Today
From the end of 2026 the EU applies common positive lists for materials in contact with drinking water. Pumps, valves and pipes come in thousands of variants, with housings, impellers, seals and coatings from dozens of suppliers. Nobody knows which variant contains an alloy or compound that is not on the lists: the data sits in BOMs, material certificates and supplier declarations, and when a foundry switches alloy, often nobody notices.
An example
At Hartwig & Brunn Pumpenwerk the agent reads the materials of all wetted parts in 2,400 pump and valve variants for drinking water supply. It finds two gaps: since spring a foundry has been casting the impellers of the KP DN 100 series in a copper alloy whose composition is not on the list, and for two EPDM compounds from a seal supplier there is no proof that they are made only from listed starting substances. 312 variants are affected: 280 through the impeller, 32 through the seals. For the impellers the agent shows that a version in 1.4408 is already released; for the seals it drafts the request to the supplier. Quality and engineering switch the impellers, and purchasing sends the request.
Your data, wherever it lives
The data on your products' materials is scattered today: BOMs and drawings in the PLM, suppliers and material certificates in the ERP and DMS, supplier declarations and test reports as PDFs and in e-mails, and the positive lists and assessment rules on the authorities' websites. demi reads, understands and links it per part and variant, with your rights. The AI checks thousands of variants against the lists in days instead of months, and your quality team decides.
Where the data lives today
- PLM
- ERP
- PDFs
- Web & portals
- DMS & archive
- E-mails
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from the PLM, ERP, DMS, supplier declarations and the published positive lists. demi replaces nothing and links every wetted part of every variant with its material, alloy or compound, supplier, test report and certificate, plus the European positive lists and the national assessment rules in their current versions.
- 2 · PermitPermission Layer
Formulation details and supplier declarations are visible only to quality, engineering and purchasing, often under a confidentiality commitment; sales sees per variant only whether it is covered. An authorized person in quality releases the assessment of a variant and every statement to customers, and every release is recorded.
- 3 · ActIntelligence Layer
The agent reads materials and compound numbers from BOMs, drawings and supplier declarations and checks them exactly against the lists: alloys against the list of compositions, plastics and elastomers through the manufacturer's statement on starting substances. It rolls the result up through the BOM to every variant, shows the affected variants with part and source and drafts requests to suppliers. What is not proven stays marked open and never counts as compliant.
How it runs
- 1
demi reads BOMs, drawings and material data and marks every part that touches drinking water.
- 2
For each part the agent finds material, supplier declaration, test report and certificate.
- 3
It checks alloys, plastics, elastomers and coatings against the positive lists.
- 4
It rolls the result up to every variant and shows which need new proof or a different material.
- 5
Quality and engineering decide on requests, changes and statements to customers.
What changes
You know before the deadline which variants need new proof
Material changes at suppliers are caught before the parts are built in
Customer questions about drinking water suitability answered in minutes
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+162 hfreed per year
Assumptions and calculation
demi checks materials and evidence per variant against the positive lists; quality reviews and decides.
90 min → 63 min per case
How we calculate
30 drinking water suitability checks × 90 min × 30% × 1.0 (manual) × 12 months = 9,720 min = 162 h
Value per year, before demi costs
Freed per year+162 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$10,530
gained per year
162 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Which lists does demi check?
The European positive lists for materials in contact with drinking water: starting substances for organic materials, compositions of metallic materials, organic constituents of cementitious materials and compositions of enamels, ceramics and other inorganic materials. Plus the national assessment rules of your markets while they apply. When a list changes, the agent checks all variants again.
How does demi check plastics and elastomers?
For organic materials what counts are the starting substances of a compound, and usually only the manufacturer knows them. So the agent checks whether there is a declaration and a test report for the exact compound number that cover the lists. If not, it drafts the request to the supplier; demi does not need to know the formulation itself.
What happens when a supplier changes the material?
The agent reads the chemical composition from every 3.1 inspection certificate and compares it with the list and the proven state. If a foundry switches to a different alloy, it flags the affected variants before the parts are built in.
Does demi send statements to customers?
demi drafts the reply to a customer question with the evidence per variant. It goes out only after an authorized person in quality releases it, and confidential supplier documents stay in-house.
