Today
During a factory acceptance test five people take notes, each something different. Afterwards points are missing from the punch list, spoken commitments are written down nowhere and nobody knows for sure which checklist item was really demonstrated. Then the dispute about what was agreed begins, and shipping slips.
An example
At the factory acceptance test of an assembly cell at Ebert & Lorenz Maschinenbau, four people from the customer and three from the project take part. The test lasts two days and is recorded with two cameras and a clip-on microphone. By the evening the draft is ready: 112 checklist items passed, 9 open, including a cycle time of 14.2 instead of 13.5 seconds and a missing sign at the emergency stop, each with still image and owner. Three requirements from the specification were never demonstrated and go onto the list for commissioning.
Your data, wherever it lives
Specification, acceptance plan and checklists sit as PDFs, documents and spreadsheets in the project folder, notes on paper and in phones, photos and videos on memory cards, agreements in e-mails and chats. demi reads these sources, understands which comment belongs to which checklist item and requirement, and links everything into one report, with your rights. AI writes report and punch list the same evening, and your project manager releases what goes to the customer.
Where the data lives today
- Photos, video & audio
- Phone & voice
- PDFs
- Office files
- Folders & drives
- E-mails
- Chats
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from the DMS, ticket system, ERP and chat. demi replaces nothing and links the videos, audio and photos of the test to project, specification, acceptance checklist and bill of materials. Every punch list item hangs on time stamp, still image, checklist item and requirement.
- 2 · PermitPermission Layer
Everyone filmed knows it in advance, and recording happens only with the consent of all participants. The customer sees the report, the punch list and the clips of their machine, but not internal remarks on cost or warranty. Before anything goes to the customer, the project manager releases it, and every release is recorded with name and date.
- 3 · ActIntelligence Layer
The agent writes the draft report from audio and picture, recognises defects and commitments and assigns them to the checklist item and the requirement in the specification. Readings come from the display or the measurement record, never estimated. Checklist items that do not appear in the video are reported as not demonstrated.
How it runs
- 1
Before the test, demi sets up the checklist from specification and acceptance plan.
- 2
The test is filmed with a fixed camera and a phone, and participants comment aloud on what they see.
- 3
The agent writes report and punch list, every item with time stamp, still image, checklist item and owner.
- 4
It shows which checklist items passed or remain open and which requirements were never demonstrated.
- 5
Project manager and customer go through the draft, add to it and sign; open items are tracked as tickets until commissioning on site.
What changes
A complete punch list on the day of the test
Every commitment with a time stamp instead of disputes over what was agreed
Open items tracked as tasks until commissioning
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+144 hfreed per year
Assumptions and calculation
demi writes report and punch list from video and comments, checked against the specification; you release.
5 h → 3.5 h per case
How we calculate
8 factory acceptance tests × 5 h × 30% × 1.0 (manual) × 12 months = 144 h
Value per year, before demi costs
Freed per year+144 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€9,360
gained per year
144 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Are we allowed to film a factory acceptance test at all?
Yes, if all participants agree beforehand. Only announced recordings are made, and you decide how long videos are kept. Whatever should not be in the picture, such as other customers' machines in the hall, stays outside the camera's view.
What happens to points promised verbally during the test?
The agent recognises commitments in the audio, such as “retrofit the guard door before commissioning”, and turns them into an item with time stamp and owner. You see every commitment in the draft and delete what was not meant that way. Only the released list counts.
Can the customer join the test by video conference?
Yes. If the customer joins remotely, that recording is read too, with their consent. Their remarks land in the report just like those on site, with time stamp and name.
What happens to the punch list after the test?
Every open item becomes a ticket with owner and due date, linked to still image and requirement. At commissioning on site the list is back on the table, and demi shows what is done and what is still missing.