Skip to content
Planning & productionMining & Raw Materials

Unlock drill logs and mine plans

Old paper drill logs become one table per borehole with depth, rock and quality, linked to mine plans, lab results and extraction planning.

Today

What is known about the deposit sits in hundreds of drill logs and strata logs from five decades, many handwritten, some in old coordinate and height systems. Add mine plan sheets on paper and in CAD and lab reports on rock quality. For every extension, permit application and new extraction plan someone reads it all again, and a weathered zone often shows up only when it appears in the quarry face.

An example

Montanis Hartsteinwerke is planning to extend its quarry to the south. The archive holds 212 drill logs from 1968 to 2015, 140 of them handwritten and with location and height in old East German reference systems, plus 38 mine plan sheets and lab reports with Los Angeles coefficient and freeze-thaw resistance. The agent reads it all, converts coordinates and heights and records overburden, weathered zone and sound gneiss for each borehole. It shows that in the south field weathering reaches 14 m in nine boreholes instead of the assumed 6 m, and that two boreholes 40 m apart contradict each other. The geologist places two new exploration holes exactly there before the extraction plan is settled.
Fictional company, typical workflow.

Your data, wherever it lives

Drill logs and strata logs sit today on paper in archive cabinets and as scans in folders, the mine plans as paper sheets, PDFs and CAD drawings with the mine surveyor, lab results in test reports, spreadsheets and the lab database. demi reads, understands and links them per borehole and extraction area, with your rights. Knowledge of the deposit is then ready in days instead of months, and geology and site management decide where to extract.

Where the data lives today

  • Scans & paper
  • Folders & drives
  • PDFs
  • CAD & drawings
  • Office files
  • Databases
Data LayerOne view of everything, with your rights

How demi solves it

Three layers in this order: connect the data first, then the rights, then the AI.

  1. 1 · ConnectData Layer

    The case needs data from the drilling archive, the mine plans, CAD, GIS and the lab. demi replaces nothing and turns every drill log into a record: location, collar elevation, final depth and, per layer, top and bottom, rock type, weathering, jointing and water inflow. Each borehole is linked with the lab results from its cores, with the mine plan sheets and with the extraction area it lies in.

  2. 2 · PermitPermission Layer

    Drilling data and the deposit model are visible to geology, mine surveying and site management; reserve figures and extension plans stay with management and site management. The mine surveyor keeps the mine plans: demi shows where plans and drilling data disagree, and only what the surveyor releases goes in. Documents for authorities and consultants go out only after site management releases them.

  3. 3 · ActIntelligence Layer

    The agent also reads handwriting, stamps and sketches on yellowed forms and flags uncertain values for confirmation. It maps old rock names to today's classification and converts old coordinates and heights with fixed transformation rules, keeping the original alongside. It shows contradictions between neighbouring boreholes and gaps in the field and answers questions such as: where is the weathered zone thicker than 8 m? Figures come from the logs and lab reports; the language model only explains.

How it runs

  1. 1

    Drill logs, strata logs, mine plan sheets and lab reports are scanned or taken over from folders and CAD.

  2. 2

    The agent reads every log and records location, elevation and layers with depth, rock type and weathering for each borehole.

  3. 3

    It brings old coordinates, heights and rock names up to date and shows uncertain values with the image snippet for confirmation.

  4. 4

    It links each borehole with lab results and extraction area and shows thicknesses, qualities and gaps on the map.

  5. 5

    Geology and mine surveying confirm the data; site management decides on new boreholes and extraction planning.

What changes

  • Knowledge of the deposit as one table per borehole

  • Weak zones and gaps found before extraction is planned

  • No more rereading old logs for every extension

What does it bring you?

Check it with your own numbers

Every starting value is an assumption you can change. The calculation sits right below, step by step.

Assumption, editable

Your numbers

Result

+108 hfreed per year

Assumptions and calculation

demi answers deposit questions from every borehole and lab result; you decide.

3 h → 2.1 h per case

How does it run today?

What is already digital saves less: the factor lowers the share demi brings.

How we calculate

10 deposit questions × 3 h × 30% × 1.0 (manual) × 12 months = 108 h

Value per year, before demi costs

Freed per year+108 h

Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.

= Value per year, before demi costs

+€7,020

gained per year

108 h ÷ 1,760 h per role = 0.1 full-time roles

An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.

Combine with more cases and get the package

Questions about this use case

Can demi really read handwritten drill logs?

Yes: depths, rock names, abbreviations, stamps and simple sketches, even on yellowed, folded or skewed scans. Every value read shows the image snippet it comes from. Where the agent is unsure, it asks for confirmation instead of guessing.

What happens to old coordinates, heights and rock names?

The agent converts old location and height data into today's reference system using fixed, documented rules and keeps the original value alongside. It maps old rock names to today's classification. Geology confirms a new mapping once, and it then applies to all logs.

Does this replace our GIS or deposit software?

No. demi delivers the confirmed drilling data as tables and points for your GIS, CAD and deposit software. Modelling, reserve estimation and extraction planning stay where you do them today, just with complete data.

Who may change the mine plans?

Whoever keeps them today, meaning the mine surveyor. demi shows where the mine plans and the drilling data disagree, for example a borehole missing from the plans. What belongs in the plans, the surveyor decides and enters.

See this case with your data

In the demo we show you the workflow on your own systems.

Your configurator

No use cases yet

Your configurator is still empty

Add a use case from any card or case page and see what it brings per year, with the calculation. Free, no sign-up, no commitment: try it out and change any number.

Browse use cases