Skip to content
Planning & productionConstruction & Building ServicesMining & Raw Materials

Blasts, vibration and neighbors at a glance

demi links every blast with its vibration readings and complaints, checks the guideline values and shows what drives the vibration.

Today

Every blast produces a drilling and blasting plan, a vibration record and sometimes a complaint. The plans sit in the blasting log and in spreadsheets, the readings in PDF reports from the monitoring service, the complaints in e-mails, letters and phone notes. Nobody puts them side by side, and when the authority or the local council asks why glasses rattle in cupboards in the village, the answer takes weeks and stays a guess.

An example

At Montanis Hartsteinwerke, blasts on the east face keep drawing complaints from a village district 650 m away, although the monitoring point at the nearest house never shows more than 3.1 mm/s, below the DIN 4150-3 guideline value. The agent lines up 46 blasts from the last twelve months with readings, weather and 23 complaints: almost every complaint follows a blast with more than 110 kg per delay and high air overpressure during a temperature inversion in the early morning. It proposes splitting each borehole into two charges with their own delay, which keeps every delay at 70 kg or less, and blasting from midday on. The licensed blaster adopts this, and the site manager sends the local council the analysis with the readings.
Fictional company, typical workflow.

Your data, wherever it lives

Blasts are recorded today in a paper blasting log and in spreadsheets, borehole surveys as files in folders, vibration readings as PDF reports and monitor exports, complaints in e-mails, letters and phone notes, plus photos and videos of the blast on phones. demi reads, understands and links them per blast, with your rights. Across all blasts, the AI shows in minutes what drives the vibration; the licensed blaster decides the next blast design.

Where the data lives today

  • Office files
  • Scans & paper
  • Folders & drives
  • PDFs
  • Machines & sensors
  • E-mails
  • Phone & voice
  • Photos, video & audio
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    The case needs data from the blasting log, borehole surveys, vibration monitors, the permit, the mailbox and phone notes. demi replaces nothing and links per blast the drilling and loading plan, charge per delay, face profile, time and weather with the readings of every monitoring point, meaning peak particle velocity, frequency and air overpressure, and with every complaint including address and time.

  2. 2 · PermitPermission Layer

    Blasting and loading plans and explosive quantities are visible only to licensed blasters, site management and surveying; residents' names and addresses only to those who handle their complaints. demi proposes parameters; only the licensed blaster may plan and fire a blast. Replies to residents and reports to the authority go out only after site management releases them.

  3. 3 · ActIntelligence Layer

    The agent checks every reading against the DIN 4150-3 guideline values for the type of building at the monitoring point and against the permit conditions. From all past blasts it derives the quarry's own attenuation law: how vibration falls with distance and charge per delay. It shows which parameters drive vibration and complaints and computes the charge for the next blast that keeps a clear margin to the limit. Calculations follow fixed formulas; the language model only explains.

How it runs

  1. 1

    After each blast, the blasting record, the borehole survey and the data of every monitoring point reach demi.

  2. 2

    The agent checks every reading against DIN 4150-3 and the permit conditions and reports an exceedance to site management at once.

  3. 3

    It links every complaint, whether e-mail, letter or call, by time and address to the blast and the nearest monitoring point.

  4. 4

    Across all blasts it shows what drives the vibration and proposes charge per delay and blasting time for the next one.

  5. 5

    The licensed blaster decides on the plan; site management releases replies to residents and reports to the authority.

What changes

  • Every blast with plan, readings and complaints in one place

  • Replies to residents and authorities with readings instead of guesses

  • Blast designs that lower vibration on purpose

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+108 hfreed per year

Assumptions and calculation

demi links each blast with readings and complaints and checks the limits; you decide.

2.5 h → 1.75 h per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

12 blasts × 2.5 h × 30% × 1.0 (manual) × 12 months = 108 h

Value per year, before demi costs

Freed per year+108 h

Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.

= Value per year, before demi costs

+$7,020

gained per year

108 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Which vibration data can demi read?

The exports of your vibration monitors, for example as CSV files, the PDF reports of the monitoring service and readings that are still copied into spreadsheets by hand. The agent assigns every reading by time and device to the right blast and monitoring point. If a reading is missing, it shows the gap.

Against which values does demi check the vibration?

Against the DIN 4150-3 guideline values for the type of building at the monitoring point, depending on frequency, and against the limits in your permit. You can add stricter internal values and the assessment for people in buildings under DIN 4150-2. Every check shows which value applied.

Does demi plan the blast?

No. The agent computes from your own blasts which charge per delay a face can take and proposes it. The licensed blaster draws up the drilling and blasting plan, is responsible for it and alone decides on firing.

How does this help with complaints from neighbors?

Every complaint is linked to the blast and to the readings of the nearest monitoring point. The agent drafts a reply with those readings; site management checks and sends it. Over months it shows patterns, such as weather conditions or times of day when complaints pile up.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases