Shop-floor layouts grow machine by machine, wherever there happened to be space. Forklifts cross the hall all day, but nobody can say how much material really flows where. Every conversion idea means weeks of spreadsheets, and in the end gut feeling decides.
An example
At Ebert & Lorenz Maschinenbau, the agent shows from twelve months of confirmations that the frames of the HP 250 kN hydraulic press cross hall 2 after welding and blasting to the machining center BZ 3 and then come back to the paint shop next to the welding area. In variant B, BZ 3 moves next to the paint shop, and forklift travel for frames drops by 42 %. The new spot needs a foundation and a 400 V connection; plant management schedules variant B for the August shutdown.
Your data, wherever it lives
The answer is in data you already have: routings and confirmations in the ERP and MES, the floor plan in CAD or as a PDF, foundation and utility plans in old folders, load carriers and forklift lists in spreadsheets. demi reads, understands and links them, with your rights. The AI computes material flow and layout variants in hours instead of weeks, and plant management decides on the conversion.
Where the data lives today
- CAD & drawings
- ERP
- MES
- PDFs
- Office files
- Folders & drives
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: the ERP, MES, CAD and spreadsheets. demi replaces nothing and links routings, production orders and confirmations with the floor plan, utility and foundation plans, crane runways and load carriers. Every move is tied to part, quantity, origin and destination.
- 2 · PermitPermission Layer
Layout variants and conversion plans are visible to plant management, production planning and maintenance. demi does not evaluate who booked what: it works with quantities, times and work centers. Plant management decides on the conversion, and every variant stays on record with its assumptions.
- 3 · ActIntelligence Layer
From routings and bookings, the agent computes how much material moves how often between which work centers, weighted by weight and load carrier. It measures the routes on the floor plan and, for each variant, computes travel distance, floor space and affected connections; the language model only explains why one variant comes out ahead.
How it runs
- 1
demi reads routings, production orders and confirmations from the last twelve months.
- 2
The agent computes how much material moves how often between which machines.
- 3
It reads the floor plan, utility connections, foundations, crane runways and escape routes from CAD and PDF.
- 4
For the planners' ideas and its own proposals, it computes distances, floor space and conversion effort and sets the variants side by side.
- 5
Production planning and plant management compare the variants and decide on the conversion.
What changes
Layout decisions on numbers, not gut feeling
Shorter routes and less forklift traffic
Conversion effort known before the decision
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+115 hfreed per year
Assumptions and calculation
demi computes the material flow and compares layout variants; plant management decides.
12 h → 7.2 h per case
How we calculate
2 layout variants × 12 h × 40% × 1.0 (manual) × 12 months = 115 h
Value per year, before demi costs
Freed per year+115 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$7,475
gained per year
115 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Where does the material flow come from if we don't book transports?
From routings and confirmations: each operation ends at one work center and the next starts at another, with a move in between. With quantity and load carrier, that gives the flow. If there are forklift terminals or warehouse bookings, the agent uses them as a cross-check.
Which floor plans can demi read?
CAD layouts, PDFs and even scanned old plans. The agent reads machine positions, columns, crane runways, gates and utility connections; where a plan is unclear, it asks. demi does not change the plan itself; the variants are built alongside it.
Does demi also show what a conversion costs?
demi shows the effort per variant: which machines move, which foundations and connections are needed and how many days a machine stands still. If costs of earlier conversions are on record, the agent uses them. Plant management decides whether and when to invest.
Does it evaluate who works how fast?
No. The material flow counts quantities, times and work centers; names play no part. The works council can review how the analysis is built beforehand.