Skip to content
Service & spare partsConveying & IntralogisticsConstruction & Building ServicesMining & Raw MaterialsWaste & Recycling+1

Wire rope discard check from photos

The inspector films the rope; AI marks visible broken wires per reference length and files the finding with its history in the crane file.

Today

Whether a wire rope must be discarded rests today on one inspector's eye. Broken wires are counted by hand, and the logbook says “rope OK” or a number without a position. Rope certificate, operating hours and earlier findings are never side by side, so nobody sees the breaks increasing until the crane stops unplanned.

An example

A service technician from Conveyra Fördertechnik inspects a 10 t BK bridge crane at a customer's plant, films the hoist rope as it runs slowly and photographs the section at the equalizing sheave, where the rope barely moves. The agent marks four visible broken wires over a length of 6d, all near the equalizing sheave, and shows from the crane file that there were two at the same spot three months ago. Under ISO 4309 it proposes a shorter inspection interval and a rope change at the next planned shutdown. The technician checks the spot on the rope, confirms and signs.
Fictional company, typical workflow.

Your data, wherever it lives

Rope findings live today on inspection sheets and in the crane logbook, photos on the inspectors' phones, rope certificates as PDFs in the DMS, operating hours in the crane controller and earlier findings in the maintenance system. demi reads these sources, understands which finding belongs to which rope and position, and links everything into a history per crane, with your rights. AI counts visible broken wires in seconds and shows the trend; the competent person decides whether the rope is discarded.

Where the data lives today

  • Scans & paper
  • Photos, video & audio
  • PDFs
  • DMS & archive
  • Machines & sensors
  • Tickets
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    The case needs data from the maintenance system, field service software, crane logbook and DMS. demi replaces nothing and links each crane's rope to its certificate, installation date, reference diameter, operating hours from the controller and every earlier finding with its photos. Each new finding hangs on the same position along the rope, so the history becomes visible.

  2. 2 · PermitPermission Layer

    Findings are signed only by the competent person who inspected the rope. Operators see the findings for their own cranes, the service team those of its customers. Every rating and every change is recorded in the logbook with name and date.

  3. 3 · ActIntelligence Layer

    The agent marks visible broken wires, deformation and corrosion on photos and videos, counts the breaks per reference length of 6d and 30d and proposes the rating under ISO 4309. Diameter and limits come from measurement and rope certificate, not from the picture. What it cannot recognize with certainty it marks as unclear; the discard decision is the inspector's.

How it runs

  1. 1

    The inspector photographs or films the rope with a phone while it runs slowly.

  2. 2

    The agent marks visible broken wires, deformation and corrosion and counts the breaks per reference length.

  3. 3

    Rope certificate, reference diameter, operating hours and earlier findings at the same position sit alongside.

  4. 4

    The agent proposes the rating under ISO 4309 and shows how much the damage has grown since the last inspection.

  5. 5

    The inspector checks the marked spots on the rope, decides and signs; the finding goes into the logbook and any rope change into planning as an order.

What changes

  • Every broken wire documented with photo and position

  • Rope changes planned before the crane stops unplanned

  • Consistent ratings across inspectors and sites

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+108 hfreed per year

Assumptions and calculation

demi counts visible broken wires and adds rope certificate and history; you decide at the rope.

30 min → 21 min per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

60 rope inspections × 30 min × 30% × 1.0 (manual) × 12 months = 6,480 min = 108 h

Value per year, before demi costs

Freed per year+108 h

Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.

= Value per year, before demi costs

+$7,020

gained per year

108 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Does the photo replace inspecting the rope itself?

No. A photo shows only what is visible on the outside. Internal broken wires and corrosion inside the rope are found by magnetic rope testing or by looking into the opened rope, and the inspector measures the diameter with a calliper. The discard decision always rests with the competent person.

Which rules does the agent use to rate a wire rope?

ISO 4309 and the requirements you store, such as the rope maker's data or stricter in-house rules. From the rope construction on the certificate it derives the permitted number of broken wires and shows which limit applies. You can trace every rating back to the marked spot in the photo.

How does demi see whether the damage is increasing?

Every finding hangs on a position along the rope, for example at the equalizing sheave or on the drum. So the broken wires of every inspection sit side by side, with operating hours from the controller where available. If the breaks grow quickly, the agent proposes a shorter inspection interval or a rope change at the next shutdown.

Do our inspectors need a special camera?

No. A current phone is enough for most ropes; for thin ropes or poor light a lamp or a macro lens helps. If a picture is too blurred to count wires, the agent says so at once and asks for a new shot.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases