Today
Machines for the US and Canada need a control panel built to UL 508A and electrical equipment to NFPA 79. Panels are often built the European way: miniature circuit breakers that count only as supplementary protectors there, parts without a listing, a light-blue neutral, no short-circuit current rating on the nameplate. This shows up at the site inspection, and the rework happens at the customer's plant.
An example
Conveyra Fördertechnik builds a conveyor line for a distribution center in Kentucky, 480 V and 60 Hz; the customer requires a short-circuit current rating of 65 kA. In the electrical BOM of 412 lines the agent finds 9 parts without a listing and 4 miniature circuit breakers recognized only as supplementary protectors. It calculates the panel's SCCR at 10 kA, limited by the power distribution blocks in the infeed, and proposes listed alternatives from the supplier catalog. The electrical engineer swaps the parts before anything is ordered.
Your data, wherever it lives
Schematics and the electrical BOM live in electrical CAD, items and part numbers in the ERP and PLM, data sheets and certificates as PDFs on the drive and on the web, the customer's specification in e-mails. demi reads, understands and links them, with your rights. The AI checks hundreds of parts for listings and the SCCR in minutes instead of days, and your electrical engineers decide on every swap.
Where the data lives today
- CAD & drawings
- ERP
- PLM
- PDFs
- Folders & drives
- Web & portals
- E-mails
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: electrical CAD, PLM, ERP and the manufacturers' data sheets. demi replaces nothing and links every line of the electrical BOM with its part number, data sheet, certificate and its place in the schematic, plus the customer's electrical specification. demi writes back only after approval.
- 2 · PermitPermission Layer
Schematics and customer specifications are visible only to electrical engineering, project management and purchasing. The responsible electrical engineer releases the panel for build, and every assessed deviation is recorded in the check report with name and date.
- 3 · ActIntelligence Layer
The agent looks up each part's listing by its exact part number and names the certificate number instead of guessing from similar names. The SCCR comes from a fixed, versioned calculation following UL 508A; the language model only explains which parts limit it and which listed alternatives exist.
How it runs
- 1
The electrical BOM and schematics come from electrical CAD, with the customer's specification and the available fault current at the site.
- 2
The agent looks up the listing for every part number in the data sheet, the certificate and the public directory.
- 3
It calculates the panel's SCCR and shows which parts limit it.
- 4
It checks protective devices, wire colors, conductors and the nameplate against NFPA 79 and the customer's specification.
- 5
Electrical engineering assesses each deviation, swaps parts and releases the panel for build.
What changes
Deviations found before the build, not at the customer's site
Less rework and fewer site visits
One check report per panel with every certificate number
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+173 hfreed per year
Assumptions and calculation
demi checks every part for its listing and calculates the SCCR; you assess and release the panel.
12 h → 8.4 h per case
How we calculate
4 control panels × 12 h × 30% × 1.0 (manual) × 12 months = 173 h
Value per year, before demi costs
Freed per year+173 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$11,245
gained per year
173 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
How does demi know whether a part is listed?
From the exact part number: the agent looks it up in the manufacturer's data sheet and certificate and in the testing laboratories' public directories, and names the certificate number. If a part is only a recognized component, it shows the conditions of use. If it finds nothing, the part is marked as unresolved in the report.
How does demi calculate the panel's SCCR?
With a fixed, versioned calculation following UL 508A. It walks through every power circuit and takes the values from data sheets and certificates or, where none exist, the standard's default values. The result names the limiting part; the language model does not calculate.
Does this also work for panels going to Canada?
Yes. For Canada the agent checks the parts for CSA or cULus marking and the panel against CSA C22.2 No. 286 and your requirements. You decide which edition of a standard applies.
Does demi replace the inspection on site?
No. Inspection and certification stay with the testing laboratory and the authority. demi makes sure the panel arrives without known gaps and supplies the check report with every certificate number.