Today
Cleaning tenders arrive with room schedules covering thousands of rooms and their own interval rules. Pricing them by hand takes days, and one missed interval shifts the whole bid. Unclear requirements often surface only after the award.
An example
Blank & Kamp prices an office campus with 1,840 rooms. The agent groups them into 12 room types, calculates the monthly hours, at 1,200 m²/h for machine-cleaned corridors, and flags 40 rooms for which the specification gives no interval.
Your data, wherever it lives
Today the room schedule and specification arrive as spreadsheets and PDFs from the tender platform or by e-mail, floor plans as drawings, while your performance and wage rates sit in costing spreadsheets and your sites in the ERP. demi reads, understands and links them per room, with your rights. The AI works out hours and price for thousands of rooms from your own rates on the same day instead of after days of manual work and flags unclear requirements, and the branch manager approves the bid.
Where the data lives today
- Office files
- PDFs
- Web & portals
- E-mails
- CAD & drawings
- ERP
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
The case needs data from spreadsheets, DMS and ERP. demi replaces nothing and turns every room from the room schedule, floor plan and specification into one record with area, floor covering, room type and interval. After the award, demi prepares the site with all its rooms for write-back, only after approval.
- 2 · PermitPermission Layer
Wage and margin data are visible to the estimating team only. The branch manager approves the bid, and the approval is recorded.
- 3 · ActIntelligence Layer
The agent groups rooms by type, area and interval and calculates the hours by fixed rules from your performance and wage rates, not by estimate. It lists unclear requirements, and every line shows its source.
How it runs
- 1
The room schedule and specification come from the tender platform or by e-mail.
- 2
The agent assigns rooms to room types and captures the intervals.
- 3
Hours and price are calculated from your performance rates and wage rates.
- 4
You resolve the flagged rooms and requirements; the branch manager signs off.
- 5
After the award, the data is taken over as a new site.
What changes
Faster, more accurate tender pricing
Unclear requirements found before you bid
Site data ready to use after the award
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+173 hfreed per year
Assumptions and calculation
demi breaks the room schedule and specification into areas and intervals; you check hours and price.
8 h → 5.6 h per case
How we calculate
6 tenders × 8 h × 30% × 1.0 (manual) × 12 months = 173 h
Value per year, before demi costs
Freed per year+173 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€11,245
gained per year
173 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Which room schedule formats can it read?
Spreadsheets, PDF lists and exports from facility management or tender systems. All it needs is rooms with area and use. If columns are named differently, the agent maps them and asks you to confirm.
Does it calculate with our own performance rates?
Yes, only with your rates per room type and floor covering and with your wage groups. The agent never invents performance rates. If a room type has no rate, it flags the gap.
Who can see wage rates and margins?
Only the roles that see them today, usually estimating and the branch manager. People working on the room schedule see areas and intervals, but no wages.
Does it reuse the data once we win?
Yes. Rooms, areas and intervals are taken over to the new site, for cleaning plans and proof of service. Nobody has to enter the room schedule twice.
