Today
Sales promises a delivery to a new country before anyone knows which marks, tests and local documents apply there. The requirements sit on authority websites and in standards; the experience from earlier approvals sits in old project folders and in e-mails with test labs. If a gap shows up only at acceptance, delivery slips by months.
An example
Ebert & Lorenz Maschinenbau is to deliver the HP-250 press to a plant in Ohio for the first time. The agent puts the roadmap together: electrical equipment to NFPA 79, control panel to UL 508A with the short-circuit current rating (SCCR) on the nameplate, and an on-site field evaluation by a recognised test lab. 41 of 58 test points can be taken over from the EN 60204-1 test report; what remains open is mainly conductor sizes in AWG, wire colours and three components without a UL listing. The roadmap needs 16 weeks, and the delivery date holds if the control panel is redesigned by the end of January. The head of quality releases it.
Your data, wherever it lives
What a target country requires sits on authority websites and in standards; what your product already proves sits in test reports in the DMS, schematics in the PLM and folders from earlier approvals, along with test-lab quotes and e-mails. demi reads, understands and links it all per product and country, with your rights. The AI builds the roadmap in hours instead of days of research, and quality decides what to apply for.
Where the data lives today
- PLM
- DMS & archive
- PDFs
- Web & portals
- E-mails
- Folders & drives
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: PLM, DMS, file share, e-mail and official sources on the web. demi replaces nothing and links each product's variants, bill of materials and schematics to existing test reports, certificates and declarations of conformity, to earlier approval projects with their lab quotes, and to the target country's requirements. demi writes back only after approval.
- 2 · PermitPermission Layer
Sales, project management and quality see the roadmap; lab quotes and costs are visible only to those who may approve them. The responsible person in quality decides which approval to apply for, and every sign-off is recorded.
- 3 · ActIntelligence Layer
The agent determines the marks, standards, tests and local documents that apply to the product in each target country, every requirement with its source and date. It checks them point by point against existing test reports, shows what can be reused and what is missing, and estimates cost and lead time from earlier projects. It plans the roadmap backwards from the delivery date.
How it runs
- 1
Sales names product, variant and target country, ideally at the enquiry stage.
- 2
The agent determines marks, standards, tests and local documents, each requirement with its source.
- 3
It checks them against existing test reports and certificates and shows what can be reused.
- 4
From earlier approvals it estimates cost and lead time and plans backwards from the delivery date.
- 5
Quality reviews the roadmap, commissions the test lab and releases the date for sales.
What changes
Delivery dates that already include the approval
Existing test reports reused instead of paid for again
One roadmap per product and country, visible to everyone involved
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+115 hfreed per year
Assumptions and calculation
demi works out approvals, tests and reusable reports per country; you decide what to apply for.
16 h → 11.2 h per case
How we calculate
2 approval roadmaps × 16 h × 30% × 1.0 (manual) × 12 months = 115 h
Value per year, before demi costs
Freed per year+115 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€7,475
gained per year
115 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
How does demi know what a target country requires?
From the sources your experts approve: authority websites, standards, guidance from test bodies and your own earlier approvals. Every requirement in the roadmap shows its source and its date. How a rule is to be interpreted is decided by your experts or your test body.
Which existing test reports can be reused for a new country?
Many countries build on the same international standards as your CE evidence, such as IEC 60204-1 for electrical equipment. The agent compares point by point what your existing report already covers and lists only the differences. Quality checks with the lab beforehand whether it accepts the report.
How reliable are cost and lead time in the approval roadmap?
They are estimates from your own projects and from the quotes test labs have sent you. For every figure you see what it is based on. If there is no experience yet for a country, the agent says so and works with the quote you obtain.
What happens when a rule in the target country changes?
The agent watches the sources you give it. When a standard or a rule changes, it shows every roadmap and every product affected, with the old and the new version. What that means for running projects is decided by quality.
