Today
Whoever documents container damage first wins the dispute between depot, haulier and shipping line. At the gate the inspector walks around the container, ticks damage on a paper form and copies container and seal numbers, often in the rain and under time pressure. Hardly anyone checks whether the CSC plate is still valid. Later the photos are missing, the damage location is vague, a transposed digit in the container number makes the receipt worthless, and the repair costs stay with the depot.
An example
Nordhanse takes in around 100 containers a day at its empty container depot in Hamburg. At 6:50 a.m. a shipping line's 40 ft high cube rolls through the gate, and the inspector photographs it in 90 seconds. demi reads the container number and check digit, finds the return in the booking system and marks three findings: a dent in the left side panel, a hole in the roof panel and a damaged door gasket. The dent was already documented at release six weeks earlier; the other two are new. The CSC plate gives March as the next examination, so the container is still approved. The inspector confirms, the shipping line receives photos and a repair estimate of 640 euros once depot management releases them, and the haulier is informed before the driver leaves the yard. On a second container that morning the CSC examination expired in July; the agent blocks it for release until it has been examined.
Your data, wherever it lives
What belongs to a container interchange is spread out today: photos on the inspectors' phones, paper forms in the gate house, shipping line bookings in portals and e-mails, earlier interchanges in the depot system's database, repair prices in spreadsheets. demi reads, understands and links it per container and interchange, with your rights. AI writes the receipt while the truck is still at the gate and marks every new damage; what goes to shipping lines and hauliers is released by your depot management.
Where the data lives today
- Photos, video & audio
- Phone & voice
- Databases
- Web & portals
- E-mails
- Office files
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: photos, the gate and depot system, shipping line bookings and the mailbox. demi replaces nothing and links, per container, the gate photos with container number, type, seal, truck and driver, the shipping line's booking or release and earlier interchanges of the same container. Every interchange then sits in one record with condition, time and parties.
- 2 · PermitPermission Layer
Inspectors and the gate see container, booking and photos; only depot management and billing see repair prices and contracts with shipping lines. An interchange receipt counts only once the inspector has confirmed it; repair estimates and damage reports go to the shipping line or haulier only after release, and every release is logged.
- 3 · ActIntelligence Layer
The agent reads container number and check digit, type code and seal from the photos, marks dents, cracks, holes and bent parts with their location on the container and compares them with the condition at the last interchange, so only new damage counts. From the CSC plate it reads the next examination date or the number of the continuous examination programme and reports an expired date. From the findings it drafts the interchange receipt and a repair estimate with the usual CEDEX codes.
How it runs
- 1
The inspector photographs the container at the gate from all sides, plus the door with seal and the CSC plate, with a phone or tablet.
- 2
demi reads container number, check digit, type and seal and finds the shipping line's booking or release.
- 3
The agent marks damage by location, compares with the last interchange and checks the date on the CSC plate.
- 4
The inspector checks the markings, adds what is missing by voice note and confirms the receipt before the truck leaves the gate.
- 5
After release, new damage goes with photos and a repair estimate to the shipping line or haulier; containers without a valid examination are blocked.
What changes
Every damage documented with photo, location and time before the truck has left
Expired CSC examinations caught at the gate, not at the port
Fewer repair costs left with the depot
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+432 hfreed per year
Assumptions and calculation
demi reads number, plate and damage from the photos and drafts the receipt; the inspector confirms.
6 min → 4.2 min per case
How we calculate
1,200 gate container inspections × 6 min × 30% × 1.0 (manual) × 12 months = 25,920 min = 432 h
Value per year, before demi costs
Freed per year+432 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€28,080
gained per year
432 h ÷ 1,760 h per role = 0.2 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
How does demi know whether damage is new?
By comparing with the last interchange of the same container. demi keeps the photos and findings of every interchange and puts them next to the new ones the next time. What was already documented at release, the agent marks as known; only new damage goes into the receipt and the repair estimate.
What does demi read from the CSC plate?
The approval reference, the date of manufacture, the weights and above all the examination: either the date of the next examination or the number of a continuous examination programme. If the date has passed or the plate is illegible, the agent reports it at the gate, and the container is not released again until this is cleared up.
Does this replace the inspector at the gate?
No. The inspector takes the photos, checks the markings, adds what a photo cannot show, such as smell or moisture inside, and confirms the receipt. demi takes over copying, ticking and looking things up, so the inspector checks more closely in the same time.
How do the receipt and repair estimate reach the shipping line?
After release, in the form the shipping line asks for: as a receipt with photos, as a repair estimate with the industry's damage codes or as a data record for its portal. The agent follows up queries, repair approval and billing until the case is closed.
