Skip to content
Quality, standards & complianceMachinery & Plant EngineeringConstruction & Building ServicesEnergy & Utilities

Check refrigerants and SF6 against F-gas bans

For every product and installation you see the refrigerant or SF6, the charge, the CO₂ equivalent and the date from which a ban applies.

Today

The new F-gas regulation bans refrigerants with a high global warming potential and SF6 in switchgear step by step. Often nobody knows which variants are affected: cooling units and chillers sit as bought-in parts in the bills of materials, and refrigerants and charges sit in supplier data sheets. If a ban only shows up when the supplier discontinues a unit, engineering has to redesign under time pressure.

An example

Ebert & Lorenz Maschinenbau has all 64 active variants of its presses, assembly cells and special machines checked. The agent finds 41 variants whose enclosure cooling unit contains R134a and 12 special machines whose laser-source chiller holds R410A amounting to more than five tonnes of CO₂ equivalent. For three of these twelve, the operating manual lacks the charge in CO₂ equivalent and the global warming potential. Because the supplier is discontinuing the chiller under the new bans, the agent proposes the successor model running on propane and flags that the risk assessment must be redone for the flammable refrigerant. The head of engineering releases the switch.
Fictional company, typical workflow.

Your data, wherever it lives

Which units hold refrigerant or SF6 sits today in bills of materials in the PLM, in bought-in parts and supplier items in the ERP, in PDF data sheets in the DMS and in refrigerant lists that quality keeps in spreadsheets. demi reads, understands and links it all per variant, with your rights. The AI converts charges into CO₂ equivalent and puts every ban with its date next to them, in minutes instead of days, and engineering decides what to switch.

Where the data lives today

  • PLM
  • ERP
  • PDFs
  • Office files
  • DMS & archive
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    Data sources in this case: PLM, ERP, DMS and spreadsheets. demi replaces nothing and links each variant's bill of materials with its cooling units, chillers, heat pumps or switchgear panels, with refrigerant or insulating gas, charge and global warming potential from the supplier data sheets, and with nameplate and operating manual. demi writes back only after approval.

  2. 2 · PermitPermission Layer

    Engineering, quality, purchasing and sales see the overview. The responsible person in engineering decides which variant is switched or phased out, quality releases changed nameplates and manuals, and every approval is recorded.

  3. 3 · ActIntelligence Layer

    The agent finds every component with refrigerant or fluorinated insulating gas, takes gas, charge and global warming potential unchanged from the data sheet and calculates the CO₂ equivalent as charge times global warming potential. It assigns each variant to the bans and dates that apply to its type of equipment, with the reference. If a value is missing, it drafts the request to the supplier instead of estimating it.

How it runs

  1. 1

    demi reads bills of materials, bought-in parts and supplier data sheets for every active variant.

  2. 2

    The agent finds every cooling unit, chiller and switchgear panel with fluorinated gas and copies gas, charge and global warming potential from the data sheet.

  3. 3

    It calculates the CO₂ equivalent and assigns each variant to the ban and date that hit it.

  4. 4

    It checks nameplate and operating manual for the mandatory information and lists what is missing.

  5. 5

    Engineering decides on switching or phasing out, and quality releases the changed documents.

What changes

  • Every affected variant known before a ban applies

  • Switches planned instead of rushed

  • Nameplates and manuals with all mandatory information

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+135 hfreed per year

Assumptions and calculation

demi finds F-gases per variant with CO₂ equivalent and ban date; you decide on the switch.

90 min → 63 min per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

25 product variants × 90 min × 30% × 1.0 (manual) × 12 months = 8,100 min = 135 h

Value per year, before demi costs

Freed per year+135 h

Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.

= Value per year, before demi costs

+$8,775

gained per year

135 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

How does demi know the refrigerant and charge of a bought-in part?

From your suppliers' data sheets, nameplate photos and declarations of conformity in the DMS, the ERP or e-mails. The agent copies gas, charge and global warming potential unchanged and links the source. If a value is missing, it drafts the request to the supplier instead of estimating one.

Does this also cover switchgear with SF6?

Yes. For switchgear, the agent reads voltage level, short-circuit current and insulating gas per type and assigns the dates of the regulation: since January 2026, new medium-voltage switchgear up to 24 kV that relies on fluorinated gases may no longer be put into operation in the EU, and higher voltage levels follow up to 2032. For each unit you see which date hits it and which exemption needs checking.

What about units already running at customers' sites?

Existing equipment may keep running, but servicing and refilling follow their own rules, and above certain quantities the operator needs leak checks. Using the serial numbers, the agent shows which delivered machines are affected and drafts the notice to the customer. Service releases what goes out.

Who decides which refrigerant to switch to?

Engineering. The agent shows alternatives from your suppliers' catalogs with global warming potential, safety class and whether a later ban hits them. Whether a flammable refrigerant such as propane fits the machine is decided by engineering on the basis of its risk assessment.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases