Skip to content
DosmeraBulk solids technologyExample company

Dosmera Schüttguttechnik GmbH, Detmold (Germany), since 1981, 340 people

Getting started with AI · Bulk Solids & Powder Handling

How a powder handling equipment maker gets started with AI

Dosmera does not exist. Every design office knows the variant sheet next to this.

Dosmera builds isolators, discharge stations, continuous liner systems and feeders for pharma, chemicals and battery materials. Every plant is built to the customer's URS, so almost every part exists in many variants.

demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.

What five use cases free up

+1,096 h per yearEstimate, not a promiseAbout $71,240 a year, counted cautiously

Variant sheet from PDM, 3D CAD and ERP

Docking adapter DN 250One part family, grouped by groove, seal, material and surface. As of Friday, 20.11.2026, 9:20

variants
23
in plants
181
standards will do
4
The 23 variants of the docking adapter DN 250 with drawing, name, attributes, PDM state and number of plants, in 4 groups
DrawingName in the PDMGroove · sealMaterial · RaBC × HStatePlants
ASingle groove, EPDM O-ring, 1.4404 · discharge stations up to OEB 3 · Standard Z-104471
Z-100236Adapterring DN2501 groove · EPDM1.4571 · 1.6310 × 60Obsolete9
Z-101870Andockflansch 2501 groove · EPDM1.4404 · 0.8310 × 62Released14
Z-104471Andockadapter DN250 EPDM1 groove · EPDM1.4404 · 0.8320 × 62Released31
Z-105902Adapter DN 250 Sackaufgabe1 groove · EPDM1.4404 · 0.8320 × 65Released6
Z-107719AD-Flansch 250 Erdung1 groove · EPDM1.4404 · 0.8320 × 62Released8
Z-109034Dockingflansch DN2501 groove · EPDM1.4404 · 0.8325 × 65Released3
Z-111588Andockadapter 250 kurz1 groove · EPDM1.4404 · 0.8320 × 58Released2
BDouble groove, FKM O-ring, 1.4404 · continuous liners OEB 3 to 4 · Standard Z-104890
Z-102915Linerflansch DN250 2N2 grooves · FKM1.4404 · 0.8320 × 68Obsolete11
Z-104890Andockadapter DN250 Doppelnut2 grooves · FKM1.4404 · 0.8320 × 70Released24
Z-106233Endlosliner-Adapter 2502 grooves · FKM1.4404 · 0.8320 × 70Released9
Z-108160Adapterring 250 FKM2 grooves · FKM1.4404 · 0.8330 × 70Released4
Z-110402Andockadapter DN250 2-Nut Erdung2 grooves · FKM1.4404 · 0.8320 × 70Released7
Z-112957Liner-Adapter DN 250 Batterie2 grooves · FKM1.4404 · 0.8320 × 72Released3
CDouble groove, inflatable seal, 1.4404 · isolators OEB 4 to 5 · Standard Z-106941
Z-103377Andockadapter DN250 IF2 grooves · P-381.4404 · 0.8320 × 75Obsolete12
Z-106941Andockadapter DN250 Isolator aufbl.2 grooves · P-421.4404 · 0.8320 × 75Released17
Z-107255Dockingring 250 Isolator2 grooves · P-421.4404 · 0.8320 × 75Released5
Z-109588Andockadapter DN 250 OEB52 grooves · P-421.4435 · 0.4320 × 78Released4
Z-111030AD250 aufblasbar EP2 grooves · P-421.4404 · 0.4320 × 75Released2
Z-113376Andockadapter DN250 VHP2 grooves · P-421.4404 · 0.8320 × 75Released3
DDouble groove, inflatable, Hastelloy C-22 · corrosive APIs · Standard Z-105118
Z-105118Andockadapter DN250 C222 grooves · P-422.4602 · 0.4320 × 75Released3
Z-108844Adapter DN250 HC-22 Isolator2 grooves · P-422.4602 · 0.4320 × 75Released2
Z-110917Dockingflansch 250 Hastelloy2 grooves · P-422.4602 · 0.4330 × 75Released1
Z-112410AD250 C-22 kurz2 grooves · P-422.4602 · 0.4320 × 70Released1
Z-118204Variant 24, since 9:20 todayGroup C already has a standard: Z-106941In work0

Swipe the table sideways

Grouped by attributes, name, bill of materials and where-used. demi does not compare shapes.BC × H in mm · Ra in µm

23 drawings for the same part, 4 would do. The rosé row sits in plant 11-047, the isolator that has stood still since early this morning.

The problem

Friday, 9:20: variant 24 is drawn for an isolator from 2011

At 8:50 the maintenance team of customer #5182, an API maker, gets in touch. Its drum discharge isolator IF-250 from 2011, plant 11-047, has stopped: the inflatable seal on the docking adapter has torn. The next campaign is due to run on Monday.

In spare parts, the ERP shows the adapter as blocked; seal profile P-38 is no longer made. The request goes to the design office. At 9:20 someone there creates a new drawing in the PDM, Z-118204: the 24th variant of the same adapter. Yet the answers are already in the house:

In the PDM23 docking adapters DN 250 under eleven names. Searching for „Andockadapter“ finds nine of them.

In the ERPQuote EA-19-0388 from 2019: the same type IF-250, another customer, a conversion kit.

In the service portalService report SB-19-0412: fitted in four hours, pressure hold test passed.

Variant 24 costs two days of design, a new part number, a turned and welded part and a test of its own. The quote goes out on day eight. The answer has been in the house since 2019.

From
Maintenance, customer #5182
To
Dosmera spare parts
Subject
IF-250, plant 11-047: seal torn, campaign on hold

Ticket ST-26-2648Fri 20.11.2026, 8:50 · 2 photos

What the ticket says
NameplateIF-250 · plant 11-047 · built 2011 · port DN 250
Part“Lower docking ring with the air seal, seal torn”
Photo 2Seal in the port, tear at the clamping edge
RequestReplacement by Monday morning, campaign from 14:00

In the ERPItem 30-4471 „Andockadapter DN250 kpl.“: blocked since 2018, no successor, no drawing linked.

  1. 1torn seal on plant 11-047
  2. 23variants of the docking adapter DN 250 in the PDM
  3. 11names for the same part
  4. 4standards would do
  5. 181plants with one of these adapters
  6. 2019the same question already solved once

What happens here every month

  1. 20powder inquiries
  2. 100part searches
  3. 250spare part requests
  4. 80quotes
  5. 300plant lookups

Together 5,560 hours a year, about 3.2 full-time roles. Five of the 66 in the design office drew the 2011 isolators themselves.

What hurts there

  1. 01
    Every plant is one of a kind

    Every plant is built to the customer's URS. Whoever draws takes the first drawing that fits, copies it and changes three dimensions. That is how every part family grows.

  2. 02
    Spare parts for plants from 2011

    An isolator runs for twenty years. What was fitted back then is often discontinued, and what was offered instead is known only to the person who offered it.

  3. 03
    Every powder is new

    Every inquiry brings a powder with bulk density, flowability, d50 and dust explosion class. Whether a similar one has already run in the test center, two process engineers know. The trial reports sit as PDFs in project folders, named after the customer.

What demi does · An example

The quote goes out the same morning, without variant 24

The same Friday, once the part search and spare parts are running, from week 4.

  1. The request

    demi reads the ticket and the nameplate: IF-250, plant 11-047, built 2011. The as-built bill of materials, rev. C, lists docking adapter Z-103377 with seal profile P-38. The customer's “lower docking ring” is this part.

    ST-26-264811-047
  2. The old adapter

    In the PDM, Z-103377 is obsolete, with no successor entered. In the ERP, item 30-4471 is blocked. Why is in a supplier email from 2018: profile P-38 is no longer made, and its successor P-42 does not fit the old groove.

    Z-103377Email 2018
  3. What already exists

    23 docking adapters DN 250, grouped by groove, seal, material and surface: four groups. Group C fits the IF-250. The most fitted one there is Z-106941, in 17 plants.

    Variant sheetGroup C
  4. Solved once before

    In April 2019, customer #4306 got the conversion kit with Z-106941 and profile P-42 for its IF-250, plant 13-021. According to the service report it was fitted in four hours and passed the pressure hold test.

    EA-19-0388SB-19-0412
  5. The check

    Instead of drawing variant 24, the designer checks Z-106941 against the bill of materials of 11-047: same bolt circle, same port size, the height fits the floor of the isolator. He releases the conversion kit.

    Design office releases
  6. The quote

    Spare parts checks the draft: conversion kit with Z-106941 and profile P-42, fitting with a pressure hold test by service, papers for the customer's change control, price from the 2026 price list, two adapters in stock. At 9:45 it goes to customer #5182.

    EA-26-1193A person approves

Not every Friday brings a torn seal. The example calculation below stays cautious: a part search takes 30 minutes today, of which only the cautious share counts, times 0.6. That is 5.4 minutes per search, not eight days.

DosmeraBulk solids technologyExample company

Containment from Lippe. Since 1981.

340 people in Detmold and Brno, about 4,000 plants at customers

From sack tip to isolator

  1. A process engineer from the food industry founds Dosmera in a hall on the edge of Detmold. The first customers are mills, feed and starch plants in Ostwestfalen-Lippe that want to empty sacks without dust.

  2. Big bag and drum discharge stations follow, with screw feeders and vibratory trays of Dosmera's own design. Dosmera now builds the way from the container to the customer's mixer.

  3. Pharma customers work with ever more potent APIs. The first continuous liner system for OEB 3 to 4 changes containers under film; the dust stays inside.

  4. The test center opens: customers send their powder before they order a plant. Well over 1,900 trial reports have been written since.

  5. The first sterilizable isolator for OEB 5 and the drum discharge isolator IF-250. The design office moves to 3D CAD and PDM; older drawings join as scans.

  6. A plant of its own in Brno, Czechia: frames and welded assemblies. In 2019 a sales office follows in Charlotte, United States, for pharma and battery materials customers in North America.

  7. 340 people. The founder holds the majority and sits on the advisory board. Since 2020 two managing directors have run the company, one from pharma plant engineering, one from Dosmera's own service. Customers in 45 countries.

Company profile

Founded
1981 in Detmold, Germany
People
340 in eight areas, 66 of them in design. All in the org chart
Sites
Head office Detmold: design, stainless steel fabrication with grinding and electropolishing, assembly hall with a clean zone for the factory acceptance test, test center. Plant Brno, Czechia (Dosmera CZ, s.r.o.): frames and welded assemblies. Sales office Charlotte, United States (Dosmera USA, LLC)
Customers
Pharma and APIs 44%, chemicals 22%, battery materials 20%, food and cosmetics 14%
Export
64% of revenue outside Germany
Revenue
About €68 million
In the field
About 4,000 plants in 45 countries, about 1,300 of them with Dosmera's own controls
Test center
About 140 powder trials a year: bulk density, flowability, d50, moisture, dust parameters
Systems
PDM, 3D CAD, E-CAD, ERP, PLC archive, service portal, project folders, test center folders, mailboxes

Four product lines

  • IFIsolatorsdrum discharge, dosing, filling, sterilizable, up to OEB 5
  • EBDischarge stationsbig bag, drum, sack, IBC, for ATEX zones 21 and 22
  • ELContinuous liner systemsOEB 3 to 4, container change under film
  • DOFeedersscrew and vibratory tray, gravimetric and volumetric

Office Floor <=> Shop Floor

Where demi works at Dosmera: seven of 14 stations

demi can work at all 14 stations. Pick a use case and see which ones it touches.

Office Floor

  1. O1Market & trade fairs 
  2. O2Inquiry & powder data1
  3. O3Proposal engineering & URS4
  4. O4Quote & costing3 4
  5. O5Order & project management 
  6. O6Design & bill of materials2
One record. Every fact runs both ways.

Shop Floor

  1. S3Test center & contain­ment testing1
  2. S4Stores & shipping 
  3. S5Spare parts & service3 5
  4. S6Plants at customers5
  • demi works here
  • Next at Dosmera
  • demi can work here too
  • Line: the adapter of plant 11-047 through spare parts and design into the quote

The payoff

Example calculation: five use cases free up 1,096 hours a year

About $71,240 a yearEstimate, not a promise
StartUse caseVolume per monthShareToday per yearFreed upValue per year
1New powder: where did a similar one run?Sales, process engineering20 × 2 h30%480 h86 h$5,590
2Find existing parts instead of designing newDesign100 × 30 min30%600 h108 h$7,020
3Spare-part quote from a nameplate photoSpare parts250 × 20 min40%1,000 h240 h$15,600
4Build quotes from similar past ordersSales and proposal engineering80 × 3 h30%2,880 h518 h$33,670
5Find your installed base by serial numberService300 × 10 min40%600 h144 h$9,360
Total5,560 h1,096 h$71,240

Of 5,560 hours, we count 1,096: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.6 full-time roles. Calculated at $65 per hour: $48.62 labor cost in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead. What a standard instead of variant 24 saves in production, stores and documentation is not counted here. A number doesn’t fit your company? You can change every one of them in the configurator.

The start

How Dosmera starts: the powder first, then every part and every plant

Which systems and use cases join in the first 90 days
The first 90 daysDay 1Week 1Weeks 2 to 4Months 2 and 3
Systems
Mailboxes, project folders, test center foldersSales mailbox and trial reports, read only
PDM, ERPRead only, through a small connector inside your own network
3D CAD, E-CAD, service portalRead only: attributes, drawing text, tickets
PLC archiveRead only, per plant
Use cases
1 PowderWith approval by process engineering
2 Part searchThe design office decides
3 Spare partsWith approval by spare parts
4 QuotesApproval: sales and proposal engineering
5 Plants in the fieldWith approval
Writing back
Into PDM and ERP: successor, where-usedAfter approval

Why the powder first

Every order starts with a powder. The powder agent needs only read access to the sales mailbox, the project folders and the test center's trial reports, all from day 1. It frees up 86 hours a year, and every answer shows process engineering whether trials, plants and acceptance tests really line up.

Why quotes and plants come last

They need the most: every plant with its as-built bill of materials, post-calculations, PLC versions and the service history. From week 1, demi knows every part through PDM and ERP. Part search and spare parts build on that, and they clean the data before quotes and plant records go to customers.

What Dosmera does itself

  • IT, six peopleTwo days for access to PDM and ERP
  • Head of process engineeringOne hour a week: reading powder matches
  • Spare partsFrom week 3: reading draft quotes

1Data

Nine systems become one record

1,247entries
1,366links
9systems

A slice of Dosmera's record: one part family and the plants behind it.

AConnected

  • PDM
    Drawings, parts, bills of materials, life cycle, where-used“Obsolete” does not mean “replaced” here: a successor is written down nowhere
  • 3D CAD
    3D models, attributes in the model, derived partsThe material is in the model, the surface only in the drawing text
  • E-CAD
    Schematics, devices, Ex components per projectThe plant is called =IF250+S1 here, 11-047 in the ERP
  • ERP
    Items, as-built bills of materials, spare part prices, quotes, post-calculation, stockItem 30-4471 has no link to a drawing
  • PLC archive
    Control projects per plant, across three PLC generationsWhich version runs on the plant is written only in the service report
  • Service portal
    Tickets, service reports, photos, remote maintenance logsThe plant number is in free text, sometimes 11-047, sometimes 11/47
  • Project folders
    URS, FAT and SAT protocols, DQ, IQ, OQ, CE and ATEX papersOne folder per project, signed protocols as scans
  • Test center folders
    Trial reports, measurement tables for bulk density, flowability and d50, photos of the trialsEvery report is named after the customer, not after the powder
  • Mailboxes
    Sales, spare parts and service mailboxesThis is where every Friday arrives

Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.

BHeld together

Z-106941 and everything attached to it
Part family
Docking adapter DN 250
Group
C
PDM
Released
ERP
30-6120
Record of docking adapter Z-106941 with where-used, predecessor and the source of every value
FieldContentSource
The part
DrawingZ-106941, index B, released 2016PDM
Name„Andockadapter DN250 Isolator aufbl.“, in the ERP „Adapter DN250 IF 2N P42“PDM, ERP
AttributesDouble groove, inflatable seal P-42, 1.44043D CAD, drawing text
DimensionsBolt circle 320, 8 × M12, height 75, Ra 0.83D CAD, drawing
Where it sits
Fitted in17 plants, first 2016, last 2025ERP, as-built bills of materials
TypesIF-250 9, IF-D 250 6, IF-A 250 2ERP
Stock2 pieces, plus 6 seals P-42ERP
Predecessor and standard
Replacesnot in the PDMZ-103377 with profile P-38, since April 2019Quote EA-19-0388, service report SB-19-0412
ReasonProfile P-38 no longer available since 2018, P-42 needs a different grooveEmail from the seal supplier, 2018
ProposalStandard of group C, instead of six variantsdemi, finding F-26-094
PDM, Z-103377Obsoleteno successor entered
ERP, EA-19-0388Successor Z-106941Conversion kit for an IF-250, 2019
Finding F-26-093Successor only in a quoteAfter approval, “replaced by” is in the PDM too

CLinked

Customer #5182 runs plant 11-047, a drum discharge isolator IF-250 from 2011, with docking adapter Z-103377.

Who?

Customers and teams

  • #5182API maker, site 2
  • #4306Contract manufacturer, also an IF-250
  • OE-KON-MMechanical design
  • OE-SVC-ETSpare parts

ERPruns the plant

What kind?

Type and parts

  • IF-250Drum discharge isolator, OEB 4, port DN 250
  • Z-103377Docking adapter, obsolete
  • Z-106941Docking adapter, standard C
  • P-42inflatable seal

PDMbuilt to bill of materials rev. C

Where?

Site and room

  • W2-D14Customer #5182, site 2, room D14, cleanroom grade D
  • FP-3Drum station 3

Service portalstands at site 2

What is running?

Projects, tickets, quotes

  • P-11-047Project from 2011
  • ST-26-2648Ticket, seal torn
  • EA-26-1193Conversion kit, approved

ERP, service portalproject, ticket, quote

Which one exactly?

Plant 11-047

Drum discharge isolator IF-250, built 2011

  • DN 250, 1.4404, Ra 0.8, ATEX zone 21 inside. In service at customer #5182 since 2011. Stopped since early Friday, reported at 8:50.

ERP, PDMplant in the field

What applies?

Contracts and quotes

  • SV-5182-01Service contract, response within 24 hours
  • EA-19-0388Conversion kit to #4306, 2019

ERPservice contract

What is written down?

URS, protocols, reports

  • URS 5182/201046 pages, revision 2
  • VB-10-112Test center trial with the API, 2010
  • FAT-11-047Factory acceptance test 2011
  • SB-19-0412Service report at #4306

Project folders, test centerdescribes the plant

What should be?

Requirements

  • URS 4.2Workplace concentration below 10 µg/m³, 8 hours
  • ISO 10648-2Isolator leak tightness, class 2
  • ATEXzone 21 inside

Project foldersapplies to this plant

What do we think?

Findings

  • F-26-093Successor of Z-103377 only in a quote
  • F-26-09423 variants, four standards will do

demifinding on this plant

In the middle, every company has what it runs or delivers at the customer: the pump at the pump maker, the batch at the chemicals producer. At Dosmera it is the plant, with every part inside it.

DWhat it can do

  • Recognize

    „Andockadapter DN250 IF“ in the PDM, item 30-4471 in the ERP and “lower docking ring” in the ticket are the same part.

  • Unify

    „Doppelnut“, „2N“ and „2-Nut“ become one attribute, „EP“ and „elektropoliert“ one surface value.

  • Prove

    Every value shows its source and date, including the 17 plants behind Z-106941.

  • Look back

    The bill of materials of plant 11-047 as it was built in 2011: rev. C.

  • Write back

    After approval, “replaced by Z-106941” is in the PDM and the successor in the ERP.

2Rights

Customer projects under NDA: the org chart becomes the rights system

Pharma customers send URS, powder data and drawings under NDA. At Dosmera every customer project is therefore a room of its own, and whoever does not work on the project does not see it. In demi it stays exactly that way.

340 people, eight areas

From left to right, the way an inquiry becomes a running plant. Underlined in rosé: areas that open whole project rooms under NDA. Sales sees only its own inquiries there, service only plant data.

Management and staff 22Managing directors 2 · Assistants 3 · Finance and controlling 7 · HR 4 · IT 6
  • 1Sales and proposal engineering 32
    • Sales engineers, 4 in Charlotte 13
    • Proposal engineering 11
    • Inside sales 8
  • 2Project management 18
    • Project managers 14
    • Project assistants 4
  • 3Process engineering and test center 16
    • Process engineering 9
    • Test center 7
  • 4Design 66
    • Mechanical 42
    • Electrical design 11
    • PLC and HMI 13
  • 5Purchasing and logistics 22
    • Purchasing 10
    • Stores and shipping 12
  • 6Fabrication and assembly 118
    • Stainless steel and welding 34
    • Grinding and electro­polishing 12
    • Assembly 30
    • Control cabinets 10
    • Plant Brno 32
  • 7Qualification and docs 16
    • Qualification 9
    • Technical writing 7
  • 8Service 30
    • Commissioning and field service 18
    • Spare parts 8
    • Hotline and remote service 4

22 + 32 + 18 + 16 + 66 + 22 + 118 + 16 + 30 = 340 people

Who opens which room

WhoCustomer projects, one room eachDesignSpare parts and servicePrices and costingRemote serviceHRApproves
Sales engineers, proposal engineeringown inquiriesreadsreadsedits––Quote
Project managementown projectsreadsreadsown project––Deviation from the URS
Process engineering and test centerassignedreadsreads–––Design basis, trial report
Mechanical designassignededitsreads–––Drawing; standards the head of design
PLC and HMIassignedE-CAD, PLCreads–per job–PLC version
Qualificationassignedreads––––Qualification draft
Spare partsplant datareadseditsspare part prices––Spare part quote
Commissioning and field serviceplant datareadsedits–per job–Service report
HR–––––edits–
Customer #5182 in the portalown plants–own plantsown pricesopens access–Order
Spare parts agent, AI coworkerplant datareadsreadsspare part prices––Never
Part agent, on someone's behalfAs much as the person who starts it. Never more.Never

Every room has keys. They come from your systems and never multiply on their own.

Parts belong to Dosmera; URS, powder data and customer drawings belong to the customer. When an agent finds a variant or a trial from another project, you see attributes, values and the result, but neither the URS nor the recipe nor the customer's name.

The customer opens remote access, job by job. An agent carries the keys of the person it works for, an AI coworker its own; neither of them gets that key. Every access is in the log.

3Intelligence

Five agents do the work, people approve

  1. Powder agent

    AI coworker, accountable: head of process engineering

    TriggerA new inquiry in the sales mailbox with a product data sheet or questionnaire
    ReadsData sheet, the test center's trial reports, design and acceptance protocols of built plants, reports from service
    DoesPulls out bulk density, d50, flowability, moisture, minimum ignition energy and dust explosion class, marks what is missing and shows the nearest trials and plants with the deviation per value
    ApprovalProcess engineering: take over the design, adapt it or test in the test center
  2. Part agent

    Works for the person who starts it

    TriggerA designer describes what they need before creating a new drawing
    ReadsPDM, attributes and drawing text from the 3D CAD, bills of materials, stock and prices in the ERP
    DoesFinds existing parts by attributes, name, bill of materials and where-used and shows the whole family as a variant sheet, with stock and the plants each part sits in
    ApprovalThe design office decides
  3. Spare parts agent

    AI coworker, accountable: head of service

    TriggerA new email in the spare parts mailbox or a new ticket in the service portal
    ReadsNameplate photo, as-built bill of materials, earlier quotes and service reports, stock, price list
    DoesFinds the part in this plant's bill of materials, the successor and what was already offered for the same type, and drafts the quote
    ApprovalSpare parts; with a new successor, the design office first
  4. Quote agent

    Works for the person who starts it

    TriggerProposal engineering starts it with an inquiry or a URS
    ReadsURS, earlier quotes and post-calculations, bills of materials of similar plants, the powder agent's matches, as far as the person may open these project rooms
    DoesFinds the most similar plants by type, nominal size, OEB, material, ATEX zone and powder, shows plan against actual and drafts scope and costing, every line with its model
    ApprovalSales and proposal engineering, the price the head of sales
  5. Plant agent

    AI coworker, accountable: head of service

    TriggerA question about a plant number, a new delivery, a new service report
    ReadsDeliveries and as-built bills of materials in the ERP, service reports, PLC archive, E-CAD drawings, service contracts
    DoesKeeps the record per plant: what is fitted, what was replaced, which PLC version runs. Finds every plant with a given part, such as the 12 with Z-103377
    ApprovalService confirms gaps

Whether a variant fits a standard is decided by the design office, by attributes, dimensions and its own rules. demi does not compare 3D shapes; it reads attributes, names, drawing text, bills of materials and where-used.

No agent promises that a powder will run on a plant: that is decided by the trial in the test center or by process engineering. What goes to the customer or is changed in PDM and ERP is approved by a person.

The roadmap

Next: standards per part family, FAT protocols and the ATEX file

  1. From variants to standards

    The variant sheet shows, per part family, where four standards will do. demi proposes them, the head of design sets them. Purchasing and fabrication see which part numbers run out and which plants depend on them.

    O7S1
  2. FAT and SAT protocols

    Every test in the FAT protocol goes back to a requirement in the URS. demi builds the test plan from the URS and the protocols of similar plants and pre-fills the template. Measuring and signing happen at the plant.

    S2
  3. CE and ATEX file

    Risk assessment, ignition hazard assessment, operating manual, declaration of conformity and the input for the customer's explosion protection document: demi assembles the file from PDM, E-CAD and the protocols of similar plants and shows what is missing. The managing director signs the declaration.

    O8

Sources

Why data first, then rights, then AI

60%

Through 2026, Gartner expects organizations to abandon 60% of AI projects that lack AI-ready data.

Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)
Least privilege

Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.

OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)
70%

70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.

Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)
DosmeraBulk solids technologyExample company

Dosmera does not exist. Your part families do.

In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.

Dosmera does not exist: a made-up example company in bulk solids and powder handling, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases