence for 86 conditions of the main operating plan: twelve monthly reports on dust deposition, 23 blast reports with vibration readings, the progress of restoration on the east slope.

Every piece of evidence exists. Just not in one place:

In a folderMain operating plan HBP-3-2025 with its 86 conditions, as a scan.

In mailboxesTwelve monthly reports from the monitoring lab and 23 records from the vibration monitor, as PDF attachments.

In someone’s headOnly the site manager knows how far the restoration of the east slope has come. The photos are on his phone.

The environmental officer spends two days pulling it all together. The blast still goes off at 12:15 pm, and the next report lands in the folder again.

FromMining authority, quarrying unit
ToSite management, Site 3, Montanis
SubjectInspection of Site 3 on Thursday 5 Nov, 9:00 am
Mail #6093For the inspection, please have the evidence for the conditions of the main operating plan ready, in particular:

What happens every month in the Central Saxony unit

  1. 1,500weighings someone checks by hand
  2. 30conditions with a deadline
  3. 400questions to a manual
  4. 4shutdown plans
  5. 4demand plans

Together that is 3,450 hours a year, about 2 full-time roles. On top of that, there are around 150 blasts a year in four quarries, each with its own report and readings.

What hurts there

  1. 01
    The weighbridge is the till

    13,000 loads a month in the Central Saxony unit alone, and every one needs its order, product, job site and price. Whatever doesn’t match lands on a pile, and the invoice waits.

  2. 02
    Every permit condition has its deadline

    Dust deposition, noise, vibration at every blast, groundwater, restoration. Thirteen sites, hundreds of conditions, tracked in binders and spreadsheets.

  3. 03
    The winter overhaul is built from spreadsheets

    What falls due on crushers, screens and belts in January sits in meter readings, paper reports and people’s heads. If a part with an eight-week lead time is missing, the line stands still in March.

What demi does · An example

A day at Site 3, with demi

  1. The notice

    demi reads the mining authority’s email and opens the inspection file: all 86 conditions of HBP-3-2025, each with the evidence it requires.

    Mail #6093HBP-3-2025BM-3-26-11
  2. The evidence

    Twelve monthly reports for SN 1 to SN 4, 23 blast reports with the readings from MP 1, the survey plans with the extraction boundary. Found in mailboxes and the file share.

    SN 1–4MP 1NB 2.3
  3. The gaps

    83 conditions have their evidence. Three are open, each with a name: SN 3 has no reading for August, the east slope has had no photos since June, the 2026 noise report is nowhere to be found.

    F-26-019NB 7.4

Blast SP-3-26-064

42 blastholes, 95 kg per delay. At 12:16 pm the vibration monitor at MP 1 sends its record: 2.1 mm/s at 18 Hz. demi attaches the trace to condition 4.15. After the post-blast check, the shotfirer sounds the all-clear and signs off the blast report, which demi attaches to 4.12.

Vibration trace at MP 1 during blast SP-3-26-064: particle velocity over two seconds, peak 2.1 millimetres per second at 18 hertz, well clear of the limit of 5 millimetres per second.0 s0.5 s1.0 s1.5 s2.0 sNB 4.15 · 5 mm/s05−52.1 mm/s · 18 Hzmm/s · MP 1, house 640 m away
  1. The file

    The inspection file is ready: 86 conditions, 83 with evidence, three open, each with a name and a date. The environmental officer spends an hour checking it, and the site manager approves it.

    BM-3-26-11Human approves
  2. The photos

    The site manager uploads the photos of the east slope. demi assigns them to condition 7.4 and to the working area in the survey plans.

    NB 7.4Bench 3 East
  3. The inspection

    The site manager and the environmental officer walk the quarry with the authority. Every question has its evidence, including Tuesday’s SP-3-26-064. Two items stay open, both with a date.

    MinutesSite 3

A few times a year, the mining authority announces an inspection, and each time the file takes two days of searching. Blast and monitoring reports, on the other hand, arrive week after week. Only this ongoing work is in the table below, and demi takes just under 11 minutes off each condition.

MontanisHard rock quarriesExample company

Stone from Saxony. Since 1872.

Montanis: stone and gravel from 13 sites in Saxony, for road, rail, concrete and dykes

From paving setts to crushed stone for the motorway

  1. A stonemason from a mining family opens a quarry for paving setts near Brand. With the new gold mark, the silver from the mines loses its value; the growing cities need roads.

  2. The first stone crusher. The quarry supplies crushed stone for the railway, still in the range today as railway ballast.

  3. The Treuhand privatisation agency sells the former East German state-owned enterprise, with 41 people and one quarry, to a family that quarries granite in the Bavarian Forest. The family names the business Montanis, after the Latin montanus, “of the mountain”: in the Ore Mountains, mining has been called Montanwesen for centuries. Rebuilding the East takes crushed stone for new motorways.

  4. Its own laboratory and factory production control. By 2012, three more quarries and two gravel pits have joined: the Central Saxony unit with six sites.

  5. Montanis takes over seven sites in the Ore Mountains and founds Montanis Nederland B.V. in Rotterdam: armourstone and high-grade chippings travel by block train to dyke and road builders in the Netherlands.

  6. 13 sites, all still owned by the family that bought the business in 1991, now run by its second generation. Montanis takes in uncontaminated excavated soil for backfilling and is testing its first electric dump truck.

Profile

Founded
1872 in Brand, now Brand-Erbisdorf, Saxony
People
600, 270 of them in the Central Saxony unit, in eight departments, 122 of those in extraction and processing. The unit’s departments in the org chart
Sites
13 in central Saxony and the Ore Mountains: nine hard-rock quarries (gneiss, granulite, porphyry, granite, basalt), four gravel pits worked dry and wet. The cases and figures on this page are for the Central Saxony unit: six sites around Brand-Erbisdorf
Export
Montanis Nederland B.V. in Rotterdam: armourstone and high-grade chippings by block train for dyke, port and road building in the Netherlands and Belgium
Output
Around 6.5 million tonnes a year, around 3 million of them in the Central Saxony unit, with 13,000 loads a month there in season. Winter break in January and February
Customers
Road building and civil engineering, asphalt plants, ready-mixed concrete, track construction, dyke and hydraulic engineering, landscaping, municipalities, builders’ merchants
Revenue
Around €135 million, about 12% of it from exports
Machines
In the Central Saxony unit: 6 crushing and screening plants, 3 mobile crushers, 4 drill rigs, 8 hydraulic excavators, 1 dredger, 25 wheel loaders, 12 dump trucks, 16 tipper semi-trailers, 6 legal-for-trade weighbridges
Systems
ERP with invoicing, weighbridge software, maintenance, plant control, lab, file share, mailboxes

Four product lines, around 60 products

  • ESPremium chippings and crushed sandsPremium crushed sand 0/2, premium chippings 2/5 to 16/22, for asphalt and concrete
  • BGUnbound mixturesCrushed-stone base and frost protection layers, 0/32 to 0/56
  • GSRailway ballast and armourstoneRailway ballast 31.5/63, armourstone up to 250 mm
  • SKSand and gravelConcrete sand 0/2, rounded gravel 2/8 to 16/32

The payoff

Example calculation for the Central Saxony unit: five use cases free up 890 hours a year

≈ €57,850 per yearEstimate, not a promise
StartUse caseVolume per monthShareToday per yearFreed upValue per year
1Match weighbridge tickets with documentsShipping and weighbridge. demi matches every weighing with its order, delivery note and accompanying documents; you settle the deviations.1,500 × 5 min50%1,500 h450 h€29,250
2Track every permit conditionEnvironment and permits. demi assigns each condition to its plant and owner and tracks deadlines and readings; you meet it.30 × 45 min40%270 h65 h€4,225
3Manual answers right at the machineMaintenance. demi answers from the manual of exactly this variant, with the page; you carry on at the machine.400 × 15 min40%1,200 h288 h€18,720
4Bundle maintenance into planned shutdownsMaintenance. demi collects due maintenance and inspections per machine and fits them into the shutdown; you agree the plan.4 × 4 h30%192 h35 h€2,275
5Plan spare parts for heavy machineryPurchasing. demi works out part demand from operating hours, tonnage, service history and lead times; you order.4 × 6 h30%288 h52 h€3,380
Total3,450 h890 h€57,850

Calculated for the Central Saxony unit, six of the 13 sites. Of 3,450 hours, we count 890: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.5 full-time roles. Calculated at €65 per hour: €49.50 labour cost in manufacturing according to Destatis, plus workplace, IT and overheads. A number doesn’t fit your company? You can change every one of them in the configurator.

Site Office <=> Quarry Floor

Where demi works at Montanis: eight of 14 stations

demi can work at all 14 stations. Pick a use case and see which ones it touches.

Site Office

  1. O1Sales & framework agreements 
  2. O3Permits & conditions2
  3. O4Invoicing & haulage billing 
  4. O5Customers & job sites 
  5. O7Purchasing & stores5
  6. O8Maintenance planning4 5
One record. Every fact runs both ways.

Quarry Floor

  1. S1Drilling & blasting2
  2. S2Crushing & screening plants3
  3. S4Weighbridge & loading1
  4. S5Workshop & vehicles3 4
  5. S6Monitoring points & restoration2
  • demi works here
  • Next at Montanis
  • demi can work here too
  • Line: the path of the stone, from the permit via blast SP-3-26-064 and crusher A3-BR02 to delivery note 3-26-048213

The start

How Montanis starts in the Central Saxony unit: the weighbridge first, then the permit conditions

Which systems and use cases join in the first 90 days
The first 90 daysDay 1Week 1Weeks 2 to 4Months 2 and 3
Systems
Weighbridge software, mailboxes, file shareDaily export from the six weighbridges, plus the file share, read-only
ERP with invoicingRead-only, via a small connector in their own network
Maintenance, labRead-only
Plant controlRead-only: belt scales, meters
Use cases
1 Weighbridge ticketsMatching, read-only. Part of daily work from day 30
2 Permit conditionsWith approval
3 ManualsThe fitter decides
4 ShutdownsBefore the winter overhaul
5 Spare partsWith approval
Writing back
Into invoicingAfter approval

Why the weighbridge comes first

The weighbridge accounts for a good half of the hours we count: 450 of 890 hours a year. The daily export of the six weighbridges is clean: every load already has its delivery note number, its weight and its alibi number. demi only reads and puts every deviation, with its reason, on the invoicing pile. demi writes invoices only from month 2, and only after approval. demi starts on the permit conditions as early as week 1: the main operating plan and the monitoring reports are already in the file share and the mailboxes.

What Montanis does itself

  • ITTwo days for the connections
  • Head of shipping and weighbridgeOne hour a week
  • InvoicingTwo weeks of reviewing drafts, alongside normal work

1Data

Seven systems become one record

1,247entries
1,332links
7systems

An excerpt from the Montanis record.

AConnected

  • ERP with invoicing
    Customers, job sites, framework agreements, project prices, invoices, haulage billingThe same job site under three spellings
  • Weighbridge software
    Every load at the six weighbridges in Central Saxony: vehicle, tare, gross, net, product, delivery note, alibi numberThird-party loads reach the weighbridge without an order
  • Maintenance
    Machines, meter readings, work orders, winter overhaul listsThe tonnage per crusher is kept somewhere else
  • Plant control
    Crushing and screening plants, belt scales, operating hoursDelivers numbers nobody links to wear
  • Lab
    Samples, grading curves, test reports, declarations of performance per productThe stockpile a sample came from is only in the report
  • File share
    Operating plans, official notices, blast reports, survey plans, manualsThe main operating plan sits there as a scan
  • Mailboxes
    Call-offs, monitoring reports, emails from the authority, records from the monitorsThe readings sit in PDF attachments

Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.

BHeld together

Site 3. Seven systems. Now one entry.
Site 3, gneissERP, location and cost centre
HBP-3-2025, 86 conditionsFile share, approval notice as a scan
NB 4.12: 120 kg at mostFile share, HBP-3-2025, page 41
SP-3-26-064, 42 blastholesFile share, blast report
MP 1: 2.1 mm/s at 18 HzMailboxes, record from the monitor
SN 1–4, dust depositionMailboxes, monthly reports
A3-BR02, cone crusherMaintenance, machine and meter
A3-BR02: 412,600 t since the last changePlant control, belt scale
3-26-048213, 25.24 tWeighbridge software, alibi no. 117 451
Product 3204, LE-3-0032Lab, declaration of performance
Customer #1312, B-2614ERP, framework agreement RV-26-0187
Limit value, NB 4.155 mm/sVibration at the house
Measured value, SP-3-26-0642.1 mm/sMP 1, house 640 m away

CLinked

At Site 3, SP-3-26-064 breaks around 19,300 t of gneiss, crusher A3-BR02 turns it into crushed stone, and delivery note 3-26-048213 takes 25.24 t of it to job site B-2614.

Who?

Customers, authorities, teams

  • Customer #1312Road builder, organisation with a framework agreement since 2019
  • BB-STMining authority, quarrying unit
  • OE-UGEnvironment and permits

ERP, mailboxesis supplied by, inspects, is responsible for

What kind?

Products and declarations of performance

  • Product 3204Crushed-stone base 0/32
  • LE-3-0032Declaration of performance, system 2+
  • P-3-26-0412Sample from stockpile H7, grading curve

Labis produced at Site 3

Where?

Benches and monitoring points

  • Bench 3 EastWorking area with its extraction boundary
  • MP 1House 640 m away, vibration
  • SN 1–4Dust deposition at the site boundary

File sharelies within Site 3

What’s going on?

Machines and work orders

  • A3-BR02Cone crusher, crushing line 2
  • IA-26-1187Replace mantle and concave
  • Truck 27Tipper semi-trailer, own fleet

Maintenanceworks at Site 3

Which one exactly?

Site 3

Hard-rock quarry, gneiss

  • Gneiss is blasted here, under main operating plan HBP-3-2025. The nearest house is 640 m away.

ERPlocation with a main operating plan

What applies?

Permits and contracts

  • HBP-3-2025Main operating plan, 86 conditions
  • NB 4.12120 kg per delay at most
  • RV-26-0187Framework agreement, project price B-2614

File share, ERPapplies to Site 3

What’s in writing?

Reports, delivery notes, emails

  • SP-3-26-064Blast report of 3 Nov
  • 3-26-048213Delivery note, 25.24 t
  • Mail #6093Inspection notice

File share, weighbridge, mailboxesis about Site 3

What should it be?

Limits and standards

  • NB 4.155 mm/s at most at the house
  • NB 5.3Dust deposition under TA Luft
  • TL SoB-StB 20Fines content 5% at most

File share, lablimit for Site 3

What do we make of it?

Findings

  • F-26-019SN 3 without a reading in August, collector damaged
  • F-26-022Mantle of A3-BR02 at its limit in nine weeks

demifinding on Site 3

At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Montanis, it is the site. The grid stays, the middle changes.

DWhat it can do

  • Recognise

    “Site 3”, “East quarry” and cost centre 300 are the same place.

  • Unify

    “Crushed stone 0/32”, “STS 0/32” and product 3204 become one product.

  • Trace

    Every value shows its source, exact location and version. Unclear rows are kept too.

  • Look back

    Every blast since the last inspection, with its reading at MP 1.

  • Write back

    After approval, the invoice goes into the invoicing system.

2Rights

The org chart becomes the permission system

What only invoicing sees in the ERP, only invoicing sees in demi. And a site manager sees their own site in demi, just as in the file share today.

Central Saxony unit: 270 people, eight departments

No blast goes off without a permit, so permits come first. Then the stone is blasted, crushed, tested in the lab and weighed at the weighbridge; last of all, dispatch plans the load for the job site.

Management and administration 22Management 2 · Finance and invoicing 6 · HR 4 · IT 4 · Health and safety 3 · Assistants 3
  • 1Environment, permits, surveying 8
    • Environment and permits 4
    • Surveying 3
    • Restoration 1
  • 2Extraction and processing 122
    • Site management 12
    • Drilling and blasting 18
    • Loading and haulage 52
    • Crushing and screening plants 40
  • 3Maintenance 46
    • Fitters 24
    • Electrical 12
    • Workshop and tyres 6
    • Planning 4
  • 4Quality and lab 10
    • Lab 8
    • Production control 2
  • 5Shipping, weighbridge and fleet 38
    • Weighbridges 14
    • Drivers 20
    • Fleet management 4
  • 6Sales and dispatch 16
    • Sales 7
    • Dispatch 6
    • Inside sales 3
  • ·Purchasing and stores 8
    • Purchasing 4
    • Stores 4

22 + 8 + 122 + 46 + 10 + 38 + 16 + 8 = 270 people

Who opens which room

WhoPermits & readingsBlastsMachines & maintenanceWeighings & delivery notesPrices & framework agreementsHRApproves
Environment and permitseditsreads––––Evidence for the authority
Site managementown siteown siteown siteown site––Shutdown, inspection file
Shotfirersreadsown blasts––––Blast report
Maintenance––edits–––Work order, parts demand
Weighbridge–––own weighbridgereads–Weighbridge ticket
Finance and invoicing–––readsreads–Invoice
Sales and dispatch–––readsedits–Project price
HR–––––edits–
Customer #1312 in the portal–––own loadsown–Receipt at the job site
Conditions agent, AI coworkerreadsreads––––Never
Manual agent, on someone’s behalfAs much as the person who starts it. No more.Never

Every room has keys. They come from your systems and never multiply on their own.

Only those who sell, invoice or weigh see prices and framework agreements; the customer sees only its own. A site manager sees their own site, not the other twelve.

An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.

3Intelligence

Five agents do the work, people approve

  1. Weighbridge ticket agent

    AI coworker, accountable: head of shipping and weighbridge

    TriggerEvery weighing in the daily export of the six weighbridges
    ReadsWeighbridge tickets, orders, framework agreements, project prices, accompanying documents for third-party and backfill loads
    DoesMatches every weighing with its order, delivery note and accompanying documents. Whatever doesn’t match goes on the invoicing pile, with its reason
    ApprovalInvoicing
  2. Conditions agent

    AI coworker, accountable: environment and permits

    TriggerA new blast report, a new monitoring report, a deadline in 14 days, an email from the authority
    ReadsMain operating plans, conditions, blast reports, monitoring reports, survey plans
    DoesAttaches every piece of evidence to its condition, flags deadlines and limits, builds the inspection file
    ApprovalEnvironment and permits, site management
  3. Manual agent

    Works for the person who starts it

    TriggerA fitter asks on a tablet, right at the machine
    ReadsManuals per machine and year of build, work orders, faults on this machine
    DoesAnswers from the manual of exactly this machine, with the page, and shows how the fault was fixed last time
    ApprovalThe fitter decides
  4. Shutdown agent

    AI coworker, accountable: head of maintenance

    TriggerThe weekly maintenance day, the winter overhaul in January
    ReadsMeter readings, tonnage per machine, inspections due, open work orders
    DoesBundles the maintenance and inspections due on each machine into the shutdown and builds the winter overhaul list
    ApprovalHead of maintenance, site management
  5. Spare-parts agent

    AI coworker, accountable: purchasing

    TriggerThe weekly demand plan, a wear limit coming into view
    ReadsTonnage from the belt scales, service history, lead times, stock
    DoesSees nine weeks ahead that the mantle and concave of A3-BR02 will reach their limit, with an eight-week lead time
    ApprovalPurchasing places the order

demi checks limits against the readings and takes tonnages from the legal-for-trade weighings and prices from the framework agreements.

At Montanis, calculations run on the company’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.

The roadmap

Next up: declarations of performance, the lab and dispatch

  1. Declaration of performance per product

    Around 60 products, each with its own declaration of performance. demi keeps them up to date from the production control test reports and attaches the right one to every delivery note.

    O6
  2. Lab and sampling

    Grading curve, particle shape, frost resistance: every sample goes into the record with its stockpile and product. If a grading curve deviates, the weighbridge knows before the next load.

    S3
  3. Dispatch

    Call-offs from the job sites come in by email and phone. demi matches each call-off to its framework agreement, product and vehicle; dispatch plans the loads.

    O2

Sources

Why data first, then rights, then AI

60%

Through 2026, Gartner expects organisations to abandon 60% of AI projects that lack AI-ready data.

Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)
Least privilege

Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.

OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)
70%

70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.

Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)
MontanisHard rock quarriesExample company

Montanis doesn’t exist. Your company does.

In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.

Montanis Hartsteinwerke GmbH is made up: a typical company in Mining & Raw Materials, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.