Today
For a large quote, someone spends a day collecting: data sheets from the PLM, certificates from the quality folder, references from old presentations, drawings from the project drive, terms from last year's template. In the end the package holds an expired certificate, a data sheet in an old revision or a reference that does not fit the customer.
An example
A regional water board tenders an ultrafiltration plant FA DN 150 for 50 m³/h with UV disinfection and a dosing station, and the tender asks for 14 documents. For Aldevo Wassertechnik the agent assembles a 46-page package: cover letter, technical description, P&ID and layout plan, membrane data sheets with 0.1 µm pore size, three reference plants of similar size at water utilities, DVGW and hygiene certificates, terms. It flags that the DVGW certificate of the UV unit expires before the bid validity period ends, and that the project folder holds revision C of a data sheet while revision D is released. The sales engineer asks quality for the renewed certificate, reviews the package and sends it the same day.
Your data, wherever it lives
Data sheets and drawings sit in the PLM today, certificates and terms as PDFs in the DMS, references and text modules in SharePoint and old presentations, customer and price in the CRM and ERP. demi reads, understands and links them, with your rights. The AI assembles the package in your design in minutes instead of a day of searching, and you release what the customer receives.
Where the data lives today
- PLM
- DMS & archive
- SharePoint
- ERP
- CRM
- PDFs
- Office files
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: the PLM, the DMS, the project file store, the ERP and the CRM. demi replaces nothing and links every product with its released data sheets, drawings and certificates and their validity, every reference plant with application, size and customer, and every costing with the quote in the ERP. So demi knows which document in which version belongs in this quote.
- 2 · PermitPermission Layer
Only released documents in a valid version go into the package; internal costings, margins and drafts stay out. A reference appears only if the reference customer has agreed to be named. The package goes out only after release by the responsible salesperson, and the version sent is stored.
- 3 · ActIntelligence Layer
The agent reads the enquiry or the bill of quantities and builds the outline of the package from it. It writes the cover letter and technical description from your released text modules and product data, picks matching references by application and size and attaches data sheets, drawings and certificates in the valid revision, all in your template. If something is missing or a certificate is about to expire, it flags it instead of glossing over it.
How it runs
- 1
The enquiry arrives with a bill of quantities, a questionnaire or a list of required documents.
- 2
The agent builds the outline of the package and assigns each item its released source.
- 3
It writes the cover letter and technical description from text modules and product data and picks matching references.
- 4
Data sheets, drawings, certificates and terms are added in their valid version; gaps and expiring certificates are flagged.
- 5
You review the finished package in your design and release it; only then does it go to the customer.
What changes
Large quotes ready in hours instead of days
Only valid certificates and current revisions reach the customer
Every package in the same design and quality
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+288 hfreed per year
Assumptions and calculation
demi assembles the package from released documents in your design; you review and release it.
4 h → 2.4 h per case
How we calculate
15 proposal packages × 4 h × 40% × 1.0 (manual) × 12 months = 288 h
Value per year, before demi costs
Freed per year+288 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€18,720
gained per year
288 h ÷ 1,760 h per role = 0.2 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
How does demi know which version of a data sheet is valid?
From the PLM or DMS, which records which revision is released. If the project folder holds an older copy, the agent takes the released version and shows you the difference. Documents without a release status are not attached; the agent asks instead.
Can demi choose references that fit the enquiry?
Yes. The agent searches reference plants by application, size, medium and region and takes only those whose operators have agreed to be named. Which references go into the package is your decision.
Does the package look like our own quotes?
Yes. demi fills your template: your letterhead, your structure, your fonts. Text modules come from your released library, and the agent marks new wording so you read it before sending.
What about the questionnaires and forms in a tender?
The agent pre-fills them from your master data, certificates and product data and marks every answer it cannot back with a source. An authorised person signs and submits.
