Today
Old machines are kept alive until a breakdown forces a decision under time pressure. What the machine really costs is spread across repair orders, spare part purchases, downtime and the power bill, and nobody adds it up. The retrofit quote and the new machine are then compared on gut feeling and purchase price.
An example
Edge bander KAM 2 at Tannried Möbelwerk is 18 years old, and its control system has been discontinued. The agent shows that its downtime rose from 31 hours in 2023 to 84 hours in 2025; in 2026 a control fault stopped it for nine days because the circuit board was only available from a used-parts dealer. Over ten years, the retrofit at 148,000 euros comes out about 190,000 euros cheaper than the new machine at 465,000 euros, but only the new machine can do zero-joint edges. Management orders the retrofit and asks sales to check how often zero-joint edges are requested for HPL table tops.
Your data, wherever it lives
What an old machine really costs is spread today across fault reports and repair orders in maintenance, spare part purchases and asset values in the ERP, meter data, quotes as PDFs and discontinuation notices in e-mails. demi reads, understands and links them per machine, with your rights. The AI calculates retrofit and replacement over the full service life in hours instead of weeks, and management decides.
Where the data lives today
- Tickets
- ERP
- Machines & sensors
- PDFs
- E-mails
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: maintenance, the ERP, meters and machine data, quotes as PDFs and manufacturer letters in e-mails. demi replaces nothing and links, per machine, failures, repair hours, spare part purchases, asset value, running hours and energy use with the quotes for a retrofit and a new machine. Discontinuation notices for controls, drives or spare parts sit directly on the machine.
- 2 · PermitPermission Layer
Quotes, prices and asset values are visible to management, controlling, purchasing and plant management. Maintenance and production see the technical comparison. Deciding and ordering stay with the people authorized to do so; the proposal and all its assumptions are recorded.
- 3 · ActIntelligence Layer
The agent derives the failure trend from the fault history, rates spare part risk from discontinuations, stock and lead times and compares both quotes line by line, including what is missing, such as safety technology, training or documentation. It calculates both paths over the service life with your assumptions, deterministically and traceably; the language model only writes the decision paper. If a retrofit changes protective functions or performance, it flags the question of a substantial modification for review.
How it runs
- 1
You choose the machine, and demi gathers its faults, repairs, spare parts, running hours and energy data.
- 2
The agent shows the failure trend and which parts are discontinued or have long lead times.
- 3
The retrofit quote and the new machine are compared line by line, with gaps in scope flagged.
- 4
The agent calculates both paths over the service life, with downtime cost, energy, maintenance and your assumptions.
- 5
Management receives a decision paper, every figure with its source, and decides.
What changes
Investment decisions before the breakdown, not after it
Retrofit and replacement on the same calculation basis
Spare part risks visible across the whole machine park
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+115 hfreed per year
Assumptions and calculation
demi gathers failures, spare parts, energy and quotes and calculates both paths; you decide.
16 h → 11.2 h per case
How we calculate
2 investment proposals × 16 h × 30% × 1.0 (manual) × 12 months = 115 h
Value per year, before demi costs
Freed per year+115 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$7,475
gained per year
115 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
What assumptions does demi use to compare retrofit and replacement?
Yours: service life, interest rate, cost of one hour of downtime, energy price and expected utilization. Every assumption is shown openly in the paper and can be changed, and the calculation reruns at once. Every figure points to the order, invoice, meter or quote line it comes from.
Does demi notice when spare parts or controls are discontinued?
Yes, if the information is somewhere in your company: discontinuation letters in e-mails or PDFs, supplier lists and purchase history. The agent matches them with the machine's parts list and stock and shows which parts are critical and how long the last repair without a new part took.
Does the machine need a new CE marking after a retrofit?
It may. If the conversion is a substantial modification, whoever is responsible for it, your company or the retrofitter, legally counts as the manufacturer, and the machine needs a new conformity assessment. The agent flags the quote lines that change protective functions or performance for review; your machine safety experts make the assessment.
Can demi assess the whole machine park at once?
Yes. The agent ranks every machine by failure trend, spare part risk and importance for production and shows where a decision falls due in the coming years. That way you can plan the investment budget before the next machine breaks down.
