Today
Reorder points and safety stocks were set years ago and no longer match demand. The result is shortages on one side and slow-moving stock on the other. Planners have no time to review every item.
An example
At Talwerk Antriebstechnik the agent finds 310 items whose safety stock covers more than a year of demand, among them 8 × 7 × 40 parallel keys. It also finds 42 items with frequent shortages, such as 40 × 62 × 7 shaft seals. It proposes new values for both groups, each with consumption and lead time.
Your data, wherever it lives
Stock, consumption and open orders sit today in the ERP, reorder points and safety stocks as parameters set years ago in the item master, lead times and supplier reliability in planners' spreadsheets on the drive and in order confirmations by e-mail. demi reads, understands and links them per item, with your rights. The AI checks every item in minutes instead of just a sample and proposes new values with the calculation, and materials management decides what goes back into the ERP.
Where the data lives today
- ERP
- Office files
- Folders & drives
- E-mails
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from the ERP and spreadsheets. demi replaces nothing and joins stock, consumption history, open orders, replenishment lead times and supplier reliability per item. demi writes back only after approval.
- 2 · PermitPermission Layer
Buyers see the proposals for their items. The materials manager approves parameter changes, and every change is recorded.
- 3 · ActIntelligence Layer
The agent calculates demand and variation from recorded consumption with fixed formulas, compares them with the current parameters and explains every outlier. It proposes new reorder points and safety stocks with the calculation behind them.
How it runs
- 1
demi reads stock, consumption and lead times per item.
- 2
The agent calculates demand and variability with fixed formulas.
- 3
Items with too much or too little safety stock are flagged and explained.
- 4
New parameters go to materials management for approval.
- 5
demi writes back only after approval.
What changes
Fewer shortages
Less capital tied up in stock
Parameters that match demand
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+160 hfreed per year
Assumptions and calculation
demi checks each proposal against usage, orders and lead times and explains it; you order.
5 min → 3 min per case
How we calculate
400 order proposals × 5 min × 40% × 1.0 (manual) × 12 months = 9,600 min = 160 h
Value per year, before demi costs
Freed per year+160 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€10,400
gained per year
160 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Does it replace our MRP?
No. MRP keeps running in the ERP. demi checks the parameters it calculates with and proposes better values. demi writes back only after approval.
How often are parameters reviewed?
As often as you like, for example monthly or whenever demand shifts noticeably. demi keeps calculating in the background and reports items whose parameters have drifted away from actual consumption. Maintenance becomes routine instead of a yearly project.
Can it consider supplier reliability?
Yes. If a supplier often delivers later than confirmed, that spread goes into the safety stock. The proposal shows how much comes from fluctuating demand and how much from unreliable delivery.
What if the consumption data is distorted?
One-off orders, stock-take corrections or transfers can distort consumption. The agent flags such outliers and shows the postings behind them. Planners decide whether they count in the calculation.
