Today
Which sheet sizes and bar lengths purchasing buys was decided years ago, for a part mix that has long since changed. Laser and saw logs show every day how much ends up as offcut, remnant sheets and bar ends, but nobody puts them next to orders and prices. So a noticeable share of expensive material goes into the scrap skip, and remnants nobody can assign any more fill the warehouse.
An example
At Rabenhammer Präzisionsteile the agent analyses twelve months of saw and laser logs. Purchasing buys 42CrMo4 round bar Ø 45 in 6-metre bars; the most frequent shaft needs 418 mm raw length. Allowing for a 2 mm saw kerf and a 150 mm remnant per bar, 13 parts fit on a bar, and 54 cm are left over every time. With fixed lengths of 5.65 metres the remnant drops from over 9 to under 4 %, a gain even after a surcharge of €45 per tonne. For the brackets in 8 mm S355, 3,000 × 1,500 sheets are only 61 % utilised on orders under 20 parts, because the last sheet stays half empty; with 2,500 × 1,250 it would be 76 %. Together this saves about 27 tonnes of material a year. Purchasing requests the fixed lengths, and work preparation moves the small orders to the smaller sheets.
Your data, wherever it lives
How much material ends up as offcut is recorded today in the logs of laser, punch and saw; orders and prices sit in the ERP, part geometry in CAD and the remnant list in a spreadsheet in the warehouse. demi reads, understands and links it per material and dimension, with your rights. The AI works out in hours which format pays off, work nobody ever has time for, and purchasing decides.
Where the data lives today
- Machines & sensors
- MES
- ERP
- CAD & drawings
- Office files
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: logs from laser, punch and saw, the MES, ERP, CAD and spreadsheets. demi replaces nothing and links, per material, thickness and diameter, the parts produced, the sheets and bars used, utilisation, remnant sheets and bar ends with orders, prices, surcharges and credit notes for scrap.
- 2 · PermitPermission Layer
Purchase prices, surcharges and terms are visible to purchasing and controlling; work preparation and production see formats, utilisation and remnants. A new standard format applies only once purchasing and work preparation release it, and the release is recorded.
- 3 · ActIntelligence Layer
The agent analyses the logs and uses a cutting-stock method to place the parts actually produced on other sheet sizes and bar lengths. It calculates utilisation, remnant and cost exactly and shows the calculation per format; the language model only explains the result, such as why small orders leave a lot of remnant on large sheets.
How it runs
- 1
demi reads a year of nesting and saw logs, orders and prices from the ERP and the list of remnants.
- 2
Per material, thickness and diameter, the agent shows quantity, utilisation, remnant share and what became of the remnants.
- 3
It places the parts produced on other sheet sizes and bar lengths and recalculates utilisation and remnant.
- 4
With prices, surcharges for special sizes and fixed lengths and the scrap credit, a cost calculation per format follows.
- 5
Purchasing decides on the formats, asks the stockholder for prices and adjusts the order proposals.
What changes
Less offcut per tonne of material bought
Formats that fit today's part mix
Fewer remnants in stock that nobody needs
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+154 hfreed per year
Assumptions and calculation
demi analyses the logs per format and costs the alternatives; purchasing decides.
4 h → 2.4 h per case
How we calculate
8 format reviews × 4 h × 40% × 1.0 (manual) × 12 months = 154 h
Value per year, before demi costs
Freed per year+154 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€10,010
gained per year
154 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Do we need specific nesting software for this?
No. demi reads the logs your nesting software, laser or saw already writes: format, parts, utilisation, remnant sheet or remnant length. How the data gets to demi, we clarify in conversation. If logs are missing for a period, the agent works only with the ones it has and shows the gap.
How does demi test other formats?
The agent uses a cutting-stock method to place the parts actually produced in a period on other sheet sizes and bar lengths and compares utilisation, remnant and cost. That is a calculation you can follow step by step, not an estimate by the language model. Before you change a format, work preparation re-runs a few orders in the nesting software.
Does demi include surcharges for special sizes and fixed lengths?
Yes. The agent reads surcharges, minimum quantities and lead times from quotes, price lists and framework agreements, and the scrap revenue from your scrap dealer's credit notes. So you see per format what material savings, surcharge and scrap revenue add up to.
What happens to our bar ends and remnant sheets?
From the logs, the agent shows which remnants were really used again and which ended up as scrap after months anyway. From that it proposes a minimum size above which storing a remnant pays off. You set the rule, and the warehouse books accordingly.
