Skip to content
AldevoWater technologyExample company

Aldevo Wassertechnik GmbH · Arnsberg (Germany), Neheim, Sauerland, since 1961, 900 people, around 14,000 installations in the field

Getting started with AI · Water & Environment

How a water technology maker gets started with AI

Aldevo doesn’t exist. Everything else on this page will feel familiar.

demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.

What five use cases free up

+713 h per year
Estimate, not a promise≈ $46,345 per year at the main plant, calculated cautiously

Alarm · Irradiance below minimum

UV system UVQ-180 DN 200 · SN 21-0317Waterworks of customer #5038 · Line 2 · Mon Nov 23, 2026

Diagram of the UV reactor: inlet on the left, outlet on the right, four lamps in quartz sleeves, lamp 3 failed, UV sensor S1 on top of the reactor.1234UV sensor S1Inlet DN 200Outlet
Flow
186 m³/hCertified up to 250 m³/h
Irradiance
31.8 W/m²Minimum 34.0 W/m²
UV transmittance
93.1%SAC254 3.1 1/m
Lamps
3 of 4Lamp 3 failed
Operating hours
8,412 hof 12,000 h
Lamp batch
AM-2544
Sensor check
−4%on Nov 3, 2026
Overnight irradiance trend, midnight to 6 am: steady at 41.6 watts per square meter, a warning below 38.0 at 2:14 am, a drop to 31.8 at 2:31 am, below the minimum of 34.0. Line 2 is then out of service; after the restart at 4:47 am, the alarm returns at 4:52 am.Line 2 off, plant on line 1Warning threshold 38.0Minimum 34.000:0002:0004:0006:0041.631.8
  1. Warning37.6 W/m², below the warning threshold
  2. Alarm31.8 W/m², lamp 3 off. Switchover to line 1
  3. Alarm31.8 W/m² again after the restart at 04:47

PLC V4.1.3Reference dose 400 J/m² per DIN 19294-1DVGW reg. no. DW-9182ZZ0418Remote monitoring connected

The operating screen of UV system SN 21-0317, at the waterworks of customer #5038 since 2021, as the control center sees it in demi on Monday morning: values from four systems in one view. Every value leads to its source.

The problem

Monday, 5:52 am: the UV system at a waterworks is no longer disinfecting reliably

The plant manager of a waterworks in the Sauerland calls Aldevo’s 24-hour hotline. Overnight, the UV system on line 2 has twice reported “Irradiance below minimum”: 31.8 instead of at least 34.0 W/m² at 186 m³/h. The plant now supplies water through line 1 only.

At night the hotline rings through to the on-call phone, and nobody there sees the remote-monitoring alarms. Now two people are on the early shift in the Neheim control center. They need the lamp hours, the last sensor check, the lamp batch, the response time from the contract and the nearest technician with hygiene training. It all sits in four systems and a spreadsheet:

In remote monitoringReadings, alarms and lamp hours. No contract, no batch.

In the ERP and the CRMBatch AM-2544 from the 2025 stock withdrawal, the contract with a four-hour response time.

In the instal­lation records, in a spreadsheetService report, sensor check. Dispatch keeps the hygiene-training spreadsheet and doesn’t come in until 7:00 am.

38 minutes, four systems, one callback with no arrival time. Nobody sees that the same lamp batch has already failed early three times.

Customer service control centerEarly shift · Mon Nov 23, 2026

Control center log from 5:52 to 6:30 am, today without demi
Call from the waterworks, customer #5038: UV system on line 2, two alarms overnightPhone
Serial number found: SN 21-0317 from order K-21-118ERP
Lamp 3 off since 02:31, 8,412 operating hoursRemote monitoring
Last job: sleeves cleaned on Oct 14, report SB-26-0884Installation records
Maintenance contract WV-5038-02: four-hour response timeCRM
Callback: “A technician is coming today. We’ll give you the time at 7:15.”Phone

Not checked: the lamp batch, the sensor check, who has hygiene training and four matching lamps in the van.

What happens at the Neheim main plant every month

  1. 300questions about an instal­lation
  2. 250spare-part requests
  3. 300service jobs
  4. 80inspection deadlines
  5. 10tenders

Together that is 3,000 hours a year, about 1.7 full-time roles. And every year, around 150 more installations go into the field in the Neheim control center’s area.

What hurts there

  1. 01
    Only the last person on site knows the installation

    The Neheim control center alone looks after around 4,800 installations, many of them ten to 25 years old. Which lamp, which sensor, which PLC version is fitted sits in a service report or in a technician’s head.

  2. 02
    Deadlines, certificates and proof

    Lamp changes, sensor checks, annual services, DVGW certificates valid for five years: every deadline has its own system, and the proof for the customer is put together by hand.

  3. 03
    Tenders against the clock

    Consulting engineers write the bills of quantities, “or equivalent”, due in a few days. The bid office checks line item by line item whether the operating range, material and certificate fit.

What demi does · An example

After nine minutes, the waterworks knows when the technician will arrive

  1. The call

    The control center types in the customer and the line. demi has already opened a ticket for the 02:31 alarm and uses it to find installation SN 21-0317.

    SN 21-0317T-26-2318
  2. The installation

    A UVQ-180 DN 200 from order K-21-118, PLC V4.1.3. The maintenance contract says four hours: the technician has to be on site by 9:52 am.

    K-21-118WV-5038-02
  3. The night

    At 2:31 am, lamp 3 fails after 8,412 hours. The sleeves have been clean since October, and the sensor passed its check on November 3.

    SB-26-0884KS-26-0211
  4. The batch

    Batch AM-2544 has already failed early at three other customers, each time between 8,100 and 8,600 hours. Suggestion: replace all four lamps with batch AM-2638.

    F-26-077AM-2544AM-2638
  5. The technician

    Three technicians with hygiene training are within reach. The one from Neheim needs 34 minutes and has four lamps from batch AM-2638 in the van. demi drafts the job.

    E-26-3104
  6. The approval

    The control center checks the draft, approves the job and calls back: the technician will be at the waterworks at 7:10 am.

    Human approvesLog

The control center rarely searches as long as it did this Monday. More often, a waterworks only wants to know which contract applies, which batch the lamps come from or when a technician was last on site. Ten minutes per lookup is the basis of the example calculation, and only 40% of that counts.

AldevoWater technologyExample company

Engineering for safe water. Made in Neheim since 1961.

Six owners from within the company, two plants, around 14,000 installations in the field

From an island in the Ruhr to Wrocław and Dubai

  1. Two master craftsmen from Neheim’s metal and lighting works, Alfons Dellwig and Heinrich Vohwinkel, open a workshop on a small island in the Ruhr. They build chlorinators and filter vessels for the small waterworks of the Sauerland. On the rating plates they stamp a name made from their own: Alfons Dellwig and Heinrich Vohwinkel. In 1972 the two families make Aldevo the company’s name.

  2. The first UV system. In a town built on lighting, quartz glass, ballasts and lamp holders are familiar ground. The step is a short one.

  3. Ultrafiltration for drinking water from reservoirs and springs. Since 2016, every new installation has gone into the field with remote monitoring.

  4. The second plant: in Wrocław, Aldevo Polska Sp. z o.o. builds vessels and skids for Poland and Eastern Europe. In 2019 Aldevo Middle East FZE in Dubai follows, for industrial and desalination customers in the Gulf.

  5. Aldevo belongs to six of its own managers, from engineering to customer service. In 2011 they took over the company from the heirs of the two founders and kept the name. Two of the six run the business. New: activated carbon filters against PFAS, for the stricter limits of Germany’s Drinking Water Ordinance.

Profile

Founded
1961 in Neheim, where the Möhne flows into the Ruhr
People
900: 240 at the Neheim main plant, 420 at the Wrocław plant, 228 at the service bases and 12 in Dubai. The main plant’s seven departments in the org chart
Sites
Main plant in Arnsberg-Neheim with engineering, vessel fabrication and assembly. Wrocław plant (Aldevo Polska Sp. z o.o.) for vessels and skids, sales office in Dubai (Aldevo Middle East FZE). Service bases in Hannover, Leipzig and Nürnberg
Customers
Water utilities 60%, industry 30% (beverages, power plants, chemicals), swimming pools and wastewater plants 10%
Exports
38%, mainly to Poland, the Netherlands, Belgium, Austria, Switzerland and the Gulf states
Revenue
Around €170 million
In the field
Around 14,000 installations: 6,700 UV, 4,400 dosing, 2,000 filtration and 900 membrane systems. The Neheim control center looks after 4,800 of them, and this page is calculated for those
Systems
ERP, CRM, PDM and E-CAD, remote monitoring, field service planning, installation records, tendering software with GAEB, mailboxes

Four product lines

  • UVQUV disinfection systemsDN 100 to DN 300, DVGW-certified to DIN 19294-1
  • FAFiltration systemsMulti-layer filters, iron and manganese removal, activated carbon
  • DSDosing and disinfection systemsChlorine dioxide, hypochlorite, pH correction
  • MAMembrane systemsUltrafiltration and reverse osmosis

Office Floor <=> Shop Floor

Where demi works at Aldevo: eight of 14 stations

demi can work at all 14 stations. Pick a use case and see which ones it touches.

Office Floor

  1. O1Market & consulting engineers 
  2. O2Tender & bill of quantities5
  3. O3Quote & costing2 5
  4. O4Orders & maintenance contracts4
  5. O5Installation records & approvals1 5
  6. O8Finance & HR 
One record. Every fact runs both ways.

Shop Floor

  1. S1Vessel fabrication & skid assembly 
  2. S3Control center & dispatch1 3
  3. S4Spare-parts store & service vans2
  4. S5Service & maintenance3 4
  5. S6Customer installations1
  • demi works here
  • Next at Aldevo
  • demi can work here too
  • Path: the alarm from SN 21-0317, from the customer installation via the control center and the installation record to the job

The payoff

Example calculation: five use cases free up 713 hours a year

≈ $46,345 per yearEstimate, not a promise
StartUse caseVolume per monthShareToday per yearFreed upValue per year
1Find your installed base by serial numberService300 × 10 min40%600 h144 h$9,360
2Spare-part quote from a nameplate photoService250 × 20 min40%1,000 h240 h$15,600
3The right technician for every jobService300 × 10 min30%600 h108 h$7,020
4Stay on top of inspections and maintenance proofService80 × 20 min40%320 h77 h$5,005
5Match tenders to your productsSales10 × 4 h50%480 h144 h$9,360
Total3,000 h713 h$46,345

Calculated for the Neheim main plant and its control center, not for all of Aldevo. Of 3,000 hours, we count 713: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.4 full-time roles. Calculated at $65 per hour: $48.62 labor cost in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead. A number doesn’t fit your company? You can change every one of them in the configurator.

The start

How Aldevo starts: the control center first, then spare parts and service jobs

Which systems and use cases join in the first 90 days
The first 90 daysDay 1Week 1Weeks 2 to 4Months 2 and 3
Systems
ERP, remote monitoring, installation recordsRead-only, via a small connector in their own network
CRM, mailboxesMaintenance contracts and service inbox, read-only
PDM and E-CAD, tendering software with GAEBRead-only
Field service planningRead-only
Use cases
1 Installed baseWith approval. Part of the control center’s daily work by day 30
2 Spare-part quoteWith approval
3 TechniciansWith approval
4 Inspection deadlinesWith approval
5 TenderWith approval
Writing back
Into the ERP and field service planningAfter approval

Why the installed base comes first

Every other use case starts with the same question: which installation? Spare part, technician and inspection deadline all hang on the serial number. On day 1, the control center needs only the ERP, remote monitoring and installation records, read-only. The spare-parts team saves 240 hours a year with demi, more than any other team. But this use case only starts in week 2, because every quote needs the BOM revision the installation was built to, and often only the PDM has it: Rev. D for SN 21-0317, while the ERP still shows Rev. C.

What Aldevo does itself

  • Head of ITTwo days for the connections
  • Head of customer serviceOne hour a week
  • Control centerTwo weeks of reviewing drafts, alongside normal work

The roadmap

Next up: sizing, suppliers and commissioning

After the first 90 days, the dashed stations join.

  1. Sizing from the field

    Process engineering sizes new UV systems with the real transmittance values and flow rates of the remotely monitored UV systems in the field, not with figures from the specification.

    O6
  2. Batches and suppliers

    A finding like F-26-077 becomes a claim against the lamp supplier, listing every installation that holds the same batch.

    O7
  3. Test rig and commissioning

    Test reports, disinfection, PLC version and acceptance for each installation land in the record, not on the commissioning engineer’s laptop. The control center knows every installation from its first day in the field.

    S2

1Data

Eight systems become one record

1,297entries
1,459links
8systems

An excerpt from Aldevo’s record.

One year of line 2: one curve, four systems

The curve comes from remote monitoring. What explains it sits in the ERP, field service planning and installation records. In demi, both are linked to the same installation.

Irradiance of UV system SN 21-0317 from November 18, 2025 to November 23, 2026: 48.5 watts per square meter after the lamp replacement, slowly falling to 43.0, back to 45.2 after the sleeve cleaning in October, then falling faster to 41.6, and on November 23 a plunge to 31.8, below the minimum of 34.0.Warning threshold 38.0 W/m²Minimum 34.0 W/m² at 186 m³/h12345Nov 2025Mar 2026Jul 2026Nov 202648.5 after the replacement31.8
  1. 1Nov 18, 2025, lamp replacementFour new lamps, batch AM-2544. ERP, stock withdrawal for SB-25-1147
  2. 2Oct 14, 2026, sleeves cleanedThe curve jumps by 2.2 W/m². Field service planning, service report SB-26-0884
  3. 3Nov 3, 2026, sensor checkDeviation −4%, within limits. Installation records, calibration certificate KS-26-0211
  4. 4Nov 23, 2026, 02:31Lamp 3 off, 31.8 W/m². Remote monitoring; ticket T-26-2318 in demi
  5. 5Minimum 34.0 W/m²From the certificate’s operating chart. Installation records

Connected

  • ERP
    Orders, BOMs per installation, spare parts and batches, service orders, invoicesHere the installation is an order from 2021, not equipment at the waterworks
  • CRM
    Customers, contacts, consulting engineers, maintenance contractsWater association, municipal utility and operator: the same customer three times
  • PDM and E-CAD
    Models, drawings, P&IDs, circuit diagramsBOM Rev. D in the PDM, Rev. C in the ERP
  • Remote monitoring
    Flow, irradiance, lamp hours, alarmsKnows every reading, but no contract and no batch
  • Field service planning
    Technicians, routes, van stock, mobile service reportsHygiene training lives in a separate spreadsheet
  • Installation records
    Certificates, operating charts, calibration certificates, commissioning reports, PLC backupsOne folder per installation, kept up by whoever was there last
  • Tendering software with GAEB
    Bills of quantities, line items, bid pricesEvery line item is matched to a product series by hand
  • Mailboxes
    Fault reports, nameplate photos, queries from consulting engineersThe serial number is in the photo, not in the subject line

Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.

Held together

The same operating screen. Four systems. Now one entry.
SN 21-0317ERP, order K-21-118
Customer #5038, line 2CRM
Flow 186 m³/hRemote monitoring, Nov 23, 2026, 02:31
31.8 W/m²Remote monitoring, sensor 21-0317-S1
Minimum 34.0 W/m²Installation records, the certificate’s operating chart
UV transmittance 93.1%Remote monitoring, the waterworks’ own meter
8,412 hRemote monitoring, hour counter per lamp
Lamp 3 offRemote monitoring, lamp alarm of Nov 23, 2026, 02:31
Batch AM-2544ERP, stock withdrawal for SB-25-1147
Sensor check −4%Installation records, calibration certificate KS-26-0211
PLC V4.1.3Installation records, backup from job SB-26-0884
Response time 4 hCRM, maintenance contract WV-5038-02
DW-9182ZZ0418Installation records, DVGW certificate (sample)
Minimum, certificate34.0 W/m²at 186 m³/h, operating chart
Measured value, remote monitoring31.8 W/m²Nov 23, 2026, 02:31

Linked

Customer #5038 runs UV system SN 21-0317, a UVQ-180 DN 200 from order K-21-118, on line 2 of its waterworks.

Who?

Customers, contacts, teams

  • Customer #5038 Water association, organization, customer since 1994
  • K-5038-3 Plant manager, person
  • PB-0412 Consulting engineers, organization
  • OE-KD-LS Customer service control center

CRMoperated by customer #5038

What kind?

Product series and BOMs

  • UVQ-180 UV system, four lamps
  • STL-UVQ180-D As-built BOM, Rev. D
  • AM-85 Amalgam lamp, batch AM-2544
  • 21-0317-S1 UV sensor

PDM, ERPis a UVQ-180 DN 200

Where?

Waterworks and line

  • WW-5038-01 The customer’s waterworks
  • WW-5038-01-S2 Line 2, treated water

CRMon line 2 since 2021

What’s going on?

Tickets and jobs

  • T-26-2318 Alarm of Nov 23
  • E-26-3104 Job: replace four lamps
  • SB-26-0884 Sleeves cleaned

Field service planningjob on this installation

Which one exactly?

SN 21-0317

The UV system on site, in operation since 2021

  • It disinfects line 2 at the waterworks of customer #5038, with lamps from batch AM-2544. That batch already has three early failures on record.

ERPbuilt to order K-21-118

What applies?

Contracts and approvals

  • WV-5038-02 Maintenance contract, four-hour response time
  • DW-9182ZZ0418 DVGW certificate for the series (sample)
  • K-21-118 Order from 2021

CRM, installation recordscontract for this installation

What’s in writing?

Reports, certificates, programs

  • IBN-21-118 Commissioning report
  • KS-26-0211 UV sensor calibration certificate
  • SB-25-1147 Service report, lamp replacement
  • PLC V4.1.3 Program version

Installation records, mailboxesabout this installation

What should it be?

Limits and deadlines

  • 34.0 W/m² Minimum at 186 m³/h
  • 400 J/m² Reference dose per DIN 19294-1
  • 12,000 h Lamp change by the hour counter

Installation recordslimit for this installation

What do we make of it?

Findings

  • F-26-077 Batch AM-2544: three early failures at 8,100 to 8,600 h

demifinding on this installation

At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Aldevo, it is the installation on site. The grid stays, the middle changes.

What it can do

  • Recognize

    SN 21-0317, “UV line 2” in the ticket and order K-21-118 are the same installation.

  • Unify

    SAC254 in 1/m and UV transmittance in per cent become one value.

  • Trace

    Every value shows its source, exact location and version. Unclear rows are kept too.

  • Look back

    Which batch was in the installation that night, not which one is in stock today.

  • Write back

    After approval, the job goes into field service planning and the service order into the ERP.

2Rights

The org chart becomes the permission system

What only the bid office sees in the ERP, only the bid office sees in demi. And only the people the water utility clears for that job get onto the controls of a drinking-water plant.

Neheim main plant: 240 people, seven departments

Quote and sizing first, then purchasing and production, and finally service in the field: in this order, a UV system passes from one department to the next.

Management and staff functions 20Management 2 · Finance 7 · HR 4 · IT 5 · Assistants 2
  • 1Sales 26
    • Field sales 12
    • Bid office 8
    • Inside sales 4
    • Marketing 2
  • 2Projects and engineering 40
    • Process engineering 14
    • Design 12
    • E-CAD and PLC 14
  • 3Purchasing and logistics 18
    • Purchasing 7
    • Stores and shipping 11
  • 4Production 62
    • Vessel fabrication and welding 22
    • Skid assembly 26
    • Panel building 14
  • 5Customer service 56
    • Commissioning 8
    • Service technicians 30
    • Control center 6
    • Dispatch 4
    • Spare parts 8
  • ·Quality, approvals and lab 18
    • Quality management 5
    • Test rig and lab 9
    • DVGW certificates and UBA conformity 4

20 + 26 + 40 + 18 + 62 + 56 + 18 = 240 people

Who opens which room

WhoCustomer installationsRemote monitoring and PLCQuotes and pricesCosting and marginsContractsHR and trainingApproves
Control centerreadsreads––readstraining onlyJob, callback
Dispatchreads–––readstraining onlyRoute plan
Service technicianseditsper jobreads–reads–Service report, proof
Spare partsreads–edits–reads–Spare-part quote
Bid officereads–editsedits––Quote, price
Field salesown customers–own customers–own customers–Visit report
HR–––––edits–
Customer #5038 in the portalownown, read-onlyown–own–PLC access per job
Control center agent, AI coworkerreadsreads––reads–Never
Tender agent, on someone’s behalfAs much as the person who starts it. No more.Never

Every room has keys. They come from your systems and never multiply on their own.

The control center and dispatch see who has hygiene training, but no personnel file. A technician gets onto an installation’s PLC only for the job the water utility approves.

An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.

3Intelligence

Five agents do the work, people approve

  1. Control center agent

    AI coworker, accountable: head of customer service

    TriggerAn alarm from remote monitoring or a call about an installation
    ReadsInstallation record, remote monitoring, maintenance contract, service reports, batches and findings
    DoesOpens a ticket in demi for the alarm, puts installation, contract, response time, last service and batch on one page and suggests the next step
    ApprovalControl center
  2. Spare-parts agent

    Works for the person who starts it

    TriggerSomeone from the spare-parts team starts it on an email with a nameplate photo
    ReadsNameplate, as-built BOM, stock, successor parts, the customer’s terms
    DoesReads the serial number off the plate, finds the lamp, sleeve or sensor of exactly this installation and drafts the quote
    ApprovalSpare parts
  3. Dispatch agent

    AI coworker, accountable: head of dispatch

    TriggerA new job, a technician calling in sick
    ReadsTraining such as hygiene and chlorine dioxide, van stock, appointments, travel times, response times
    DoesSuggests technician and route, with the right parts in the van
    ApprovalDispatch, or the control center before 7:00 am
  4. Deadlines agent

    AI coworker, accountable: head of customer service

    TriggerEvery Monday, and 30 days before each deadline
    ReadsMaintenance contracts, lamp hours, sensor checks, service reports, certificates
    DoesLists the lamp changes, sensor checks and annual services that are due and puts together the proof for the customer
    ApprovalService technician signs the proof
  5. Tender agent

    Works for the person who starts it

    TriggerSomeone from the bid office starts it on a GAEB file from the tender platform
    ReadsBill of quantities, product series, operating charts, certificates, materials, reference installations
    DoesMatches each line item to a product series and flags where the operating range, material or certificate doesn’t fit
    ApprovalBid office decides whether to bid

Whether an installation gets enough UV dose at 186 m³/h is checked by demi against the certificate’s operating chart. For that flow, the chart sets a minimum of 34.0 W/m².

Calculations run on Aldevo’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.

Sources

Why data first, then rights, then AI

60%

Through 2026, Gartner expects organizations to abandon 60% of AI projects that lack AI-ready data.

Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)
Least privilege

Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.

OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)
70%

70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.

Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)
AldevoWater technologyExample company

Aldevo doesn’t exist. Your company does.

In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.

Aldevo Wassertechnik GmbH is made up: a typical company in Water & Environment, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases