Today
Structural timber carries its strength class, such as C24, and you must be able to prove it: for CE marking, for surveillance by the notified body and for every complaint. Each board's values sit in the grading machine's export, moisture content in the kiln logs, spot checks and visual override in spreadsheets and on paper, orders in the ERP. Finding out whether a disputed delivery really was C24 takes days.
An example
Tannried Möbelwerk grades spruce for carpenters in its own planing mill, about 60 m³ a day in two shifts. A carpenter complains that beams from a C24 delivery twisted after installation. The agent shows within minutes that the delivery's 18 packs come from kiln 3, whose drying ended half a day early on 9 October after a sensor fault, and the spot checks of that shift show 22 per cent moisture instead of 20 at most. Machine readings and class are correct; the cause is moisture. Quality blocks seven more packs from that batch for re-drying, and sales replies to the carpenter with the records.
Your data, wherever it lives
Today each board's values sit in the grading machine's export, moisture content in the kiln logs, spot checks and visual override in spreadsheets and on paper, and orders and delivery notes in the ERP. demi reads, understands and links them per pack and delivery, with your access rights. The AI then gathers the proof for a delivery in minutes, where someone today searches for days, and your quality team decides.
Where the data lives today
- Machines & sensors
- ERP
- MES
- QM system
- Office files
- Scans & paper
How demi solves it
Three layers in this order: connect the data first, then the rights, then the AI.
- 1 · ConnectData Layer
Data sources in this case: the grading machine export, kiln logs, the ERP, the MES, the QM system, spreadsheets and paper records. demi replaces nothing and links, per board and pack, the machine's readings, the assigned class, the moisture content from drying, spot checks and visual override to order, delivery note and declaration of performance. So every delivery can be traced back to the shift and the machine setting.
- 2 · PermitPermission Layer
Machine readings and test records are visible to production and quality; sales sees class and proof per delivery. Whether a pack is blocked, downgraded or regraded is decided by the person responsible for factory production control; every decision is recorded with name and date.
- 3 · ActIntelligence Layer
The agent checks every shift against your rules: calibration check done, moisture within limits, spot checks matching the class, visual override recorded. It shows where grading and spot checks diverge, for instance when a kiln was too wet or a class is assigned unusually often. Classes and limits come from the standard and the machine settings; the language model only explains the deviation.
How it runs
- 1
The grading machine measures every board and assigns the strength class; the grader marks what the machine cannot see.
- 2
The agent links per pack the readings, class, kiln moisture and the order in the ERP.
- 3
For every shift it checks calibration, spot checks and visual override against your rules.
- 4
Where grading and spot checks diverge, it reports the packs and deliveries affected.
- 5
Quality decides on blocking or downgrading and releases the proof per delivery.
What changes
Every delivery with strength class and proof down to the shift
Deviations caught in the mill, not on site
Surveillance audits and complaints answered with records on demand
What does it bring you?
Check it with your own numbers
Every starting value is an assumption you can change. The calculation sits right below, step by step.
Your numbers
Result
+96 hfreed per year
Assumptions and calculation
demi checks every shift against your rules and gathers the proof per delivery; you release.
30 min → 18 min per case
How we calculate
40 grading shifts × 30 min × 40% × 1.0 (manual) × 12 months = 5,760 min = 96 h
Value per year, before demi costs
Freed per year+96 h
Assumption: labour cost of €49.50 per hour in German manufacturing in 2025 (Destatis), plus workplace, IT and overheads.
= Value per year, before demi costs
+€6,240
gained per year
96 h ÷ 1,760 h per role = 0.1 full-time roles
An estimate, not a promise. The starting values are assumptions for an industrial company with 150 to 500 people.
Combine with more cases and get the packageQuestions about this use case
Which grading machine data can demi read?
What the machine outputs per board, usually as an export file: ID, dimensions, density, natural frequency or modulus of elasticity, knots and the assigned class. Add the calibration checks and the settings the machine is approved for. How the export reaches demi, we clarify in conversation.
Does demi replace the visual override?
No. Fissures, wane, insect damage and other features the machine cannot detect are still checked by a trained grader. demi records the grader's decisions per pack and shows when a shift rejects unusually much or little.
How does demi help with the declaration of performance and CE marking?
For each delivery demi gathers strength class, species, grading method, moisture content and the number of the declaration of performance, and checks that the factory production control records are complete. Labels and delivery papers go out only after release. At the next surveillance visit you have the records of every shift together.
What does demi show when structural timber is claimed?
The path of the disputed goods back to the pack: shift, machine readings, class, kiln, spot checks and visual override. So you quickly see whether the cause lies in grading, drying or on site. The agent drafts the reply to the customer, which goes out after your release.
