Design the transformer to the customer's loss evaluation

AI evaluates every design variant with the tender's loss prices and shows which one is cheapest by the utility's own evaluation.

Today

Utilities and grid operators do not buy distribution transformers on purchase price alone. They capitalize no-load and load losses over the service life with their own factors in euros per watt and award to the lowest evaluated price. Which design variant that is depends on core steel, windings and the factors of this one tender. In sales, one person often works it out in a private spreadsheet under time pressure, and whoever quotes on manufacturing cost alone loses the tender with the cheaper transformer.

An example

A municipal utility tenders 40 distribution transformers of 630 kVA, 20/0.4 kV, Dyn5, ONAN, and values no-load losses at 9 euros and load losses at 2 euros per watt. At Wattaris the agent evaluates three design variants: the one cheapest to build ends up 690 euros per unit behind the variant with better core steel and a larger conductor cross-section, 27,600 euros across 40 units. From 180 routine test reports of that variant it shows that every unit built stayed below the guarantee values, by 3 % on average, so a penalty for exceeded losses is unlikely. The sales engineer offers the more expensive variant, sets the guarantee values and releases the quote the same day.
Fictional company, typical workflow.

Your data, wherever it lives

What a transformer really costs the utility is spread across many sources today: the evaluation formula in the tender documents in the mailbox, design variants and calculated losses in the PLM, measured losses in routine test reports in order folders, manufacturing costs in the ERP, and the calculation in a sales spreadsheet. demi reads, understands and links them per variant and tender, with your rights. The AI evaluates every variant in minutes instead of hours, and the sales engineer decides what to offer.

Where the data lives today

  • E-mails
  • PDFs
  • Office files
  • Folders & drives
  • PLM
  • ERP
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    Data sources in this case: tenders and specifications in the mailbox, design variants with core steel, winding data and calculated losses in the PLM, routine test reports from the test bay as PDFs in order folders, manufacturing costs and past quotes in the ERP, and the sales team's spreadsheets. demi replaces nothing and links every design variant to its calculated and measured losses, its costs and the tenders it was offered in. You see how far built transformers of a variant came in below their guarantee values.

  2. 2 · PermitPermission Layer

    Manufacturing costs, margins and quoted prices are visible only to sales and costing, design data to engineering. A tender's documents are visible only to the team working on it. An authorized person releases guarantee values and price before the quote goes out; the release is recorded.

  3. 3 · ActIntelligence Layer

    The agent reads rated power, voltages, vector group, limit values and the evaluation formula with its factors from the tender. demi computes each variant's evaluated price exactly by that formula, not with the language model. The agent checks every variant against the limits of the EU Ecodesign regulation and the tender's requirements and shows from routine tests how safe the guarantee values are.

How it runs

  1. 1

    The tender arrives with its specification, technical conditions and evaluation formula.

  2. 2

    The agent reads power, voltages, limits and the factors for no-load and load losses.

  3. 3

    For every suitable design variant it adds purchase price and loss costs into one evaluated price.

  4. 4

    From routine test reports of built units it shows how far measured losses stayed below the guarantee values.

  5. 5

    The sales engineer chooses the variant, sets guarantee values and price and releases the quote.

What changes

  • You offer the variant that wins on the customer's evaluation

  • Guarantee values with margin, backed by measured losses

  • Tenders evaluated faster and the same way across the team

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+130 hfreed per year

Assumptions and calculation

demi reads the tender's formula and factors and evaluates every design variant; you choose and set the price.

3 h → 2.1 h per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

12 tenders × 3 h × 30% × 1.0 (manual) × 12 months = 130 h

Value per year, before demi costs

Freed per year+130 h

Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.

= Value per year, before demi costs

+$8,450

gained per year

130 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Which evaluation formulas can demi calculate?

The one written in the tender: usually purchase price plus no-load losses times factor A plus load losses times factor B, sometimes with a load profile, interest rate and service life. The agent reads formula and factors from the documents and shows you the passage. The calculation itself runs exactly, every number traceable.

Where do each variant's losses come from?

From your engineering calculations in the PLM and from routine test reports of built units. The agent shows both side by side, calculated and measured. If a variant has no measurements yet, the result says so.

Does demi check the Ecodesign limits too?

Yes. Every variant is checked against the maximum losses of the EU Ecodesign regulation for transformers and against stricter requirements in the tender. Variants above a limit drop out, with the reason.

Who decides which variant is offered?

The sales engineer, often together with engineering. The agent calculates and explains; you set price, guarantee values and variant. The quote goes out only after release by an authorized person.

See this case with your data

In the demo we show you the workflow on your own systems.