Skip to content
Planning & productionElectronics & SensorsMetal & MachiningPlastics & PackagingTool & Mold Making+4

Shorter changeovers from one video

You film a changeover, demi breaks it into steps and writes the new changeover standard, without rating people.

Today

Changeovers cost machine hours every day. Yet a changeover analysis today means someone watches a 90-minute video, times every move and types it into a spreadsheet. That takes a whole day, so it happens once in a workshop and never again. The changeover instruction stays as it was, and every shift does it differently.

An example

At Polivo Kunststoffverpackungen, a setter films the mold change on injection molding machine SG 7 from VS-38 closures to lids for cream jars: 96 minutes. demi breaks the video into 47 steps and shows that 28 minutes go on fetching, searching and waiting, and that the mold is only brought to temperature after it is installed. The agent proposes preheating the mold outside the machine, staging clamps and hoses on a changeover cart and loading the saved settings from this mold's last run, and writes the instruction with 16 stills. At the next changeover demi measures 61 minutes.
Fictional company, typical workflow.

Your data, wherever it lives

What happens during a changeover sits today in videos on smartphones and network drives and in the setters' heads; changeover times are in the MES, the instruction is a Word file in the DMS. demi reads, understands and links videos, times and instructions, with your rights. The AI breaks down a changeover video in minutes instead of a whole day, and your team decides which sequence becomes the standard.

Where the data lives today

  • Photos, video & audio
  • MES
  • Office files
  • DMS & archive
  • Folders & drives
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    Data sources in this case: videos, the MES, spreadsheets, the DMS and the file share. demi replaces nothing and links the changeover video with machine, mold, order and past changeover times from the MES, and puts the current changeover instruction from the DMS next to it. You see how long this changeover usually takes and what the instruction prescribes.

  2. 2 · PermitPermission Layer

    Filming follows rules you agree with the works council; demi blurs faces and analyses steps, not people. Only those involved in the changeover project see the video. Production management releases the new changeover standard, and the release is recorded.

  3. 3 · ActIntelligence Layer

    The agent recognizes the individual steps in the video, such as fetching the mold, loosening clamps, disconnecting hoses, changing the mold, setting parameters and checking the first part, and times them. It marks what could be done while the machine runs and shows walking, searching and waiting. From that it drafts the new sequence and the changeover instruction with stills from the video; the times come from the video, not from estimates.

How it runs

  1. 1

    Someone films a changeover with a smartphone or a fixed camera at the machine.

  2. 2

    demi breaks the video into steps, times each one and separates internal from external set-up.

  3. 3

    The agent marks walking, searching and steps that can happen before or after the stop.

  4. 4

    It drafts the new sequence and the changeover instruction with stills from the video.

  5. 5

    The team checks, production management releases the standard, and the next video shows whether it works.

What changes

  • Shorter changeovers and more machine hours

  • One changeover standard every shift follows the same way

  • Changeover analyses in hours, not once a year in a workshop

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+144 hfreed per year

Assumptions and calculation

demi breaks the video into steps and drafts the standard instead of someone timing every move; you release.

5 h → 3 h per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

6 changeover analyses × 5 h × 40% × 1.0 (manual) × 12 months = 144 h

Value per year, before demi costs

Freed per year+144 h

Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.

= Value per year, before demi costs

+$9,360

gained per year

144 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Does demi rate the people doing the changeover?

No. demi analyses steps, walking and waiting, not the performance of individuals, and blurs faces. You agree with the works council what is filmed and how long videos are kept, and demi follows those rules.

What camera do I need?

A smartphone on a tripod is enough. If you also want to capture the walks to the mold store, film with a second camera or carry the smartphone along. Sound helps recognition but is not required.

How does demi know what can be done as external set-up?

From the rule that only steps requiring a stopped machine must be internal, and from what happens in the video: a mold that is only preheated during the stop, or hoses that first have to be found, are typical candidates. Every shift to external set-up is a proposal with its reasons; you decide whether it is technically possible.

What happens with the new changeover standard?

demi writes it as a changeover instruction with stills from the video and files it in the DMS after release, translated for every shift if you wish. With each new video demi measures whether the changeover time drops and shows steps that are taking longer again.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases