Pre-check grid and water connection requests

Incomplete requests stand out straight away, and the first reply is ready as a draft.

Today

Utilities receive more and more connection requests for solar systems, heat pumps, charging points and new buildings. Many are incomplete and wait weeks for a first answer. Network planners spend their time chasing paperwork instead of engineering.

An example

The grid operator of a district town receives a request for a 30 kW solar system without a single-line diagram. The agent requests the diagram, finds the feeder at the local substation with its 630 kVA transformer and marks the case as standard once the file is complete.
Fictional company, typical workflow.

Your data, wherever it lives

Today connection requests arrive via the portal and by e-mail, with site plans, circuit diagrams and datasheets as PDFs or scans; network points and assets sit in the GIS database, customers and meters in the ERP. demi reads, understands and links them per request and network point, with your rights. The AI checks each request against your connection rules in minutes, finds the network point and drafts the document request or the reply, instead of weeks of waiting, and network planning decides on the connection.

Where the data lives today

  • Web & portals
  • E-mails
  • PDFs
  • Scans & paper
  • Databases
  • ERP
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    The case needs data from the request portal, inbox, GIS and ERP. demi replaces nothing and links each request to its address, network point, asset data and your technical connection rules. demi writes back only after approval.

  2. 2 · PermitPermission Layer

    Network data stays with network planning; applicants see only their own case. An engineer from network planning approves every technical commitment, and the approval is recorded.

  3. 3 · ActIntelligence Layer

    The agent checks the documents against your fixed connection rules, finds the network point and flags simple cases for fast handling. If something is missing, it drafts the request with an exact list and a reference to the rule that requires it.

How it runs

  1. 1

    A request comes in via portal or email.

  2. 2

    The agent checks the documents against the connection rules.

  3. 3

    Missing documents are requested from the applicant.

  4. 4

    It finds the network point and marks the case as standard or complex.

  5. 5

    Network planning reviews and approves the reply.

What changes

  • Faster first answers

  • Fewer incomplete cases

  • Engineers focus on the hard cases

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+270 hfreed per year

Assumptions and calculation

demi checks completeness and grid data and drafts the reply; you decide on the connection.

30 min → 21 min per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

150 connection requests × 30 min × 30% × 1.0 (manual) × 12 months = 16,200 min = 270 h

Value per year, before demi costs

Freed per year+270 h

Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.

= Value per year, before demi costs

+$17,550

gained per year

270 h ÷ 1,760 h per role = 0.2 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Does it work with our network information system?

The data layer is designed for network data such as lines, substations and feeders from the GIS; how the data from the GIS gets to demi, we clarify in a conversation. The system stays as it is. Network planning decides which data the agent may see.

Which cases can be pre-approved?

You decide with your own rules, for example small generation units at a network point with enough capacity. The agent pre-sorts those cases. A qualified engineer always gives the technical approval.

How are applicants kept informed?

The agent drafts the receipt, the request for missing documents and status updates. They go out through the portal or by email. Applicants only see their own case.

Does this also work for water and heat connections?

Yes. The logic is the same: check documents against rules, find the network point, request what is missing. Only the rules and the network data differ.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases