Today
Compressors, furnaces, extraction and air conditioning keep running at night and at weekends because nobody sees the load once production stops. The load profile sits in the grid operator's portal, the shift plan somewhere else, and nobody puts the two side by side. So the plant pays every week for power that produces nothing.
An example
On Monday, the agent's report at Fibrana shows that over the weekend the weaving shed's compressed air station drew between 41 and 46 kW for 38 hours, although every air-jet loom was idle, and that the humidification in hall 2 ran non-stop. Together that came to 2,150 kWh, around 390 euros for a single weekend. A leak hunt by maintenance finds twelve leaking couplings, and the humidification now follows the shift plan.
Your data, wherever it lives
Your power consumption sits today in load profiles in the grid operator's portal, in sub-meters on halls and compressors and in energy bills as PDFs; when production runs is in shift plans and the MES. demi reads, understands and links them per machine and hour, with your rights. Every Monday the AI shows what ran without production over the weekend and what it cost, and the area manager decides what gets switched off in future.
Where the data lives today
- Machines & sensors
- MES
- Calendars
- Office files
- PDFs
- Web & portals
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: the grid operator's load profiles, sub-meters on halls and large consumers, machine status from the MES, shift plans and plant holidays. demi replaces nothing and links every quarter-hour value with its machine, hall and planned production time. What must run even without production, such as frost protection, sprinkler pumps or servers, you define once as necessary base load.
- 2 · PermitPermission Layer
Area managers see consumption and alerts for their halls; energy prices and contract data are visible only to energy management and controlling. Machines and areas are evaluated, not people. demi switches nothing off: maintenance implements shutdown rules in the controls or on timers, after the area manager approves them.
- 3 · ActIntelligence Layer
The agent overlays load profile, machine status and shift plan hour by hour, separates the necessary base load from idle running and finds patterns such as every weekend, every public holiday or after the late shift. Kilowatt hours come from the meters, costs from your energy price; the language model only writes the alert. If a large consumer keeps running long after the shift ends, the agent reports it in the chat at once.
How it runs
- 1
demi reads load profiles, sub-meters, machine status and shift plans continuously.
- 2
For every hour without production, the agent separates the necessary base load from idle running.
- 3
If a large consumer keeps running long after the shift ends, the on-call team gets a message at once.
- 4
Every Monday the weekly report arrives: what ran, when, how many kilowatt hours and what it cost.
- 5
The area manager decides on shutdown rules, and the agent measures whether base load falls afterwards.
What changes
Idle running at night and at weekends visible per machine
Less power paid for hours without production
Shutdown rules whose effect is measured
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+86 hfreed per year
Assumptions and calculation
demi sets meter data against shift plans and machine status; you decide what gets switched off.
90 min → 63 min per case
How we calculate
16 load profile reviews × 90 min × 30% × 1.0 (manual) × 12 months = 5,184 min = 86 h
Value per year, before demi costs
Freed per year+86 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€5,590
gained per year
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Which meter data does demi need to find idle running?
To start, the load profile of your main meter in quarter-hour values is enough; the grid operator supplies it. Sub-meters on halls, compressors or furnaces and energy data from machine controls make the alerts more precise. If a large consumer has no meter of its own, the agent shows where one would pay off.
How does demi know when nothing should be running?
From shift plans, plant holidays and machine status in the MES. What must always run, such as frost protection, sprinkler pumps, cooling or servers, you define once. Anything above that without planned production the agent reports as idle running, with meter and time window.
Does demi switch machines off by itself?
No. demi reports and calculates; switching off happens in your controls, by timer or by hand. Maintenance implements shutdown rules after approval, and in the following weeks the agent shows whether base load really falls.
Does it track who forgot to switch off?
No. Alerts name machine, hall and time window, not people. Who sees which areas and which costs follows the roles in your plant; energy prices are visible only to those allowed to see them.
