Skip to content
Procurement & supply chainMachinery & Plant EngineeringMetal & MachiningTool & Mold MakingConveying & Intralogistics+3

Raw material demand including offcut

demi calculates demand per material and size from orders and drawings, with saw kerf, allowances and usable offcuts.

Today

BOMs list finished dimensions. Saw kerf, facing allowance, the remnant at the end of each bar and forming allowance are added with a calculator or estimated from experience. Then two bars are missing halfway through the order, or offcuts pile up in the store that nobody can assign any more.

An example

Rabenhammer Präzisionsteile has 400 shafts in 42CrMo4 to make, finished size Ø 40 h6 × 312 mm. By the BOM that is about 125 meters of round bar, so 21 bars of 6 meters. demi calculates with a raw diameter of 45 mm, facing allowance, a 2 mm saw kerf and a 150 mm remnant per bar: 18 parts per bar, so 23 bars and just over 1.7 tonnes. Together with two other orders on the same size, the agent proposes 40 bars with a 3.1 inspection certificate, and purchasing places the order.
Fictional company, typical workflow.

Your data, wherever it lives

Open orders, BOMs and stock live in the ERP, finished sizes in drawings in CAD, PLM and PDFs, the rules for saw kerf and allowances in a spreadsheet in work preparation or in the sawyer's head. demi reads, understands and links all of it, with your rights. The AI calculates real demand across all orders in minutes instead of half a day, and purchasing decides what to order.

Where the data lives today

  • ERP
  • CAD & drawings
  • PLM
  • Office files
  • PDFs
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    Data sources in this case: the ERP, CAD, PLM, spreadsheets and PDFs. demi replaces nothing and links open orders, BOMs, drawings, routings, stock, offcuts and open purchase orders into one demand per material and size.

  2. 2 · PermitPermission Layer

    Prices and supplier terms are visible to purchasing and controlling; production sees demand and raw sizes. Nothing is ordered before an authorized buyer approves it; only then does demi write the purchase requisition to the ERP, and that is recorded.

  3. 3 · ActIntelligence Layer

    The agent derives each part's raw size from drawing and routing, adds allowances by your rules and bundles demand across all orders. Quantities are calculated exactly, with the working shown per line; the language model only explains deviations, such as a drawing and a routing that name different raw sizes.

How it runs

  1. 1

    demi reads open orders, BOMs and drawings and determines material, raw size and quantity per part.

  2. 2

    For each part the agent adds saw kerf, facing allowance, bar remnant and forming allowance by your rules.

  3. 3

    The same materials and sizes are bundled across all orders, with stock and suitable offcuts deducted.

  4. 4

    An order proposal follows in stock lengths and sheet sizes, with weight, date and certificate.

  5. 5

    Purchasing checks, adjusts and releases the order.

What changes

  • Material needs settled before the order starts

  • Fewer offcuts and less capital tied up in stock

  • Order quantities anyone can recalculate

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+96 hfreed per year

Assumptions and calculation

demi calculates demand with offcut and allowances and proposes order quantities; purchasing orders.

30 min → 18 min per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

40 demand calculations × 30 min × 40% × 1.0 (manual) × 12 months = 5,760 min = 96 h

Value per year, before demi costs

Freed per year+96 h

Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.

= Value per year, before demi costs

+$6,240

gained per year

96 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Where does demi get saw kerf, allowances and remnant lengths from?

From your rules: kerf per saw, facing allowance per diameter, remnant per bar feeder, forming allowance per sheet thickness. If they live in a spreadsheet or work instruction today, demi takes them from there. If a rule is missing, the agent asks instead of guessing.

Are offcuts in stock taken into account?

Yes, if they are recorded in the ERP or a list. The agent checks which offcut is long enough for which part and plans it in before a new order. The store confirms that the piece is really on the rack.

Does this replace our nesting or saw optimization?

No. The optimization still decides how parts are laid out on sheet or bar. demi calculates demand across all orders beforehand and uses the yield from its logs, so the order quantity is right.

Who places the material order?

Purchasing. The agent presents the order proposal with the working, stock and delivery dates; nothing is ordered before an authorized person approves it, and the approval is recorded.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases