Skip to content
ConveyraMaterials handlingExample company

Conveyra UK Limited · Birmingham, group HQ Neunkirchen (Saar), Germany, since 1952, 2,400 people, 7 sites in 7 countries

Getting started with AI · Conveying & Intralogistics

How a crane maker gets started with AI

Conveyra builds overhead cranes and electric chain hoists, plus belt and vertical conveyors for the material flow in the same hall, and leads the world market in automated coil cranes. Every crane system is engineered to a specification, inspected every year and looked after for decades. The cases and figures on this page are calculated for the Overhead Cranes business unit at the home plant in Neunkirchen: 350 of the group’s 2,400 people.

Conveyra doesn’t exist. Everything else on this page will feel familiar.

demi turns your systems into one record, carries over your rights and lets AI agents prepare the routine work. First the data, then the rights, then the AI. A person always approves.

What five use cases free up

+1,189 h per yearEstimate, not a promise≈ $77,285 per year, calculated cautiously

Crane inspection logEquipment record

Crane
Single-girder overhead crane BK 10 t
Serial no.
16-0542 built 2016
Operator
Customer #9061, Hall 2
Crane runway
KB 1, 54 m
Rated capacity
10,000 kg
Span
18.0 m lift height 7.0 m
Hoist
KZ 10 t, S/N 1611-0287
Mechanism group
FEM 2m (ISO M5)

Hoist service life used (Oct 14, 2026)62%

1234567891011122027

Next inspection 10/2027Tag on the crane, month 10 punched. The inspection service comes every year.

ConveyraManufacturer and
inspection service

Periodic inspectionPB 26-0542-10

Date
InspectorInspector no. 07
BasisDGUV V 52 § 26
  1. Structure and weldsOK
  2. Wheels and buffersOK
  3. Load chain: wear close to the discard limitDefect 1
  4. Load hook: safety latch bentDefect 2
  5. Hoist brake, adjustedOK
  6. Overload cut-off with test loadOK
  7. Operating and emergency hoist limit switchesOK
  8. Emergency stop on radio and pendant controlOK
  9. Conductor rail current collectorOK

ResultFit for continued use. Correct defects 1 and 2 by .

Note to the operator: Crane runway, rail fixing loose at column 7.

Competent person, Conveyra customer service

Defects corrected, confirmed by the operator:

The tenth periodic inspection in the log of crane 16-0542, in service in Hall 2 at customer #9061 since 2016. Every value leads to its source.

The problem

Thursday, 1:30 pm: the site manager wants the final invoice with no extra costs

Customer #9061, a steel service center in Saarlouis, is building Hall 3 for laser cutting and small-parts dispatch. The general contractor ordered two BK 10 t overhead cranes and 46 m of belt conveyor from Conveyra, job K 26-0388. Today is acceptance day for the hall.

The cranes have passed their inspection before first use. The conveyor is running. Then the site manager asks for the final invoice at the agreed price, with no extra costs. Three months of project emails and installation reports hold seven change requests, five of them outside the scope of supply. Not one is recorded as a change order:

In the mailboxes412 emails over three months. Six of them contain a request, usually in the third paragraph.

In the installation reportTwo days of waiting time for the installation crew, because the crane runway had not been surveyed.

In someone’s headThe installation manager agreed to the requests on site. He is already at the next site, in Trier.

Without evidence, the project manager signs. €55,970 of extra work is lost with the final invoice.

Minutes: hall acceptanceK 26-0388

Place
Saarlouis, Hall 3, customer #9061
Date
Present
General contractor’s site management, maintenance #9061, Conveyra project management
  1. Item 1

    BK 10 t overhead cranes, serial nos. 26-0611 and 26-0612: inspection before first use passed, static test at 12.5 t.

  2. Item 2

    Belt conveyor, 48 m with four curves: in operation, test run without findings.

  3. Item 3

    Final invoice: the general contractor’s site management demands closure with no extra costs.

  4. Item 4

    Change orders: none recorded.

What happens every month in the Overhead Cranes business unit

  1. 15change orders
  2. 300questions about a unit
  3. 150breakdowns
  4. 80quotes
  5. 40variants

Together that is 6,630 hours a year, about 3.8 full-time roles, in the Overhead Cranes business unit alone. By 2030, six competent persons from the inspection service and five service technicians from maintenance and breakdown service will have worked their last day: eleven of the 64 people in customer service.

What hurts there

  1. 01
    Extra work trickles away

    Requests come in by word of mouth on site or in the third paragraph of an email. Everything gets built. What gets billed is what someone wrote down.

  2. 02
    Every crane is a file in five systems

    Serial number in the ERP, inspection log in the service app, circuit diagram in E-CAD, CE file on the file share, service life on the inspector’s laptop. “Which crane is this?” costs a search every time.

  3. 03
    Troubleshooting know-how stays on the hotline

    On error F31, is it the brake rectifier, the coil or the air gap first? It’s mostly an old hand on the phone who knows. The service report only says what was replaced, not how they got there.

What demi does · An example

Nothing trickles away this time: five change orders with evidence before acceptance

  1. The assignment

    The project manager starts the change-order agent on job K 26-0388, three days before acceptance.

    K 26-0388AB 26-0388
  2. Everything in writing

    412 emails over three months, nine installation reports, the site diary and the general contractor’s bill of quantities.

    412 emailsMB-01 to MB-09
  3. Seven requests

    Each with the email or report it is based on, with date and sender.

    Mail #7714MB-06
  4. Against the scope of supply

    Order confirmation and bill of quantities: five requests fall outside, two are within the scope of supply.

  5. Five drafts

    Change-order quotes based on Conveyra’s price list and installation rates from the ERP, each with its evidence.

    NT-01 to NT-05
  6. The approval

    Project management and sales review the drafts and change one price. Unit management approves the change order for the vertical conveyor, because it is over €25,000.

    A person approvesLog

On the table at Thursday’s acceptance

Change-order list K 26-0388

No.RequestEvidenceScopeChange order
NT-01Last straight of the belt conveyor from 10 to 12 moutsideMail #7714
Aug 14
Mail #7714
Aug 14
outside€8,940
–Cranes in RAL 1007 instead of RAL 1028includedMail #7741
Aug 20
Mail #7741
Aug 20
included–
NT-02Additional vertical conveyor up to the mezzanineoutsideMail #7790
Sep 2
Mail #7790
Sep 2
outside€31,400
NT-03Two days of waiting, crane runway not surveyedoutsideMB-06
Sep 23
MB-06
Sep 23
outside€4,380
–Lift height 7.0 instead of 6.5 mincludedMail #7868
Sep 30
Mail #7868
Sep 30
included–
NT-04Conductor rail 6 m longeroutsideMail #7902
Oct 7
Mail #7902
Oct 7
outside€3,150
NT-05Second radio transmitter per crane, with control handoveroutsideMail #7955
Oct 21
Mail #7955
Oct 21
outside€8,100
7 requests, 5 change orders€55,970

The two requests within the scope of supply are listed too: the site manager sees that Conveyra draws a clean line.

Five open change orders on one job are not the rule at Conveyra, and the €55,970 is not counted in any figure on this page. The example calculation below only counts the time demi frees up per change order when searching emails and installation reports and drafting the quote: about 22 minutes.

ConveyraMaterials handlingExample company

Lift. Convey. Inspect. Since 1952.

A crane maker from Saarland, world market leader in automated coil cranes, with its own inspection service

From a steel town to coil stores around the world

  1. Ernst Molitor, a crane foreman at the Neunkirchen ironworks, opens a workshop next to the works gate. With six people, he repairs cranes and mine winches.

  2. The first in-house overhead cranes for rolling-mill and foundry halls, plus belt conveyors for the coal from the mines.

  3. The Neunkirchen mines have been closed since 1968. In July 1982 the ironworks stops making iron and steel too. Molitor Kranbau now builds for machine builders, steel traders and automotive suppliers, and in 1986 delivers its first automated coil crane to a steel service center.

  4. Its own range of electric chain hoists. From then on, every chain hoist comes from Neunkirchen. For the heavy cranes, the plant buys in wire rope hoists.

  5. The second generation takes the firm abroad, with companies in Atlanta and Shanghai. For the world market the family gives it a name that is easy to say anywhere: Molitor Kranbau becomes Conveyra.

  6. 2,400 people, the world market leader in automated coil cranes, companies in six countries and an in-house inspection service. Run by Lena and Jakob Molitor, the third generation.

Profile

Founded
1952 in Neunkirchen (Saar) by Ernst Molitor. Called Conveyra since 2004, still owned by the family
People
2,400 in the group, 300 of them in the companies abroad. In the Overhead Cranes business unit, 350 in nine departments, 114 of them in production and 38 in on-site installation. All departments in the org chart
Sites
Main plant in Neunkirchen with steel fabrication, machining and the 2016 assembly hall, spanned by two of its own 20 t cranes. Service bases in Kaiserslautern and Trier, sales and service companies in six countries (locations)
Customers
Machinery and plant engineering 20%, steel trade 15%, automotive suppliers 15%, logistics and retail 15%, metals and foundries 10%, energy, water, waste 10%, general contractors 10%, other 5%
Languages
Manuals and inspection reports in twelve languages; in the Overhead Cranes business unit, in German and French
Revenue
Around €480 million, 70% of it abroad and 30% from inspection, maintenance and spare parts
In the field
Around 90,000 cranes, hoists and conveyors in more than 60 countries, about 1,200 of them automated coil cranes. In Germany, the in-house inspection service inspects around 6,000 of its 18,000 a year
Per month
In the Overhead Cranes business unit, around 300 inquiries and quotes, 80 of them with real costing. 60 to 80 new orders
Systems
ERP, CRM, configurator, PDM, E-CAD, service app with inspection log, load spectrum recorder, file share, mailboxes

Locations

  • BirminghamUnited KingdomSalesConveyra UK Limited
  • Neunkirchen (Saar)GermanyHeadquarters, plant, engineering, inspection serviceConveyra Fördertechnik GmbH & Co. KG
  • AtlantaUnited StatesSales and serviceConveyra USA, LLC
  • ShanghaiChinaSales and serviceConveyra (Shanghai) Co., Ltd.
  • LyonFranceSalesConveyra France SAS
  • PoznańPolandServiceConveyra Polska Sp. z o.o.
  • DubaiUnited Arab EmiratesSalesConveyra Middle East FZE

Four product lines for one hall

  • BKOverhead cranesSingle and double girder, up to 80 t and 35 m span, plus automated coil cranes
  • KZElectric chain hoists125 kg to 10 t, FEM 1Bm to 3m
  • GFBelt and roller conveyorsBelts from 400 to 1,000 mm for containers and cartons, roller conveyors for pallets up to 500 kg at 0.2 m/s
  • VFVertical conveyorsContainers up to 50 kg or pallets up to 1,000 kg

Office Floor <=> Shop Floor

Where demi works at Conveyra: eight of 14 stations

demi can work at all 14 stations. Pick a use case and see which ones it touches.

Office Floor

  1. O1Market & tenders 
  2. O2Inquiry & crane question­naire4
  3. O3Hall layout & wheel loads4
  4. O4Quote & costing4
  5. O5Project & change orders1
  6. O6Engineering & circuit diagrams5
One record. Every fact runs both ways.

Shop Floor

  1. S2Installation on site1
  2. S4Stores & shipping 
  3. S5Breakdown service & spare parts2 3
  4. S6Cranes in the field & inspection log2
  • demi works here
  • Next at Conveyra
  • demi can work here too
  • Line: the path of the change orders on K 26-0388, from the project emails through installation to the change-order quote

The payoff

Example calculation: five use cases free up 1,189 hours a year

≈ $77,285 per yearEstimate, not a promise
StartUse caseVolume per monthShareToday per yearFreed upValue per year
1Find and bill change ordersProject management15 × 2 h30%360 h65 h$4,225
2Find your installed base by serial numberService300 × 10 min40%600 h144 h$9,360
3From error code to cause, step by stepService150 × 45 min25%1,350 h203 h$13,195
4Build quotes from similar past ordersSales80 × 3 h30%2,880 h518 h$33,670
5Variant BOM from the customer's requirementsEngineering40 × 3 h30%1,440 h259 h$16,835
Total6,630 h1,189 h$77,285

Calculated for the Overhead Cranes business unit. Of 6,630 hours, we count 1,189: volume times time times twelve months, then only the cautious share of that, times 0.6 for partly digital processes. That is about 0.7 full-time roles. Calculated at $65 per hour: $48.62 labor cost in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead. A number doesn’t fit your company? You can change every one of them in the configurator.

The start

How Conveyra starts: change orders first, then every crane in the field

Which systems and use cases join in the first 90 days
The first 90 daysDay 1Week 1Weeks 2 to 4Months 2 and 3
Systems
Mailboxes, file shareProject mailboxes and job folders, read-only
ERP, service appRead-only, via a small connector in their own network
E-CAD, load spectrum recorderRead-only
CRM, configurator, PDMRead-only
Use cases
1 Change ordersWith approval. Part of daily work from day 30
2 Installed baseWith approval
3 Error codeWith approval
4 QuotesWith approval
5 Variant BOMWith approval
Writing back
Into the ERPAfter approval

Why change orders come first

They free up the fewest hours, 65 a year, but every change order found is money for work Conveyra has already done. The requests the change-order agent looks for are already in each job’s project mailbox and job folder. Approval lies with project management; above €25,000, with unit management. From week 1, demi knows every crane by its serial number through the ERP and the service app. The breakdown service, quotes and engineering build on that.

What Conveyra does itself

  • Head of ITTwo days for the connections
  • Head of projectsOne hour a week
  • Project managersTwo weeks of reviewing drafts, alongside normal work

1Data

Nine systems become one record

1,244entries
1,343links
9systems

An excerpt from Conveyra’s record.

AConnected

  • ERP
    Jobs, quotes, BOMs per order, purchase orders, invoices, serial number on deliveryOnce delivered, the crane is a closed order. Its serial number does not live on here
  • CRM
    Customers, contacts, visits, tendersThe general contractor is in it. The operator who runs the crane for thirty years often is not
  • Configurator
    Spans, girder sections, end carriages, wheel loads, hoist selection, priceHalf the rules sit in two spreadsheets kept by two design engineers
  • PDM
    Drawings of main girders and end carriages, engineering BOMs, changesOne girder drawing per span, so the number of drawings explodes
  • E-CAD
    Circuit diagrams, terminal diagrams, control cabinet layoutChanges made on site are marked on the diagram in ballpoint pen
  • Service app with inspection log
    Inspection dates, findings with photos, service reports, maintenance contractsFindings as free text, the repair quote gets retyped in the ERP
  • Load spectrum recorder
    Operating hours, load spectrum, overload events, service life usedRead out by laptop at the inspection. The file stays on the laptop
  • File share
    CE files, manuals in German and French, scanned inspection logs, 3.1 certificatesFive copies per crane, paper only before 2005
  • Mailboxes
    Breakdown reports, project emails, correspondence with general contractorsThat is where change orders get agreed and forgotten

Nothing gets replaced. Running a different ERP? demi connects to everything, from SAP and Oracle to the specialist software from the next town. At first, demi only reads. A person connects a system after seeing who will read what.

BHeld together

The same crane. Nine systems. Now one entry.
Serial no. 16-0542Source: ERP, delivery for job K 16-0219
Customer #9061, Hall 2Source: CRM
Crane runway KB 1, 54 mSource: file share, survey by the hall builder
KZ 10 t, S/N 1611-0287Source: ERP, as-built BOM
FEM 2m (ISO M5)Source: configurator, design of 16-0542
62% usedSource: load spectrum recorder, read out Oct 14, 2026
Inspection entry PB 26-0542-10Source: service app
Defect M 26-0091, load chainSource: service app, photo 3 of 7
Circuit diagram SP-16-0542Source: E-CAD
Declaration of conformity KE 16-0542Source: file share, CE file
Target value, FEM 9.755D = 1,600 hTheoretical service life, mechanism group 2m
Actual value, load spectrum recorderS = 992 h3,420 operating hours, load spectrum factor km 0.29

CLinked

Customer #9061 runs crane 16-0542, a BK 10 t with a KZ 10 t chain hoist, in Hall 2 on crane runway KB 1.

Who?

Customers, contacts, teams

  • Customer #9061Steel service center, customer since 2009
  • K-9061-3Head of maintenance, person
  • OE-KD-PDInspection service within customer service

CRMoperated by customer #9061

What kind?

Product ranges and BOMs

  • BK 10 tSingle-girder overhead crane
  • KZ 10 tHoist, S/N 1611-0287
  • STL-16-0542As-built BOM
  • 52-118-07Load chain, in 212 hoists

PDM, ERPis a BK 10 t with a KZ 10 t

Where?

Plants and halls

  • ST-9061-01The customer’s Saarlouis plant
  • H2-KB1Hall 2, crane runway KB 1, 54 m
  • H3Hall 3, acceptance on Nov 19

CRMin Hall 2 since 2016

What’s going on?

Service calls and breakdowns

  • T 26-1290Breakdown with error F31: brake does not release
  • SB 26-04417Service report on the breakdown

Service appservice call on this crane

Which one exactly?

Crane 16-0542

Serial number, built 2016

  • Once a file in five systems, now one number: nobody asks “Which crane is this?” any more.

ERPdelivered with K 16-0219

What applies?

Contracts and quotes

  • WV 9061-02Maintenance contract with inspection
  • #26-0412Quote: chain and hook
  • K 16-0219Job for the 2016 delivery

ERPcontract for this crane

What’s in writing?

Inspection log, diagrams, manuals

  • PB 26-0542-10Inspection entry 2026
  • KE 16-0542Declaration of conformity
  • SP-16-0542Circuit diagram
  • BA-BK-DE/FRManual, rev. 4

Service app, file share, E-CADabout this crane

What should it be?

Deadlines and limits

  • M 26-0091Correct defect 1 by Nov 30
  • M 26-0092Correct defect 2 by Nov 30
  • D 1,600 hService life, FEM 2m

Service appdeadline on this crane

What do we make of it?

Findings

  • F-26-044D will be reached around 2032, plan a general overhaul
  • F-26-045Chain 52-118-07 close to the discard limit in three of this customer’s cranes

demifinding on this crane

At the pump maker, the pump with its serial number sits in the middle; at the machine builder, the line at the customer’s site; at the space supplier, the flight unit in orbit. At Conveyra, it is the crane with its serial number. The grid stays, the middle changes.

DWhat it can do

  • Recognize

    Crane 16-0542, “the ten-tonner in Hall 2” at the customer and the folder “SLS H2 BK” are the same crane.

  • Unify

    The labels FEM 2m, ISO M5 and “Gruppe 2m” become one value with one service life.

  • Trace

    Every value shows its source, exact location and version. Unclear rows are kept too.

  • Look back

    The BOM as built in 2016 and as it stands today, with the chain from 2021, not the one in the quote.

  • Write back

    After approval, the change order lands in the ERP.

2Rights

The org chart becomes the permission system

What only estimating sees in the ERP, only estimating sees in demi. And at the customer’s site, only the people the operator approves can see a crane’s inspection log.

Overhead Cranes business unit: 350 people, nine departments

Until a crane is in place at the operator’s site, sales, engineering, production and installation all have it in hand. After that, customer service keeps coming back to it for decades.

Unit management and staff functions 15Unit management and assistants 4 · Finance, controlling, HR, IT 11
  • 1Sales 26
    • Sales engineers 10
    • Quotes & estimating 10
    • Inside sales 6
  • 2Project manage­ment 14
    • Project managers 9
    • Order processing 5
  • 3Engineering 44
    • Mechanical and structural 30
    • Electrical and controls 14
  • 4Purchasing and planning 26
    • Purchasing, materials planning 12
    • Process planning 8
    • Stores 6
  • 5Production 114
    • Steel fabrication, welding 58
    • Machining 22
    • In-plant assembly 34
  • 6On-site installation 38
    • Installation crews 32
    • Installation management 6
  • 7Customer service 64
    • Inspection service 24
    • Maintenance, breakdown service 28
    • Spare parts 12
  • ·Quality and CE 9
    • Welding supervision 3
    • QM 2
    • Documen­tation and CE 4

15 + 26 + 14 + 44 + 26 + 114 + 38 + 64 + 9 = 350 people

Who opens which room

WhoCranes in the field, inspection logsEngineering, circuit diagramsQuotes, pricesCosting, change ordersProject mailboxesHRApproves
Unit management and staff functionsreads–readsreads–HR onlyChange order over €25,000
Salesreadsreadseditsreads––Quote, price
Project managementown jobreadsreadsown jobown job–Change order, acceptance
Engineeringreadsedits––own job–BOM, circuit diagram
On-site installationper jobreads––own site–Installation report
Customer serviceeditsreadsspare parts–––Inspection finding, spare-part quote
Quality and CEreadsreads––––Declaration of conformity
Customer #9061 in the portalown cranesown documentsown–––Defects corrected
Installed-base agent, AI coworkerreadsreads––––Never
Change-order agent, on someone’s behalfAs much as the person who starts it. No more.Never

Every room has keys. They come from your systems and never multiply on their own.

Prices, costing and change orders are seen only by those responsible for them. In the portal, the customer sees only its own cranes, documents and quotes.

An agent carries the keys of the person it works for. An AI coworker has its own, and always a person who is accountable for it. Every access is in the log.

3Intelligence

Five agents do the work, people approve

  1. Change-order agent

    Works for the person who starts it

    TriggerA project manager starts it on a job every week, and at the latest before acceptance
    ReadsProject mailboxes, order confirmation, bill of quantities, installation reports, site diary, price list
    DoesFinds change requests, checks them against the scope of supply, drafts change-order quotes with evidence
    ApprovalProject management; over €25,000, unit management
  2. Installed-base agent

    AI coworker, accountable: head of customer service

    TriggerQuestion about a serial number, new delivery, new inspection entry
    ReadsDeliveries in the ERP, as-built BOMs, inspection logs, load spectrum recorders, maintenance contracts
    DoesKeeps the file on each crane: what is fitted, what was inspected, how much service life is left
    ApprovalCustomer service confirms gaps
  3. Troubleshooting agent

    Works for the person who starts it

    TriggerSomeone on the breakdown hotline starts it with the serial number and error code
    ReadsThe circuit diagram for exactly this serial number, the control system’s error list, earlier breakdowns in the same range
    DoesSuggests the test steps in the right order, shows similar cases and the matching spare part
    ApprovalThe technician decides
  4. Quote agent

    Works for the person who starts it

    TriggerSomeone from quotes & estimating starts it on a crane questionnaire or a tender
    ReadsCrane questionnaire, earlier quotes, jobs, job costing, change orders
    DoesFinds the most similar orders, shows planned against actual, drafts the costing and the values for the crane dimension sheet
    ApprovalQuotes & estimating, sales engineer
  5. Variant agent

    AI coworker, accountable: head of engineering

    TriggerNew order in the ERP
    ReadsCrane questionnaire, the configurator’s rule set, the modular kit in the PDM, wheel loads
    DoesDerives the variant BOM and flags anything that breaks the rule set, such as an end carriage whose permissible wheel load falls short
    ApprovalEngineering

At Conveyra, a change order costs what the price list and installation rates say, and a new crane or conveyor what the in-house costing comes to.

Calculations run on Conveyra’s own rules and data, not in the language model. Anything that goes out or is written back to a system is approved by a person.

The roadmap

Next up: initial inspection, steel fabrication, purchasing and installation planning

  1. Initial inspection and CE file

    The inspector dictates the finding, demi writes the entry in the inspection log. The declaration of conformity and the manual are produced for each serial number, in German and French. From January 20, 2027, the new EU Machinery Regulation applies.

    S3
  2. Steel fabrication

    Welding records, weld inspection reports and 3.1 inspection certificates are linked to the main girder and the serial number, not filed in a folder. Then the inspector can still find them twenty years later.

    S1
  3. Purchasing and installation planning

    Hoist delivery dates, available installation crews and the hall builder’s runway date in one plan. Then you see a two-day wait coming.

    O7O8

Sources

Why data first, then rights, then AI

60%

Through 2026, Gartner expects organizations to abandon 60% of AI projects that lack AI-ready data.

Gartner · 2025 · on step 1, dataOpen the source (opens in a new tab)
Least privilege

Share sensitive data in LLM apps on a least-privilege basis only, meaning just what a user or process needs.

OWASP GenAI Security Project · 2025 · on step 2, rightsOpen the source (opens in a new tab)
70%

70% of AI’s potential value sits in core functions such as sales, manufacturing and supply chain.

Boston Consulting Group · 2025 · on step 3, intelligenceOpen the source (opens in a new tab)
ConveyraMaterials handlingExample company

Conveyra doesn’t exist. Your company does.

In 20 minutes we show you demi on a case like yours: bring the data together, set the rights, let AI do the work.

Conveyra Fördertechnik GmbH & Co. KG is made up: a typical company in Conveying & Intralogistics, not a real one. An estimate from our assumptions, not a promise. You can change every number in the configurator.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases