Today
Many tenders for routine cleaning arrive without a usable room schedule, only with old floor plans as scans or with no plans at all. So the site manager walks the building, notes use, floor covering and fittings room by room and measures what the plan does not show. Then someone spends a day typing notes and areas into a spreadsheet before costing can work out a first price. A wrongly recorded floor covering or a forgotten washroom then stays in the price for the whole contract term.
An example
Blank & Kamp is to bid for routine cleaning of a vocational college in Essen; the tender contains only scanned floor plans from 1998 and no room schedule. The site manager films the walkthrough in just under two hours, speaking room numbers and observations. The agent creates 214 rooms in nine room types, recognizes six floor coverings and counts 96 WCs, 41 urinals and 132 washbasins. It flags 11 rooms whose use does not match the plan, including two classrooms merged into a workshop with an industrial floor, and 18 locked rooms without footage. The site manager clears them up during a second visit and releases the room schedule, and costing prices it the same day.
Your data, wherever it lives
Today the basis for a room schedule sits in many places: old floor plans as scans or PDFs in the tender documents, CAD plans at the customer, walkthrough notes on paper or on a phone, and your performance rates in the ERP. demi reads, understands and links them with the walkthrough video, room by room and with your access rights. The AI prefills the room schedule on the day of the walkthrough, work that takes a day of typing today, and the site manager checks and releases it.
Where the data lives today
- Photos, video & audio
- Scans & paper
- CAD & drawings
- PDFs
- Office files
- ERP
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: the walkthrough video with its spoken commentary, photos, floor plans as CAD file, PDF or scan, the tender documents and your ERP with performance rates and room types. demi replaces nothing and links every video sequence to the room in the floor plan where it was filmed. Each room then sits in one record with number, area, use, floor covering, fittings and the image that shows them.
- 2 · PermitPermission Layer
Only the team working on the tender sees video and photos from the customer's building. Only costing sees performance rates and prices. The room schedule goes into costing only after the site manager releases it; the release is recorded.
- 3 · ActIntelligence Layer
The agent recognizes room type, floor covering, fittings and sanitary fixtures in the video and evaluates the spoken commentary, such as “Room 2.14, carpet, heavy soiling at the entrance” or “locked”. It takes areas from the floor plan, never from the video; where plan and video disagree, it flags the room with both pieces of evidence. The language model only describes what can be seen and heard; areas come from the plan, quantities from the count per room.
How it runs
- 1
The site manager films the walkthrough on a phone and speaks room numbers and observations.
- 2
The agent assigns each sequence to a room in the floor plan, even when the plan is only an old scan.
- 3
It recognizes room type, floor covering, fittings and sanitary fixtures and takes the area from the plan.
- 4
Rooms without footage and differences between plan and video are flagged, each with its image.
- 5
The site manager checks the flagged rooms and releases the room schedule for costing.
What changes
The room schedule is ready on the day of the walkthrough, not a week later
Every entry is backed by an image from the walkthrough
Fewer errors in floor coverings and sanitary fixtures in the price
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+173 hfreed per year
Assumptions and calculation
demi prefills the room schedule from video, commentary and floor plan; the site manager checks and releases.
6 h → 4.2 h per case
How we calculate
8 site walkthroughs × 6 h × 30% × 1.0 (manual) × 12 months = 173 h
Value per year, before demi costs
Freed per year+173 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$11,245
gained per year
173 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Is a phone video enough, or do we need a special camera?
A current phone is enough. What matters is walking steadily, a short pan over floor and fittings in every room and the room number spoken at the door. The site manager can take photos of details in between, such as a floor covering or a glass surface; the agent assigns them to the room.
What if there is no usable floor plan?
Then the agent builds the room schedule from video and commentary and leaves the areas open, clearly flagged. If there is a scanned or photographed plan, it reads room numbers and stated areas from it or calculates them from the scale. The site manager adds measured areas, and the room schedule shows where every area comes from.
What happens to people in the video?
Ideally the site manager films when the building is not in use. demi blurs faces in the stored video, and only the team working on the tender sees it. It is deleted after the period you set.
Does this also work for building services and maintenance contracts?
Yes. On a walkthrough for building services, the agent records the equipment per room instead of floor coverings, such as air handling units, radiators, smoke detectors or luminaires, as the basis for a maintenance bid. You decide which features count per room.
