Today
Collection BOMs live in spreadsheets, with many colour and size variants. Purchasing copies them over by hand, line by line. Minimum quantities get lost along the way, and material with long lead times only shows up when production is waiting.
An example
Fibrana is planning a collection of 38 fabrics for tarpaulins and sun protection, each in 4 colourways, made from PES dtex 1100 with a PU coating, 1,600 mm wide. The agent totals the demand for yarn and coating compound per supplier and rounds it to the spinning mills' minimum quantities. It flags two colourants whose lead time misses the February production start.
Your data, wherever it lives
Collection BOMs sit today in product development's spreadsheets, with many colour and size variants, items and orders in the ERP, and suppliers' minimum quantities, terms and lead times in e-mails and PDF price lists. demi reads, understands and links them per material, colour and supplier, with your rights. Demand per supplier, with checked minimum quantities, is ready in hours instead of after days of retyping, long lead times stand out at once, and the buyer approves every order.
Where the data lives today
- Office files
- ERP
- E-mails
- PDFs
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from spreadsheets, ERP and e-mail. demi replaces nothing and links collection BOMs, colourways and sizes with articles, supplier conditions, minimum quantities and lead times; every material has one record. demi writes back only after approval.
- 2 · PermitPermission Layer
Product development sees the collection, purchasing sees the conditions. Orders go into the ERP only once the buyer has approved them, and this is recorded.
- 3 · ActIntelligence Layer
The agent explodes the BOM into material demand per colour and size by fixed rules, rounds to minimum quantities and pack sizes and groups the demand per supplier. It flags items that would miss the production start, with lead time and date.
How it runs
- 1
Product development releases the collection BOM, in the spreadsheet as it is today.
- 2
The agent matches every material to an ERP article and reports unknown ones.
- 3
It calculates demand per colour and size and rounds to minimum quantities.
- 4
It groups the demand per supplier and flags items with too long a lead time.
- 5
The buyer reviews the order proposals, and demi writes back only after approval.
What changes
Complete orders, placed faster
Minimum quantities respected
Late items visible early
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+144 hfreed per year
Assumptions and calculation
demi turns the collection into demand per supplier with checked minimum quantities; you order.
30 min → 18 min per case
How we calculate
60 styles × 30 min × 40% × 1.0 (manual) × 12 months = 8,640 min = 144 h
Value per year, before demi costs
Freed per year+144 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€9,360
gained per year
144 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Can demi handle colour and size variants?
Yes. The agent breaks every article down into its colourways and sizes and calculates material demand per variant, using the consumption and allowance from the BOM. It combines the same material from different articles into one demand.
Does it take minimum quantities and pack sizes into account?
Yes, as they are recorded in the ERP or in the supplier conditions. The agent rounds up by fixed rules and shows how much surplus that creates. If the surplus is too large, the buyer decides whether to group differently, swap a material or drop the item.
Does the agent write orders back without approval?
Only after approval. The agent creates order proposals per supplier and the buyer reviews and approves them. demi writes back only after approval. Who approved what is recorded.
Do we have to rebuild our BOM spreadsheets?
No. demi reads the spreadsheets in the form your product development uses today. The agent asks once about unclear columns or materials without an article number and remembers the answer.
