Skip to content
Quality, standards & complianceMachinery & Plant EngineeringMetal & MachiningPlastics & PackagingMining & Raw Materials+4

Lockout per machine, step by step

demi builds a lockout procedure per machine from wiring diagrams, manuals and photos of the isolation points, covering every energy type.

Today

Before maintenance, cleaning or clearing a fault, every energy source must be safely isolated: electricity, compressed air, hydraulics, springs, suspended loads, heat. Lockout procedures are often generic or missing, and on a linked line with three control cabinets and two accumulators the maintenance technician has to guess where to isolate. The knowledge sits in wiring diagrams, manuals and the head of the senior electrician, and one forgotten accumulator is enough for a serious accident.

An example

Tannried Möbelwerk in Miesbach wants a dedicated lockout procedure for each of its 64 machines and starts with the panel saw and its loading robot. The agent reads the wiring diagram, the pneumatic and hydraulic diagrams and the manual and finds seven energy sources, among them the air receiver for the clamps, the lifting table, which can drop without its maintenance prop, and the robot's vertical axis. The photos lack the drain valve of the air receiver, and on site the robot's main switch carries a different tag than in the diagram. A fitter photographs both, and the maintenance manager checks the procedure at the saw with the safety officer and releases it in German, Romanian and Croatian.
Fictional company, typical workflow.

Your data, wherever it lives

Wiring diagrams sit today as PDFs and on paper in the control cabinet, fluid diagrams and manuals in binders and on the network drive, equipment files in the DMS and photos of the isolation points, if any, on individual phones. demi reads, understands and links them, with your rights. The AI drafts a machine's lockout procedure in hours instead of days, and a competent person decides what applies at the machine.

Where the data lives today

  • PDFs
  • Scans & paper
  • CAD & drawings
  • Folders & drives
  • DMS & archive
  • Photos, video & audio
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    The case needs data from wiring diagrams, fluid diagrams, manuals, photos and equipment files in the DMS, on drives and in maintenance. demi replaces nothing and links, per machine, every energy source with its isolation point, its equipment tag, the photo on site and the check that proves zero energy. Finished procedures go into the DMS, to the machine and into maintenance only after approval.

  2. 2 · PermitPermission Layer

    Drafts are visible to maintenance, electricians and the safety officer; at the machine only the released version applies. A competent person releases every procedure, and any change to the machine or the wiring diagram sends it back for review. Who released which version is recorded.

  3. 3 · ActIntelligence Layer

    The agent reads wiring and fluid diagrams, finds main switches, valves, accumulators, springs and gravity loads and assigns each point the photo of its isolation point. From this it writes the procedure in a fixed order: notify, shut down, isolate, lock, release stored energy, verify zero energy. If an isolation point is missing from the photos or the diagram and the machine disagree, it reports the gap instead of closing it; translations use a fixed technical glossary.

How it runs

  1. 1

    Maintenance picks the machine, and the agent gathers wiring diagram, fluid diagrams, manual and equipment file.

  2. 2

    It lists every energy type and isolation point and shows where a photo or a detail is missing.

  3. 3

    A fitter photographs the missing isolation points on a walk-round, and the agent assigns the photos.

  4. 4

    The agent drafts the procedure step by step with photos and translates it into the workers' languages.

  5. 5

    A competent person checks it at the machine and releases it; it is posted at the machine with a QR code.

What changes

  • Every machine with its own checked lockout procedure

  • Accumulators, springs and suspended loads are covered too

  • Every worker reads the procedure in their own language

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+144 hfreed per year

Assumptions and calculation

demi drafts the lockout procedure from diagrams and photos; a competent person checks it at the machine.

5 h → 3.5 h per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

8 lockout procedures × 5 h × 30% × 1.0 (manual) × 12 months = 144 h

Value per year, before demi costs

Freed per year+144 h

Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.

= Value per year, before demi costs

+€9,360

gained per year

144 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Which documents does demi need for a lockout procedure?

Whatever exists for the machine: wiring diagram, pneumatic and hydraulic diagrams, operating manual, equipment file and photos of the isolation points. If the wiring diagram is missing, the agent reads nameplates and photos of the control cabinets and shows what an electrician must clarify on site. Old paper diagrams are scanned and read.

Is a procedure from demi valid straight away?

No. Every procedure is a draft until a competent person has checked it at the machine and released it. If the wiring diagram changes later or the machine is modified, the agent flags the procedure for review.

In which languages are the procedures available?

In every language spoken in your plant. The agent translates with a fixed glossary for technical terms, tags and warnings, and photos and symbols make each step clear even without much text. Every language version goes for release together with the original.

Does this also help with cleaning and clearing faults?

Yes, especially there. For frequent tasks such as clearing a jam or intermediate cleaning, the agent writes short procedures that isolate only the energy sources concerned, where the risk assessment allows it. You decide, advised by your safety officer, which tasks may be done that way.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases