Who?
Customers and teams
#5182API maker, site 2#4306Contract manufacturer, also an IF-250OE-KON-MMechanical designOE-SVC-ETSpare parts
ERPruns the plant
Dosmera Schüttguttechnik GmbH·, Detmold (Germany)·, since 1981·, 340 people
Getting started with AI · Bulk Solids & Powder Handling
Dosmera does not exist. Every design office knows the variant sheet next to this.
Dosmera builds isolators, discharge stations, continuous liner systems and feeders for pharma, chemicals and battery materials. Every plant is built to the customer's URS, so almost every part exists in many variants.
demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.
What five use cases free up
+1,096 h per yearEstimate, not a promiseAbout $71,240 a year, counted cautiouslyVariant sheet from PDM, 3D CAD and ERP
Docking adapter DN 250One part family, grouped by groove, seal, material and surface. As of Friday, 20.11.2026, 9:20
| Drawing | Name in the PDM | Groove · seal | Material · Ra | BC × H | State | Plants |
|---|---|---|---|---|---|---|
| ASingle groove, EPDM O-ring, 1.4404 · discharge stations up to OEB 3 · Standard Z-104471 | ||||||
| Z-100236 | Adapterring DN250 | 1 groove · EPDM | 1.4571 · 1.6 | 310 × 60 | Obsolete | 9 |
| Z-101870 | Andockflansch 250 | 1 groove · EPDM | 1.4404 · 0.8 | 310 × 62 | Released | 14 |
| Z-104471 | Andockadapter DN250 EPDM | 1 groove · EPDM | 1.4404 · 0.8 | 320 × 62 | Released | 31 |
| Z-105902 | Adapter DN 250 Sackaufgabe | 1 groove · EPDM | 1.4404 · 0.8 | 320 × 65 | Released | 6 |
| Z-107719 | AD-Flansch 250 Erdung | 1 groove · EPDM | 1.4404 · 0.8 | 320 × 62 | Released | 8 |
| Z-109034 | Dockingflansch DN250 | 1 groove · EPDM | 1.4404 · 0.8 | 325 × 65 | Released | 3 |
| Z-111588 | Andockadapter 250 kurz | 1 groove · EPDM | 1.4404 · 0.8 | 320 × 58 | Released | 2 |
| BDouble groove, FKM O-ring, 1.4404 · continuous liners OEB 3 to 4 · Standard Z-104890 | ||||||
| Z-102915 | Linerflansch DN250 2N | 2 grooves · FKM | 1.4404 · 0.8 | 320 × 68 | Obsolete | 11 |
| Z-104890 | Andockadapter DN250 Doppelnut | 2 grooves · FKM | 1.4404 · 0.8 | 320 × 70 | Released | 24 |
| Z-106233 | Endlosliner-Adapter 250 | 2 grooves · FKM | 1.4404 · 0.8 | 320 × 70 | Released | 9 |
| Z-108160 | Adapterring 250 FKM | 2 grooves · FKM | 1.4404 · 0.8 | 330 × 70 | Released | 4 |
| Z-110402 | Andockadapter DN250 2-Nut Erdung | 2 grooves · FKM | 1.4404 · 0.8 | 320 × 70 | Released | 7 |
| Z-112957 | Liner-Adapter DN 250 Batterie | 2 grooves · FKM | 1.4404 · 0.8 | 320 × 72 | Released | 3 |
| CDouble groove, inflatable seal, 1.4404 · isolators OEB 4 to 5 · Standard Z-106941 | ||||||
| Z-103377 | Andockadapter DN250 IF | 2 grooves · P-38 | 1.4404 · 0.8 | 320 × 75 | Obsolete | 12 |
| Z-106941 | Andockadapter DN250 Isolator aufbl. | 2 grooves · P-42 | 1.4404 · 0.8 | 320 × 75 | Released | 17 |
| Z-107255 | Dockingring 250 Isolator | 2 grooves · P-42 | 1.4404 · 0.8 | 320 × 75 | Released | 5 |
| Z-109588 | Andockadapter DN 250 OEB5 | 2 grooves · P-42 | 1.4435 · 0.4 | 320 × 78 | Released | 4 |
| Z-111030 | AD250 aufblasbar EP | 2 grooves · P-42 | 1.4404 · 0.4 | 320 × 75 | Released | 2 |
| Z-113376 | Andockadapter DN250 VHP | 2 grooves · P-42 | 1.4404 · 0.8 | 320 × 75 | Released | 3 |
| DDouble groove, inflatable, Hastelloy C-22 · corrosive APIs · Standard Z-105118 | ||||||
| Z-105118 | Andockadapter DN250 C22 | 2 grooves · P-42 | 2.4602 · 0.4 | 320 × 75 | Released | 3 |
| Z-108844 | Adapter DN250 HC-22 Isolator | 2 grooves · P-42 | 2.4602 · 0.4 | 320 × 75 | Released | 2 |
| Z-110917 | Dockingflansch 250 Hastelloy | 2 grooves · P-42 | 2.4602 · 0.4 | 330 × 75 | Released | 1 |
| Z-112410 | AD250 C-22 kurz | 2 grooves · P-42 | 2.4602 · 0.4 | 320 × 70 | Released | 1 |
| Z-118204 | Variant 24, since 9:20 today | Group C already has a standard: Z-106941 | In work | 0 | ||
Swipe the table sideways
Grouped by attributes, name, bill of materials and where-used. demi does not compare shapes.BC × H in mm · Ra in µm
The problem
At 8:50 the maintenance team of customer #5182, an API maker, gets in touch. Its drum discharge isolator IF-250 from 2011, plant 11-047, has stopped: the inflatable seal on the docking adapter has torn. The next campaign is due to run on Monday.
In spare parts, the ERP shows the adapter as blocked; seal profile P-38 is no longer made. The request goes to the design office. At 9:20 someone there creates a new drawing in the PDM, Z-118204: the 24th variant of the same adapter. Yet the answers are already in the house:
In the PDM23 docking adapters DN 250 under eleven names. Searching for „Andockadapter“ finds nine of them.
In the ERPQuote EA-19-0388 from 2019: the same type IF-250, another customer, a conversion kit.
In the service portalService report SB-19-0412: fitted in four hours, pressure hold test passed.
Variant 24 costs two days of design, a new part number, a turned and welded part and a test of its own. The quote goes out on day eight. The answer has been in the house since 2019.
Ticket ST-26-2648Fri 20.11.2026, 8:50 · 2 photos
| Nameplate | IF-250 · plant 11-047 · built 2011 · port DN 250 |
|---|---|
| Part | “Lower docking ring with the air seal, seal torn” |
| Photo 2 | Seal in the port, tear at the clamping edge |
| Request | Replacement by Monday morning, campaign from 14:00 |
In the ERPItem 30-4471 „Andockadapter DN250 kpl.“: blocked since 2018, no successor, no drawing linked.
Together 5,560 hours a year, about 3.2 full-time roles. Five of the 66 in the design office drew the 2011 isolators themselves.
Every plant is built to the customer's URS. Whoever draws takes the first drawing that fits, copies it and changes three dimensions. That is how every part family grows.
An isolator runs for twenty years. What was fitted back then is often discontinued, and what was offered instead is known only to the person who offered it.
Every inquiry brings a powder with bulk density, flowability, d50 and dust explosion class. Whether a similar one has already run in the test center, two process engineers know. The trial reports sit as PDFs in project folders, named after the customer.
What demi does · An example
The same Friday, once the part search and spare parts are running, from week 4.
demi reads the ticket and the nameplate: IF-250, plant 11-047, built 2011. The as-built bill of materials, rev. C, lists docking adapter Z-103377 with seal profile P-38. The customer's “lower docking ring” is this part.
In the PDM, Z-103377 is obsolete, with no successor entered. In the ERP, item 30-4471 is blocked. Why is in a supplier email from 2018: profile P-38 is no longer made, and its successor P-42 does not fit the old groove.
23 docking adapters DN 250, grouped by groove, seal, material and surface: four groups. Group C fits the IF-250. The most fitted one there is Z-106941, in 17 plants.
In April 2019, customer #4306 got the conversion kit with Z-106941 and profile P-42 for its IF-250, plant 13-021. According to the service report it was fitted in four hours and passed the pressure hold test.
Instead of drawing variant 24, the designer checks Z-106941 against the bill of materials of 11-047: same bolt circle, same port size, the height fits the floor of the isolator. He releases the conversion kit.
Spare parts checks the draft: conversion kit with Z-106941 and profile P-42, fitting with a pressure hold test by service, papers for the customer's change control, price from the 2026 price list, two adapters in stock. At 9:45 it goes to customer #5182.
Not every Friday brings a torn seal. The example calculation below stays cautious: a part search takes 30 minutes today, of which only the cautious share counts, times 0.6. That is 5.4 minutes per search, not eight days.
Containment from Lippe. Since 1981.
A process engineer from the food industry founds Dosmera in a hall on the edge of Detmold. The first customers are mills, feed and starch plants in Ostwestfalen-Lippe that want to empty sacks without dust.
Big bag and drum discharge stations follow, with screw feeders and vibratory trays of Dosmera's own design. Dosmera now builds the way from the container to the customer's mixer.
Pharma customers work with ever more potent APIs. The first continuous liner system for OEB 3 to 4 changes containers under film; the dust stays inside.
The test center opens: customers send their powder before they order a plant. Well over 1,900 trial reports have been written since.
The first sterilizable isolator for OEB 5 and the drum discharge isolator IF-250. The design office moves to 3D CAD and PDM; older drawings join as scans.
A plant of its own in Brno, Czechia: frames and welded assemblies. In 2019 a sales office follows in Charlotte, United States, for pharma and battery materials customers in North America.
340 people. The founder holds the majority and sits on the advisory board. Since 2020 two managing directors have run the company, one from pharma plant engineering, one from Dosmera's own service. Customers in 45 countries.
Office Floor <=> Shop Floor
demi can work at all 14 stations. Pick a use case and see which ones it touches.
The payoff
| Start | Use case | Volume per month | Share | Today per year | Freed up | Value per year |
|---|---|---|---|---|---|---|
| 1 | New powder: where did a similar one run?Sales, process engineering | 20 × 2 h | 30% | 480 h | 86 h | $5,590 |
| 2 | Find existing parts instead of designing newDesign | 100 × 30 min | 30% | 600 h | 108 h | $7,020 |
| 3 | Spare-part quote from a nameplate photoSpare parts | 250 × 20 min | 40% | 1,000 h | 240 h | $15,600 |
| 4 | Build quotes from similar past ordersSales and proposal engineering | 80 × 3 h | 30% | 2,880 h | 518 h | $33,670 |
| 5 | Find your installed base by serial numberService | 300 × 10 min | 40% | 600 h | 144 h | $9,360 |
| Total | 5,560 h | 1,096 h | $71,240 |
Of 5,560 hours, we count 1,096: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.6 full-time roles. Calculated at $65 per hour: $48.62 labor cost in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead. What a standard instead of variant 24 saves in production, stores and documentation is not counted here. A number doesn’t fit your company? You can change every one of them in the configurator.
The start
| The first 90 days | Day 1 | Week 1 | Weeks 2 to 4 | Months 2 and 3 |
|---|---|---|---|---|
| Systems | ||||
| Mailboxes, project folders, test center folders | Sales mailbox and trial reports, read only | |||
| PDM, ERP | Read only, through a small connector inside your own network | |||
| 3D CAD, E-CAD, service portal | Read only: attributes, drawing text, tickets | |||
| PLC archive | Read only, per plant | |||
| Use cases | ||||
| 1 Powder | With approval by process engineering | |||
| 2 Part search | The design office decides | |||
| 3 Spare parts | With approval by spare parts | |||
| 4 Quotes | Approval: sales and proposal engineering | |||
| 5 Plants in the field | With approval | |||
| Writing back | ||||
| Into PDM and ERP: successor, where-used | After approval | |||
Every order starts with a powder. The powder agent needs only read access to the sales mailbox, the project folders and the test center's trial reports, all from day 1. It frees up 86 hours a year, and every answer shows process engineering whether trials, plants and acceptance tests really line up.
They need the most: every plant with its as-built bill of materials, post-calculations, PLC versions and the service history. From week 1, demi knows every part through PDM and ERP. Part search and spare parts build on that, and they clean the data before quotes and plant records go to customers.
1Data
A slice of Dosmera's record: one part family and the plants behind it.
Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.
| Field | Content | Source |
|---|---|---|
| The part | ||
| Drawing | Z-106941, index B, released 2016 | PDM |
| Name | „Andockadapter DN250 Isolator aufbl.“, in the ERP „Adapter DN250 IF 2N P42“ | PDM, ERP |
| Attributes | Double groove, inflatable seal P-42, 1.4404 | 3D CAD, drawing text |
| Dimensions | Bolt circle 320, 8 × M12, height 75, Ra 0.8 | 3D CAD, drawing |
| Where it sits | ||
| Fitted in | 17 plants, first 2016, last 2025 | ERP, as-built bills of materials |
| Types | IF-250 9, IF-D 250 6, IF-A 250 2 | ERP |
| Stock | 2 pieces, plus 6 seals P-42 | ERP |
| Predecessor and standard | ||
| Replacesnot in the PDM | Z-103377 with profile P-38, since April 2019 | Quote EA-19-0388, service report SB-19-0412 |
| Reason | Profile P-38 no longer available since 2018, P-42 needs a different groove | Email from the seal supplier, 2018 |
| Proposal | Standard of group C, instead of six variants | demi, finding F-26-094 |
Customer #5182 runs plant 11-047, a drum discharge isolator IF-250 from 2011, with docking adapter Z-103377.
Who?
#5182API maker, site 2#4306Contract manufacturer, also an IF-250OE-KON-MMechanical designOE-SVC-ETSpare partsERPruns the plant
What kind?
IF-250Drum discharge isolator, OEB 4, port DN 250Z-103377Docking adapter, obsoleteZ-106941Docking adapter, standard CP-42inflatable sealPDMbuilt to bill of materials rev. C
Where?
W2-D14Customer #5182, site 2, room D14, cleanroom grade DFP-3Drum station 3Service portalstands at site 2
What is running?
P-11-047Project from 2011ST-26-2648Ticket, seal tornEA-26-1193Conversion kit, approvedERP, service portalproject, ticket, quote
Which one exactly?
Plant 11-047
ERP, PDMplant in the field
What applies?
SV-5182-01Service contract, response within 24 hoursEA-19-0388Conversion kit to #4306, 2019ERPservice contract
What is written down?
URS 5182/201046 pages, revision 2VB-10-112Test center trial with the API, 2010FAT-11-047Factory acceptance test 2011SB-19-0412Service report at #4306Project folders, test centerdescribes the plant
What should be?
URS 4.2Workplace concentration below 10 µg/m³, 8 hoursISO 10648-2Isolator leak tightness, class 2ATEXzone 21 insideProject foldersapplies to this plant
What do we think?
F-26-093Successor of Z-103377 only in a quoteF-26-09423 variants, four standards will dodemifinding on this plant
In the middle, every company has what it runs or delivers at the customer: the pump at the pump maker, the batch at the chemicals producer. At Dosmera it is the plant, with every part inside it.
„Andockadapter DN250 IF“ in the PDM, item 30-4471 in the ERP and “lower docking ring” in the ticket are the same part.
„Doppelnut“, „2N“ and „2-Nut“ become one attribute, „EP“ and „elektropoliert“ one surface value.
Every value shows its source and date, including the 17 plants behind Z-106941.
The bill of materials of plant 11-047 as it was built in 2011: rev. C.
After approval, “replaced by Z-106941” is in the PDM and the successor in the ERP.
2Rights
Pharma customers send URS, powder data and drawings under NDA. At Dosmera every customer project is therefore a room of its own, and whoever does not work on the project does not see it. In demi it stays exactly that way.
From left to right, the way an inquiry becomes a running plant. Underlined in rosé: areas that open whole project rooms under NDA. Sales sees only its own inquiries there, service only plant data.
22 + 32 + 18 + 16 + 66 + 22 + 118 + 16 + 30 = 340 people
| Who | Customer projects, one room each | Design | Spare parts and service | Prices and costing | Remote service | HR | Approves |
|---|---|---|---|---|---|---|---|
| Sales engineers, proposal engineering | own inquiries | reads | reads | edits | – | – | Quote |
| Project management | own projects | reads | reads | own project | – | – | Deviation from the URS |
| Process engineering and test center | assigned | reads | reads | – | – | – | Design basis, trial report |
| Mechanical design | assigned | edits | reads | – | – | – | Drawing; standards the head of design |
| PLC and HMI | assigned | E-CAD, PLC | reads | – | per job | – | PLC version |
| Qualification | assigned | reads | – | – | – | – | Qualification draft |
| Spare parts | plant data | reads | edits | spare part prices | – | – | Spare part quote |
| Commissioning and field service | plant data | reads | edits | – | per job | – | Service report |
| HR | – | – | – | – | – | edits | – |
| Customer #5182 in the portal | own plants | – | own plants | own prices | opens access | – | Order |
| Spare parts agent, AI coworker | plant data | reads | reads | spare part prices | – | – | Never |
| Part agent, on someone's behalf | As much as the person who starts it. Never more. | Never | |||||
Every room has keys. They come from your systems and never multiply on their own.
Parts belong to Dosmera; URS, powder data and customer drawings belong to the customer. When an agent finds a variant or a trial from another project, you see attributes, values and the result, but neither the URS nor the recipe nor the customer's name.
The customer opens remote access, job by job. An agent carries the keys of the person it works for, an AI coworker its own; neither of them gets that key. Every access is in the log.
3Intelligence
AI coworker, accountable: head of process engineering
Works for the person who starts it
AI coworker, accountable: head of service
Works for the person who starts it
AI coworker, accountable: head of service
Whether a variant fits a standard is decided by the design office, by attributes, dimensions and its own rules. demi does not compare 3D shapes; it reads attributes, names, drawing text, bills of materials and where-used.
No agent promises that a powder will run on a plant: that is decided by the trial in the test center or by process engineering. What goes to the customer or is changed in PDM and ERP is approved by a person.
The roadmap
The variant sheet shows, per part family, where four standards will do. demi proposes them, the head of design sets them. Purchasing and fabrication see which part numbers run out and which plants depend on them.
Every test in the FAT protocol goes back to a requirement in the URS. demi builds the test plan from the URS and the protocols of similar plants and pre-fills the template. Measuring and signing happen at the plant.
Risk assessment, ignition hazard assessment, operating manual, declaration of conformity and the input for the customer's explosion protection document: demi assembles the file from PDM, E-CAD and the protocols of similar plants and shows what is missing. The managing director signs the declaration.
Sources
Through 2026, Gartner expects organizations to abandon 60% of AI projects that lack AI-ready data.
Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.
OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.
Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.
Dosmera does not exist: a made-up example company in bulk solids and powder handling, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.