Today
In many aerospace, medical device and automotive supply plants, every lot travels with a paper traveler: stamped and signed operation by operation, with quantities, deviations and rework. After shipment it goes into an archive box and stays there for ten years or more. When a customer reports a finding and asks which lots went through the same heat treatment and who did the inspection, quality searches boxes for days, and the production history has never been analyzed.
An example
At Rennhardt Aerospace, a customer reports a finding on an AB bracket in Ti6Al4V, Rev C, and asks which lots from 2019 to 2021 went through the same heat treatment batch and who stamped the penetrant inspection. The agent has read the 4,800 travelers from those years and answers in an hour instead of a week: 14 lots, two of them with a concession for a reworked bore, the penetrant inspection stamped by three inspectors, all qualified on that day. The traveler for lot 2020-117 is missing, and it shows that as a gap. The quality manager checks the evidence and sends the customer the answer.
Your data, wherever it lives
Travelers sit today on paper in archive boxes, the newer ones as scans and PDFs on the drive, production orders in the ERP, confirmations in the MES, non-conformance reports in the QM system and material certificates as PDFs. demi reads, understands and links them per lot, with your rights. The AI then answers a question about a lot in minutes instead of days in the archive, and quality decides what goes to the customer.
Where the data lives today
- Scans & paper
- Folders & drives
- PDFs
- ERP
- MES
- QM system
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from the paper archive, the ERP, MES, QM system and material certificates. demi replaces nothing and turns every traveler into a record per lot: operation, machine, stamp number, date, good and scrap quantity, non-conformance and concession number. Each lot is linked with its production order, material batch, certificate, non-conformance report and delivery, and the original hangs as an image on every entry.
- 2 · PermitPermission Layer
Travelers and analyses are visible to quality and production management; which customer and order data someone sees follows their rights in the ERP. The stamp register and qualifications are visible only to those who maintain them today. Nothing goes into the QM system or to the customer without release by quality, and every correction of a value read is logged with person and reason.
- 3 · ActIntelligence Layer
The agent reads stamp impressions, initials, signatures, dates and handwritten notes, even on soiled or creased cards, and flags uncertain entries for confirmation. It checks every traveler against the routing and every stamp against the stamp register: did it belong to a qualified person on that day? demi calculates scrap rates, lead times and clusters of deviations from the confirmed data; the language model only describes what stands out.
How it runs
- 1
Travelers from archive boxes and current production are scanned in batches, with every attached sheet.
- 2
The agent reads each operation with stamp, date, quantity and note and assigns the traveler to its lot and production order.
- 3
It checks every traveler against the routing and every stamp against the stamp register and shows missing or uncertain entries.
- 4
Each lot is then linked with material batch, certificate, non-conformance report and delivery and can be found in seconds.
- 5
Quality confirms gaps and findings and releases answers to customers and auditors.
What changes
Every lot traceable in seconds, across years
Customer queries and audits without searching the archive
Scrap and deviations analysable across all lots
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+192 hfreed per year
Assumptions and calculation
demi reads and checks each traveler and makes the lot findable; you confirm the gaps.
8 min → 4.8 min per case
How we calculate
300 travelers × 8 min × 40% × 1.0 (manual) × 12 months = 11,520 min = 192 h
Value per year, before demi costs
Freed per year+192 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$12,480
gained per year
192 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Can demi read stamps and signatures on old travelers?
Yes: stamp numbers, initials, dates, quantities and handwritten notes, even on soiled, creased or faded cards. Every value read shows the image snippet it comes from. If a stamp is only half legible, the agent asks for confirmation instead of guessing.
How does demi know whether a traveler is complete?
From the routing in the ERP: it defines which operations, inspections and special processes a lot must pass. The agent compares every traveler with it and shows missing stamps, operations without a date and quantities that do not add up from one operation to the next.
What does the analysis add beyond traceability?
Once thousands of travelers are data, you see patterns: scrap per operation and machine, rework after tool or material changes, lead times per part family. Quality decides which action follows.
Do we have to go paperless for this?
No. Anyone who prefers to stamp on paper at the machine can carry on; travelers are scanned once the lot is closed. demi passes the confirmed data to your ERP, MES or QM system, and the paper original remains the record you keep.
