Today
Tens of thousands of drawings and models depend on software whose license is running out or that nobody can operate any more. Conversion quietly loses tolerances, special characters or whole faces, and nobody has time to compare every file by hand. So the old system stays alive at great cost, or the files are converted and everyone hopes for the best.
An example
Rennhardt Aerospace keeps 38,000 ME10 drawings and 6,200 CATIA V4 models on an old drive, and the license ends at year end. demi converts them to STEP and PDF and checks every file: 412 land on the review list, including fitting AB-2210 Rev C in Ti6Al4V, whose fit bore lost its tolerance in conversion. demi also shows 140 parts that exist only on paper but are ordered as spare parts every year; those are remodelled in 3D first.
Your data, wherever it lives
Your old drawings and models are scattered today: ME10 and CATIA V4 files on old drives, NAS boxes and hard disks from projects, early DWG versions in the PLM and scans from the paper archive. demi reads, understands and links them with parts, revisions and orders from the PLM and ERP, with your rights. The AI checks every converted file against its original in seconds, and your engineers decide on every deviation.
Where the data lives today
- CAD & drawings
- PLM
- NAS & hard disks
- Folders & drives
- Scans & paper
- ERP
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from CAD stores, the PLM, drives, NAS and the ERP. demi replaces nothing, records every file with format, version, part and revision, and keeps original, new file and check record together. demi writes back to the PLM only after approval.
- 2 · PermitPermission Layer
Drawings stay visible only to the people who may see them today; customer drawings and export-controlled parts stay within the authorized group. Only after engineering has assessed a deviation does the new file replace the old one in the PLM, and the approval is recorded.
- 3 · ActIntelligence Layer
The agent recognizes formats by file content, not by extension, runs the conversion in batches and compares computed values: volume, surface area, center of gravity and bounding box for models; image, dimension texts and title block for drawings. The language model reads title blocks on scans and explains deviations; the numbers come from the geometry.
How it runs
- 1
demi records every CAD file on drives, NAS and in the PLM by format, version, age and use.
- 2
You set the target per format, such as STEP for models and DXF and PDF for drawings, with tolerances.
- 3
The agent converts in batches and compares volume, mass, center of gravity, dimension texts and title block before and after.
- 4
Every file with a deviation goes on engineering's review list with a before-and-after image.
- 5
After approval the new file replaces the old one in the PLM; the original stays in the archive with its check record.
What changes
Legacy data stays usable when the old software goes
Every converted file with proof of its check
Parts worth remodelling in 3D come first
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+288 hfreed per year
Assumptions and calculation
demi converts legacy CAD files and compares geometry and title block; you check only the deviations.
12 min → 7.2 min per case
How we calculate
300 CAD files × 12 min × 40% × 1.0 (manual) × 12 months = 17,280 min = 288 h
Value per year, before demi costs
Freed per year+288 h
Assumption: labor cost of $48.62 per hour in US manufacturing in June 2026 (BLS), plus workplace, IT and overhead.
= Value per year, before demi costs
+$18,720
gained per year
288 h ÷ 1,760 h per role = 0.2 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Does demi convert the CAD files itself?
demi drives the conversion: through your CAD system's batch converters or through converters we agree on together. demi handles the inventory, batches, comparison and review list. So for every file you can trace what converted it and how it was checked.
How does demi notice that something was lost in conversion?
For models demi compares volume, surface area, center of gravity and bounding box; for drawings the image, the dimension and tolerance texts and the title block. The original's values come from the old system or a second converter, the new file's values are computed from its geometry, and nothing is estimated. If a deviation exceeds the tolerance you set, the file goes on the review list.
Which old parts should we remodel in 3D first?
demi links parts that exist only as a 2D drawing or a scan with orders, spare-part demand and changes from the ERP. What is ordered, changed or requested often comes first. Engineering decides what gets remodelled.
What happens to the original files?
The originals stay unchanged in the archive, with a checksum. Every new file points to its original and its check record. So in an audit you can show at any time where a drawing came from.
