Today
Purchasing negotiates against last year's price, not against what a part should cost. Breaking a quote down into material, machining and margin takes an engineer a day, so it happens for only a few parts. Inflated prices then stay in framework agreements for years.
An example
Arnstein buys a retaining clip in PA66 GF30 for a wiring harness, 400,000 pieces a year. The supplier quotes €0.118 per piece. From the drawing and a weight of 6.2 g, demi puts material at €0.021; from a 22-second cycle in an 8-cavity mould at a machine rate of €52 per hour, production at €0.040; adding packaging, overheads and margin gives a target price of €0.082. The gap of 3.6 cents sits almost entirely in production and fits a 4-cavity mould. The buyer asks exactly that in the negotiation; across the annual volume about €14,000 is at stake.
Your data, wherever it lives
Drawings and 3D models of purchased parts live today in CAD and PLM, annual volumes, prices and order history in the ERP, supplier quotes as PDFs, hourly rates and cost models in costing spreadsheets. demi reads, understands and links them, with your rights. The AI works out a target price cost block by cost block in minutes instead of a day, and purchasing decides how to negotiate.
Where the data lives today
- CAD & drawings
- PLM
- ERP
- Office files
- PDFs
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: CAD, PLM, the ERP, spreadsheets and PDFs. demi replaces nothing and links, per purchased part, drawing and 3D model, material, weight, annual volume, price history and supplier quotes with your rates for material prices, machine hours and process times. Next to every quote sits a calculation of your own.
- 2 · PermitPermission Layer
Target prices and cost models are visible to purchasing and cost accounting; engineering sees the cost drivers of its parts. What a supplier gets to see in a negotiation is released by purchasing, and that is recorded.
- 3 · ActIntelligence Layer
The agent reads material, weight, dimensions and features from drawing and model, derives the operations and calculates material, machining, set-up, packaging, overheads and margin with fixed formulas and your rates. Every assumption is visible and can be changed. The language model only explains where and why the quote differs from the calculation.
How it runs
- 1
A supplier quote comes in, or purchasing selects parts with a high spend.
- 2
demi gathers the part's drawing, model, material, annual volume and price history.
- 3
The agent derives the operations and calculates material, machining, set-up, overheads and margin with your rates.
- 4
The target price sits next to the quote, cost block by cost block, largest gap first.
- 5
Purchasing checks and adjusts the assumptions and goes into the negotiation with specific questions.
What changes
Negotiate against real cost, not last year's price
Inflated prices visible even on small parts
Cost drivers visible while the part is still being designed
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+216 hfreed per year
Assumptions and calculation
demi works out the should-cost per cost block from drawing and your rates; purchasing negotiates.
4 h → 2.8 h per case
How we calculate
15 should-cost analyses × 4 h × 30% × 1.0 (manual) × 12 months = 216 h
Value per year, before demi costs
Freed per year+216 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€14,040
gained per year
216 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Where do machine rates and material prices come from?
From your spreadsheets, from cost accounting or from values purchasing maintains per process, machine size and region. Material prices follow the market prices you approve. Every calculation shows which rate it used.
How accurate is a should-cost?
As accurate as the assumptions behind it. The agent shows every assumption, such as cycle time, number of cavities or scrap, and how strongly it moves the price. The point is not the last cent but which cost block of a quote is conspicuously high.
Which manufacturing processes does it cover?
Processes whose cost can be derived from material, time and rates: turning, milling, grinding, stamping, bending, injection moulding, die casting and welded assemblies. You set the rules per process or take them from your own costing.
Does the supplier see our calculation?
Only what purchasing releases. Often it is enough to ask about one cost block in the negotiation, such as the number of cavities in the mould. The full calculation stays in-house.
