Today
Preparing for an annual supplier meeting often means pulling data from the ERP, contracts and spreadsheets the night before. In the meeting, impressions count instead of facts. The supplier often brings the better figures.
An example
Before the annual meeting with the foundry that casts the TG 80 gearbox housings, the briefing at Talwerk Antriebstechnik shows volume up 18 % on the previous year, two quarters with late deliveries and a 7 % price increase while the cast-iron index rose 2 %. It also lists a qualified second supplier with a quote from March.
Your data, wherever it lives
Spend and price history sit today in the ERP, contracts and terms in the DMS, supplier scorecards in spreadsheets, competing quotes as PDFs in e-mails and raw-material indices on web portals. demi reads, understands and links them per supplier, with your rights. The briefing with price trend against the index, delivery performance and alternatives is ready in minutes instead of hours of searching the night before, and you decide which targets to aim for.
Where the data lives today
- ERP
- DMS & archive
- Office files
- PDFs
- E-mails
- Web & portals
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: the ERP, DMS, spreadsheets and e-mail. demi replaces nothing and joins spend, price history, contract terms, scorecards, competing quotes and your raw-material indices per supplier. demi writes back only after approval.
- 2 · PermitPermission Layer
Only the responsible buyer and the head of purchasing see the briefing, and it cannot be passed on to the supplier. The head of purchasing approves the contract change after the meeting, and this is recorded.
- 3 · ActIntelligence Layer
The agent compiles volume trend, price changes against raw-material indices, delivery problems and alternatives; it calculates the comparisons from bookings and index series, not by estimate, every figure linked. It proposes targets and drafts the agenda or the request for quotation.
How it runs
- 1
The buyer picks the supplier and the meeting date.
- 2
The agent collects volumes, prices, contracts, ratings and competing quotes.
- 3
It sets the price trend against the raw-material indices and flags anything unusual.
- 4
It proposes negotiation targets and drafts the agenda or a request for quotation.
- 5
After the meeting the buyer records the result, and the agent prepares the contract change.
What changes
Well-prepared negotiations
Arguments backed by figures and sources
Less time spent preparing
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+144 hfreed per year
Assumptions and calculation
demi puts volume, price trend, performance and alternatives on one page; you negotiate.
3 h → 1.8 h per case
How we calculate
10 negotiations × 3 h × 40% × 1.0 (manual) × 12 months = 144 h
Value per year, before demi costs
Freed per year+144 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$9,360
gained per year
144 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Which data go into the briefing?
Spend and price history from the ERP, terms from the contracts, delivery performance and complaints from the supplier scorecard, and competing quotes. Whatever is missing, the agent shows as a gap instead of estimating it. Every figure leads to the booking or document behind it.
Can demi compare prices with raw-material indices?
Yes, with the indices you choose, for example for steel, aluminum, copper or castings. The agent puts the price trend and the index on the same period and shows the difference. The calculation is traceable, not estimated.
Does the agent draft the request for quotation?
Yes. From parts, quantities and requirements it drafts a request to the current supplier and to alternatives. It only goes out once the buyer has approved it.
Could the briefing end up with the supplier?
No. The briefing is internal and visible only to the responsible buyer and the head of purchasing. Anything that goes outside, such as a request or minutes, is a separate document and needs approval.
