Skip to content
Quality, standards & complianceFood & Beverage

Check HACCP records for gaps

Gaps in records and cleaning logs show up early, not only in the audit.

Today

HACCP records, cleaning logs and deviations sit on paper and in spreadsheets. Whether everything is complete often becomes clear only during the audit. Then people search and fill in entries under time pressure.

An example

Two weeks before the IFS Food audit, the agent checks the records of the SC sauce line at Tarvina. It finds two missing temperature checks at the 0–4 °C chilling point and one cleaning log without a signature. It maps the remaining evidence to the chapters of the standard.
Fictional company, typical workflow.

Your data, wherever it lives

Your HACCP records and cleaning logs sit today on paper sheets at the line and in spreadsheets, temperatures in data loggers and the MES, deviations in the quality system and the HACCP plan with every limit in the DMS. demi reads, understands and links them per control point, line and shift, with your rights, photographed paper sheets included. The AI finds missing entries and exceeded limits every day instead of during the audit, and the quality lead decides on every corrective action.

Where the data lives today

  • Scans & paper
  • Office files
  • MES
  • Machines & sensors
  • QM system
  • DMS & archive
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    The case needs data from the MES, QMS, DMS and spreadsheets. demi replaces nothing and links critical control points, monitoring records, cleaning logs, deviations and the audit standard's requirements; every control point knows its limit and check frequency. demi proposes corrective actions and only writes back after approval.

  2. 2 · PermitPermission Layer

    Quality and shift leads see the records for their areas. Quality assigns corrective actions and confirms their completion, recorded with person and time.

  3. 3 · ActIntelligence Layer

    The agent checks every control point by fixed rules against its documented limit and frequency and finds missing entries and breaches, each with its record. Before an audit, it maps the evidence to the chapters of the standard and shows what is still missing.

How it runs

  1. 1

    The case needs records from the MES and spreadsheets, or as a photo of the paper log.

  2. 2

    The agent assigns each entry to control point, line and shift.

  3. 3

    It checks completeness, frequency and limits.

  4. 4

    Gaps and deviations become corrective actions with an owner and a deadline.

  5. 5

    Before the audit, it produces the gap analysis per chapter of the standard.

What changes

  • Records ready for audit at any time

  • Gaps found early, not during the audit

  • Corrective actions tracked to completion

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+72 hfreed per year

Assumptions and calculation

demi checks records and cleaning logs for gaps and tracks corrective actions; you act.

45 min → 27 min per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

20 HACCP reviews × 45 min × 40% × 1.0 (manual) × 12 months = 4,320 min = 72 h

Value per year, before demi costs

Freed per year+72 h

Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.

= Value per year, before demi costs

+$4,680

gained per year

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Can demi read paper records?

Yes. A photo or scan of the log is enough, and the agent reads values, times and signatures. It marks illegible entries for review instead of guessing.

Which audit standards are supported?

You load the requirements of the standard you are audited against, such as IFS Food or BRCGS, plus your own HACCP plan. The agent then maps the evidence to exactly those chapters.

How are corrective actions tracked?

Every deviation becomes an action with an owner, a deadline and proof of completion. The agent reminds before the deadline and flags any attempt to close an action without proof. The quality manager sees the status of all actions.

Does anything change for the shift team?

Hardly. The shift documents as before, in the MES, in a spreadsheet or on paper. demi checks the entries and only speaks up when something is missing or outside the limit.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases