Today
Customer specifications run to hundreds of pages and hide clauses with liability or cost impact. Nobody has time to read every requirement against their own quote. Gaps show up only once the machine is being built.
An example
A specification for an assembly line at Ebert & Lorenz Maschinenbau runs to 240 pages and 612 requirements. The agent finds 23 the quote does not cover, including a penalty for late delivery, performance level PL e instead of the quoted PL d and a 24-month spare-parts obligation.
Your data, wherever it lives
The customer's specification arrives today as a PDF or Word file of hundreds of pages, the quote sits in the DMS, the order confirmation in the ERP, the parts in the PLM, and change requests in the project mailbox. demi reads, understands and links them per requirement, with your rights. In minutes the AI checks every requirement, not just a sample, each with its page, before the contract is signed, and the project manager decides with legal which deviations to accept.
Where the data lives today
- PDFs
- Office files
- DMS & archive
- ERP
- PLM
- E-mails
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: the DMS, ERP, PLM and e-mail. demi replaces nothing and joins customer specifications, quotes, order confirmations and change requests. Each requirement becomes its own record, linked to the project, the quote line and the part in the PLM.
- 2 · PermitPermission Layer
Project and sales see the matrix, and legal reviews flagged clauses. The project manager approves accepted deviations, and they are recorded with name and date.
- 3 · ActIntelligence Layer
The agent builds a compliance matrix (met, partly met, not met) with a page reference for every requirement. It compares quote and order line by line by fixed rules and keeps track of agreed changes and extras.
How it runs
- 1
Upload the specification and quote; clarify the data sources: DMS and ERP.
- 2
The agent splits the specification into single requirements.
- 3
Each requirement is rated against quote and scope of supply.
- 4
Risky clauses go to the project manager and legal.
- 5
The matrix stays current as revisions and changes come in.
What changes
Risky clauses found before signing
Changes and extras documented and billable
Fewer surprises during execution
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+432 hfreed per year
Assumptions and calculation
demi splits the specification and checks each requirement against quote and product data; you settle the rest.
3 h → 1.8 h per case
How we calculate
30 specifications × 3 h × 40% × 1.0 (manual) × 12 months = 432 h
Value per year, before demi costs
Freed per year+432 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$28,080
gained per year
432 h ÷ 1,760 h per role = 0.2 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
How does it cope with very long specifications?
The agent reads the whole document, even several hundred pages, and splits it into single requirements. Every row in the matrix names the page, so you can check each rating in the original.
Can it compare several revisions of a specification?
Yes. When a new revision arrives, the agent shows which requirements are new, changed or removed and re-rates only those. The rating of the old revision stays traceable.
Does it track changes agreed by phone or email?
It reads the project mailbox and links change requests to the matching requirement. It only knows about phone calls if someone files a note or minutes.
Does the matrix replace a review by our legal team?
No. The agent finds and flags clauses with liability or cost impact. The legal assessment and the decision on what you accept stay with your experts.
