Today
Customers often draw tighter than needed: Ra 0.8 along the whole shaft, ±0.01 mm on every dimension, hardened end to end. The part gets expensive, and you lose the order on price, although your production know-how could deliver a cheaper part with the same function. Nobody has the time to go through every drawing like that.
An example
A gearbox maker sends Rabenhammer Präzisionsteile the drawing of a shaft W Ø 40 h6 in 42CrMo4, 2,000 pieces a year. It asks for Ra 0.8 and HRC 58 along the whole length and ±0.01 mm on all lengths. The agent flags three cost drivers: only the two bearing seats need Ra 0.8 and hardness for fit and function, the lengths can be made to ISO 2768-m, and hardening the full length costs straightening and grinding time. From the actual times of 37 similar shafts in the MES, it computes that induction hardening and grinding only at the bearing seats cut production time by a third and the unit price from €18.40 to €13.90. The customer's designer accepts the bearing seats and tolerances and keeps the hardness; Rabenhammer delivers at €15.20 and wins the order.
Your data, wherever it lives
Customer drawings arrive as PDF or CAD files by e-mail today, similar parts and routings sit in the PLM and ERP, actual times and scrap in the MES. demi reads, understands and links them, with your rights. The AI flags within minutes the cost drivers that only experienced people in production used to spot, and you decide which proposal goes to the customer.
Where the data lives today
- CAD & drawings
- PDFs
- PLM
- ERP
- MES
- E-mails
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: CAD and PDF drawings, the PLM, the ERP, the MES and e-mail. demi replaces nothing and links the customer drawing with similar parts you have made, their routings, the actual times and scrap rates from production and your machine hour rates. So demi sees what a tolerance, a surface or a hardness spec really costs in your shop.
- 2 · PermitPermission Layer
Hour rates, costing and margins are visible only to costing and sales management; the customer receives only the marked drawing, the proposals and the prices. Other customers' drawings serve only as an internal comparison and never appear in what goes to the customer. An authorized person releases everything that leaves the house.
- 3 · ActIntelligence Layer
The agent reads dimensions, tolerances, fits, surfaces, hardness and material specs from the drawing and identifies the functional surfaces. It flags every spec that means an extra operation, an expensive machine or more scrap in your shop and uses actual times and hour rates to compute what a relaxed spec saves. The customer's designer judges the function; the agent only proposes.
How it runs
- 1
The inquiry arrives with a drawing as PDF or CAD file, by e-mail or through the customer portal.
- 2
The agent reads dimensions, tolerances, surfaces and hardness specs and identifies the functional surfaces.
- 3
It flags the cost drivers and backs each one with actual times and scrap of similar parts from your production.
- 4
For every alternative it recomputes the price and drafts the marked drawing as a proposal for the customer.
- 5
Costing and sales check it, you release it, and the quote goes out with both prices.
What changes
Orders won on production know-how instead of discounts
The customer gets a backed proposal for a cheaper part
Every drawing checked, not just the big inquiries
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+144 hfreed per year
Assumptions and calculation
demi flags cost drivers in the drawing and prices alternatives with your actual times; you decide.
40 min → 28 min per case
How we calculate
60 customer drawings × 40 min × 30% × 1.0 (manual) × 12 months = 8,640 min = 144 h
Value per year, before demi costs
Freed per year+144 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$9,360
gained per year
144 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Can demi also read scanned and older customer drawings?
Yes. demi reads PDF drawings, scans and common CAD formats, including the title blocks and standards of different customers. Whatever it cannot read with certainty, such as a smudged tolerance, the agent marks as open instead of guessing.
How does demi know what a tight tolerance costs in our shop?
From your production: routings, actual times and scrap of similar parts in the MES and your machine hour rates in the ERP. The agent shows which parts it compared and how time and scrap change with the tolerance. If data is missing, it does not compute but says so.
Does demi change the customer's drawing?
No. The agent drafts a marked copy with proposals and reasons. Whether a tolerance, surface or hardness can be relaxed is decided by the customer's designer, and production works only to the released drawing.
How do the proposals reach the customer?
As a second offer next to the price for the drawing as it stands: the marked drawing, a short reason per point and the price for each variant. You release what goes out, and the customer never sees hour rates or margins.
